| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/25/2026 | Permit Issued | ARTIC ICE MECHANICAL LLC | Air Conditioning Systems | Cooling |
| 08/19/2026 | Permit Issued | ARTIC ICE MECHANICAL LLC | Air Conditioning Systems | Cooling |
| 07/14/2026 | Signed-off | ARTIC ICE MECHANICAL LLC | Air Conditioning Systems | Cooling Cooper & Hunter CHV6-144URB 9,430 CFM · Vrf Outdoor ×2 Spinnaker SPHWC-120-B-32-XX 4,000 CFM · Ahu ×2 |
| 06/23/2026 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric MITSUBISHI / PLFY-L12NFMU-A 335 CFM · Vrf Indoor ×8 MITSUBISHI / PLFY-L05NFMU-A 280 CFM · Vrf Indoor ×2 Mitsubishi/ MXZSM48NLHZ 54,000 BTU · Condensing Unit ×2 Trane Trane/ TPLFY012FM140B 335 CFM · Vrf Indoor ×2 Ventilation Greenheck Greenheck sq-140HP-VG 2,200 CFM · Exhaust Fan ×2 Greenheck AX-41-190-0611 2,200 CFM · Exhaust Fan ×1 |
| 06/25/2025 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Heating and Air Conditioning Systems | Heat / Cool Trane Trane TURYE3123BN41AN 350,000 CFM · Vrf Outdoor ×2 |
| 06/25/2025 | — | — | Heating Systems | Heating Price Price FCHG-20 450 CFM · Fan Coil Indoor ×1 |
| 08/23/2023 | Signed-off | TITAN CONSTRUCTION MANAGE | Heating and Air Conditioning Systems | Heat / Cool Xetex XAH-15000-RT-DX-HG-HI-FF-RC-AC 703,000 BTU · Rooftop Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/23/2026 | Permit Issued | A PLUS PLUMBING CORP | 43 heads |
| 06/25/2025 | — | — | 58 heads |
| 06/25/2025 | Permit Issued | A PLUS PLUMBING CORP | 21 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/23/2026 | Permit Issued | A PLUS PLUMBING CORP | Water/Sanitary |
| 06/25/2025 | Permit Issued | A PLUS PLUMBING CORP | Water/Sanitary |
| 06/25/2025 | — | — | — |
| 08/23/2023 | Permit Issued | HENRY MYERS P & H, INC | Gas |
| 11/10/2022 | Permit Issued | HENRY MYERS P & H, INC | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/25/2026 | Permit Issued | M&T ELECTRICAL LLC | General Wiring |
| 07/31/2025 | Permit Issued | M.C. ELECTRICAL NY INC | General Wiring |
| 12/08/2024 | Permit Issued | NEW YORK MECHANICAL | General Wiring |
| 09/06/2024 | Permit Issued | RICHARD NEU | — |
| 05/16/2024 | Cancelled | TRIBOROUGH ELECTRIC, INC | General Wiring |
| 03/15/2022 | Complete | PATRIOT ELECTRIC CORP | 1 meters, 1 new_meters |
| 03/15/2022 | Complete | PATRIOT ELECTRIC CORP | General Wiring |
| 03/08/2022 | Complete | PATRIOT ELECTRIC CORP | — |
| 05/04/2021 | Complete | IAG ELECTRIC, INC | — |
| 07/28/2020 | Complete | IAG ELECTRIC, INC | — |
| 07/15/2019 | Complete | IAG ELECTRIC, INC | General Wiring |
| 06/21/2019 | Permit Issued | RICHARD NEU | — |
| 02/14/2018 | Complete | CATELLO ELEC'L CONT., INC | General Wiring, Lighting |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/03/2026 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Steel, Concrete, Masonry |
| 02/01/2023 | — | — | 1 scope_items |
| 11/04/2022 | Permit Issued | TITAN CONSTRUCTION MANAGE | Masonry |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/03/2023 | Permit Issued | ARSENAL SCAFFOLD INC | Scaffold |
| Owner | Filings | Most Recent |
|---|---|---|
| TOPLINE NYC INC. | 7 | 03/22/2026 |
| TOPLINE NYC CONTRACTING | 3 | 03/22/2026 |
| BENCHMARK BUILDERS | 7 | 03/22/2026 |
| WEST RAC CONTRACTING | 3 | 03/22/2026 |
| POLYTECHNIC PREP SCHOOL | 2 | 03/22/2026 |
| OWNER OF 9216 7 AVENUE | 2 | 03/22/2026 |
| POLY PREP COUNTRY DAYS SCHOOL | 55 | 03/22/2026 |
| TRIAD | 1 | 03/22/2026 |
| POLY PREP DAY SCHOOL | 41 | 03/21/2026 |
| 9216 7 AVENUE | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| CONCESSI ENGINEERING, P.C. | 16 | 08/25/2026 |
| SAGE AND COOMBE ARCHITECTS | 15 | 08/03/2026 |
| URBAN INTEGRATIONS | 1 | 07/22/2026 |
| KOHLER RONAN, LLC | 24 | 06/23/2026 |
| KPFF CONSULTING ENGINEERS | 12 | 05/18/2026 |
| SYNC ARCHITECTURE P.C | 2 | 10/15/2025 |
| ASR ENGINEERING PC | 1 | 09/05/2024 |
| NEW YORK ENGINEERING ASSOC., P.C. | 3 | 02/02/2024 |
| KZ ENGINEERING, P.C | 2 | 03/03/2023 |
| BUILDING CONSULTING ENGINEERING | 1 | 02/07/2023 |
| AME SERVICES INC | 2 | 02/01/2023 |
| VALJATO ENGINEERING PC | 1 | 11/08/2022 |
| LAHITA ENGINEERING LLC | 1 | 10/28/2022 |
| INTEGRAL ENGINEERING SERVICES, PLLC | 1 | 06/17/2022 |
| RAFAEL VINOLY ARCHITECTS PC | 2 | 11/08/2021 |
| JOSEPH PELL LOMBARDI, ARCHITECT | 5 | 08/26/2021 |
| ASHRAF CORP | 1 | 06/22/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| J CALLAHAN CONSULTING | 84 | 03/21/2026 |
| MP DESIGN AND CONSTRUCTION | 26 | 03/21/2026 |
| J. CALLAHAN CONSULTING, INC. | 4 | 03/21/2026 |
| SYNERGY BUILDING CONSULTANTS | 2 | 03/21/2026 |
| VALJATO ENGINEERING P C | 2 | 03/21/2026 |
| ADVANCED BUILDERS SERVICES | 2 | 03/21/2026 |
| NEW YORK ENGINEERING ASSOCIATES P C | 6 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 3 | 03/21/2026 |
| AME SERVICES | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| BENCHMARK BUILDERS LLC | General Contractor | 36 | 07/08/2026 |
| TITAN CONSTRUCTION MANAGEMENT | General Contractor | 16 | 07/08/2026 |
| THE LANDTEK GROUP INC | General Contractor | 11 | 07/08/2026 |
| BROOKLINE MECHANICAL INC | General Contractor | 6 | 03/21/2026 |
| TOPLINE NYC INC | General Contractor | 6 | 03/21/2026 |
| M&T PLBG AND HTG CO., INC | Plumbing | 6 | 07/08/2026 |
| STARR TENT & EVENT GROUP | General Contractor | 5 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 5 | 07/22/2026 |
| HENRY MYERS P & H, INC | Plumbing | 5 | 07/08/2026 |
| RUCCI PLUMBING & HEATING | Plumbing | 4 | 07/08/2026 |
| ARTIC ICE MECHANICAL LLC | General Contractor | 4 | 09/07/2026 |
| A PLUS PLUMBING CORP | Plumbing | 3 | 07/22/2026 |
| TOPLINE NYC CONTRACTING | General Contractor | 3 | 03/21/2026 |
| CS BRIDGE CORP | General Contractor | 2 | 03/21/2026 |
| ARSENAL SCAFFOLD INC | General Contractor | 2 | 03/21/2026 |
| HENRY MYERS PLUMBING & H | General Contractor | 2 | 07/08/2026 |
| RITE-WAY INTERNAL REMOVAL INC | General Contractor | 2 | 03/21/2026 |
| A PLUS PLUMBING CORP | Fire Protection | 2 | 07/22/2026 |
| A & F FIRE PROTECTION CO | Fire Protection | 2 | 07/08/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 1 | 07/23/2026 |
| JAVIER VALERA ACERO | Electrical | 1 | 03/21/2026 |
| A + SPRINKLER CORP | Fire Protection | 1 | 06/27/2026 |
| PATRIOT ELECTRIC CORP | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CONCESSI ENGINEERING, P.C | 540 | 26 | 08/25/2026 |
| ETI CONSULTANTS LLC | 7694 | 23 | 05/21/2024 |
| NEW YORK ENGINEERING ASSO | 851 | 2 | 02/02/2024 |
| S&S CONCRETE & SOIL TESTI | 1008 | 3 | 11/10/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | ARTIC ICE MECHANICAL LLC | 09/03/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | ARTIC ICE MECHANICAL LLC | 09/03/2026 |
| DOB NOW | Mechanical Systems | Signed-off | ARTIC ICE MECHANICAL LLC | 08/05/2026 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SPRING SCAFFOLDING LLC | 07/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | A PLUS PLUMBING CORP | 07/20/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM CONSTRUCTION MGMT LLC | 07/20/2026 |
| DOB NOW | Sprinklers | Permit Issued | A PLUS PLUMBING CORP | 07/20/2026 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 07/16/2026 |
| DOB NOW | Plumbing | Permit Issued | A PLUS PLUMBING CORP | 07/09/2026 |
| DOB NOW | Sprinklers | Permit Issued | A PLUS PLUMBING CORP | 05/18/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM CONSTRUCTION MGMT LLC | 05/13/2026 |
| DOB NOW | Structural | Permit Issued | JRM CONSTRUCTION MGMT LLC | 12/08/2025 |
| DOB NOW | General Construction | Signed-off | STARR TENT & EVENT GROUP | 10/20/2025 |
| DOB NOW | Sprinklers | Permit Issued | A + SPRINKLER CORP | 08/01/2025 |
| DOB NOW | Plumbing | Permit Issued | A PLUS PLUMBING CORP | 08/01/2025 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 07/14/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | TOPLINE NYC INC | 09/05/2024 |
| DOB NOW | Supported Scaffold | Permit Issued | TOPLINE NYC INC | 09/05/2024 |
| DOB NOW | Mechanical Systems | Signed-off | ARTIC ICE MECHANICAL LLC | 06/12/2024 |
| DOB NOW | Mechanical Systems | Signed-off | BENCHMARK BUILDERS LLC | 05/31/2024 |
| DOB NOW | Foundation | Permit Issued | TITAN CONSTRUCTION MANAGE | 04/02/2024 |
| DOB NOW | Boiler Equipment | Signed-off | RUCCI PLUMBING & HEATING | 01/16/2024 |
| DOB NOW | Plumbing | Signed-off | RUCCI PLUMBING & HEATING | 01/16/2024 |
| DOB NOW | Mechanical Systems | Signed-off | TITAN CONSTRUCTION MANAGE | 01/16/2024 |
| DOB NOW | Mechanical Systems | Signed-off | TITAN CONSTRUCTION MANAGE | 12/18/2023 |
| DOB NOW | Mechanical Systems | Signed-off | TITAN CONSTRUCTION MANAGE | 12/18/2023 |
| DOB NOW | General Construction | Signed-off | TITAN CONSTRUCTION MANAGE | 11/30/2023 |
| DOB NOW | Mechanical Systems | Signed-off | TITAN CONSTRUCTION MANAGE | 11/30/2023 |
| DOB NOW | Mechanical Systems | Signed-off | TITAN CONSTRUCTION MANAGE | 11/30/2023 |
| DOB NOW | Mechanical Systems | Signed-off | TITAN CONSTRUCTION MANAGE | 11/30/2023 |
| DOB NOW | Boiler Equipment | Signed-off | M&T PLBG AND HTG CO., INC | 11/16/2023 |
| DOB NOW | Plumbing | Signed-off | RUCCI PLUMBING & HEATING | 11/09/2023 |
| DOB NOW | Boiler Equipment | Signed-off | RUCCI PLUMBING & HEATING | 11/08/2023 |
| DOB NOW | Plumbing | Permit Issued | HENRY MYERS P & H, INC | 11/03/2023 |
| DOB NOW | Plumbing | Permit Issued | HENRY MYERS P & H, INC | 10/25/2023 |
| DOB NOW | Plumbing | Signed-off | M&T PLBG AND HTG CO., INC | 10/11/2023 |
| DOB NOW | General Construction | Permit Issued | BENCHMARK BUILDERS LLC | 10/03/2023 |
| DOB NOW | Plumbing | Permit Issued | HENRY MYERS P & H, INC | 08/28/2023 |
| DOB NOW | Construction Fence | Signed-off | BENCHMARK BUILDERS LLC | 06/27/2023 |
| DOB NOW | Structural | Signed-off | BENCHMARK BUILDERS LLC | 06/14/2023 |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/04/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/23/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/15/2026 | No Access-Final PL - Up to 9 Requested Floors | No Access | View ↗ |
| 11/07/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 09/03/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 05/31/2024 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 03/07/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/29/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/26/2024 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 02/12/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/21/2023 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 10/31/2023 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 10/18/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/17/2023 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 10/13/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/13/2023 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 10/10/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/05/2023 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 10/02/2023 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 09/27/2023 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 09/27/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/22/2023 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 09/22/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/20/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/05/2023 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/19/2026 | HVAC-R and service water heating system controls | Robert Concessi | energy_progress |
| 08/19/2026 | HVAC-R and service water heating equipment | Robert Concessi | energy_progress |
| 08/19/2026 | HVAC-R and service water piping design and insulation | Robert Concessi | energy_progress |
| 08/18/2026 | Final | Robert Concessi | progress |
| 08/18/2026 | Mechanical Systems | Robert Concessi | special |
| 08/03/2026 | Fire-Resistance Rated Construction | Robert Concessi | progress |
| 08/03/2026 | Sprayed fire-resistant materials | — | special |
| 08/03/2026 | Fire-Resistant Penetrations and Joints | Robert Concessi | special |
| 08/03/2026 | Insulation placement and R values | Jennifer Sage | energy_progress |
| 08/03/2026 | Fenestration areas | Jennifer Sage | energy_progress |
| 08/03/2026 | Fenestration air leakage | Jennifer Sage | energy_progress |
| 08/03/2026 | Interior lighting power | Jennifer Sage | energy_progress |
| 08/03/2026 | Air barrier - visual inspection | Jennifer Sage | energy_progress |
| 08/03/2026 | Lighting controls | Jennifer Sage | energy_progress |
| 08/03/2026 | Fenestration and door U-factor and product ratings | Jennifer Sage | energy_progress |
| 08/03/2026 | Final | Robert Concessi | progress |
| 08/01/2026 | HVAC-R and service water heating equipment | Robert Concessi | energy_progress |
| 08/01/2026 | Maintenance information | Robert Concessi | energy_progress |
| 08/01/2026 | HVAC-R and service water piping design and insulation | Robert Concessi | energy_progress |
| 08/01/2026 | HVAC-R and service water heating system controls | Robert Concessi | energy_progress |
| 08/01/2026 | Final | Robert Concessi | progress |
| 08/01/2026 | Mechanical Systems | Robert Concessi | special |
| 08/01/2026 | Post-installed Anchors | Robert Concessi | special |
| 08/01/2026 | Fire-Resistant Penetrations and Joints | Robert Concessi | special |
| 06/30/2026 | Maintenance information | Robert Concessi | energy_progress |