← Back
Primarily 2 family with 1 store or office
9218 4 AVENUE
BROOKLYN · BIN 3155115
💬 Discuss this project
1926Year Built
3Stories
S2Building Class
R6AZoning
3,805 sfGross Floor Area
3Units
4 Open Violations 3 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 2,032 sf lot · 1.87 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CX CONSULTING CORP211/18/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
G DESIGN DRAFTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H BRONNER & SON PLBG & HTGPlumbing507/08/2026
Building Lifecycle
All (23)Filed (2)Permit Issued (1)Signed Off (1)Violation (10)Inspection (4)Special Inspection (5)
12/16/2021
Signed off — Alteration
INSTALL (2) NEW BOILER & (2) NEW H.W.H. FOR THE DWELLING UNIT ON THE 2ND & 3RD FLOOR. BOILER JOBS WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00575854-I1
11/26/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/22/2021
Special inspection requirement — Energy Code Compliance Inspections
XIU CHEN
11/22/2021
Special inspection requirement — HVAC-R and service water heating equipment
XIU CHEN
11/22/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
XIU CHEN
11/22/2021
Special inspection requirement — HVAC-R and service water heating system controls
XIU CHEN
11/22/2021
Special inspection requirement — Maintenance information
XIU CHEN
11/18/2021
Filed — Alteration
INSTALL (2) NEW BOILER & (2) NEW H.W.H. FOR THE DWELLING UNIT ON THE 2ND & 3RD FLOOR. BOILER JOBS WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00575854-P1
11/17/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/10/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/10/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/08/2021
Permit issued — Plumbing
B00575854-I1-PL
08/20/2021
Filed — Alteration
INSTALL (2) NEW BOILER & (2) NEW H.W.H. FOR THE DWELLING UNIT ON THE 2ND & 3RD FLOOR. BOILER JOBS WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00575854-I1
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/22/1990
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/21/1989
Violation issued (ECB, closed)
Public Assembly
06/14/1989
Violation issued (ECB, closed)
Public Assembly
03/29/1989
Violation issued (ECB, open)
Public Assembly
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offH BRONNER & SON PLBG & HT10/08/2021
BIS—ISSUEDPAUL SIGNS, INC01/28/2008
BISPLISSUEDG.A PLBG,HTG,SPR INC01/23/2004
BISEQISSUEDMANDA CORPORATION01/05/2004
BISOTISSUEDMANDA CORPORATION01/05/2004
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/26/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/17/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/10/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/10/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/22/2021Energy Code Compliance InspectionsXIU CHENprogress
11/22/2021HVAC-R and service water heating equipmentXIU CHENenergy_progress
11/22/2021HVAC-R and service water piping design and insulationXIU CHENenergy_progress
11/22/2021HVAC-R and service water heating system controlsXIU CHENenergy_progress
11/22/2021Maintenance informationXIU CHENenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/01/2026B00575854-I1Request digital key ↗
09/01/2026B00575854-P1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/01/2026B00575854-I1Open ↗
09/01/2026B00575854-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B00575854-I1Open ↗
08/23/2026B00575854-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00575854-I1Open ↗
09/01/2026B00575854-P1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00575854-I1Open ↗