1905Year Built
2Stories
B1Building Class
R6Zoning
1,908 sfGross Floor Area
2Units
Two family brick · 2,003 sf lot · 0.95 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 16 docs
Floor 61p · 1 filing · 16 docs
Floor 5
Floor 4
Floor 3
Floor 22p · 1 filing · 16 docs
Floor 1
Cellar2p · 1 filing · 16 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/04/2025$1.6M—— → —$839/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JIAN ENGINEERING PLLC208/25/2025
YANG ENGINEERING LLC105/21/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO603/21/2026
Building Lifecycle
All (68)Filed (3)Objection (35)Special Inspection (30)
04/21/2026
Objection resolved — Addressed
04/17/2026
Objection resolved — Addressed
01/06/2026
Objection resolved — Open
12/23/2025
Objection resolved — Addressed
11/25/2025
Objection resolved — Addressed
11/25/2025
Objection resolved — Addressed
09/30/2025
Objection resolved — Addressed
09/29/2025
Objection resolved — Addressed
09/12/2025
Objection resolved — Addressed
09/10/2025
Objection resolved — Resolved
09/09/2025
Objection raised — Structural
09/08/2025
Objection raised — Structural
08/25/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 6-STORY BUILDING WITH CELLAR FOR RESIDENTIAL AND COMMUNITY FACILITY MIXED USE WITH VERTICAL AND HORIZONTAL ENLARGEMENT. OBTAIN NEW C OF O
B01227543-S3
08/25/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 6-STORY BUILDING WITH CELLAR FOR RESIDENTIAL AND COMMUNITY FACILITY MIXED USE WITH VERTICAL AND HORIZONTAL ENLARGEMENT. OBTAIN NEW C OF O
B01227543-S2
08/25/2025
Special inspection requirement — Structural Steel - High Strength Bolting
08/25/2025
Special inspection requirement — Structural Steel - Welding
08/25/2025
Special inspection requirement — Masonry
08/25/2025
Special inspection requirement — Structural Cold-Formed Steel
08/25/2025
Special inspection requirement — Structural Steel - Details
08/25/2025
Special inspection requirement — Concrete - Cast-In-Place
08/07/2025
Objection resolved — Addressed
08/07/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/08/2025
Objection resolved — Addressed
07/01/2025
Objection resolved — Addressed
07/01/2025
Special inspection requirement — Final
06/19/2025
Objection resolved — Addressed
06/19/2025
Objection resolved — Addressed
06/03/2025
Objection raised — Other
06/03/2025
Objection raised — Scope
06/03/2025
Objection raised — Scope
06/03/2025
Objection raised — Zoning
06/03/2025
Objection raised — Zoning
06/03/2025
Objection raised — Structural
06/03/2025
Objection raised — Structural
06/03/2025
Objection raised — Energy
06/03/2025
Objection raised — Zoning
06/03/2025
Objection raised — Structural
06/03/2025
Objection raised — Fire_Protection
06/03/2025
Objection raised — Admin
06/03/2025
Objection raised — Fire_Protection
06/03/2025
Objection raised — Cost
06/03/2025
Objection raised — Fire_Protection
06/03/2025
Objection raised — Admin
05/21/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 6-STORY BUILDING WITH CELLAR FOR RESIDENTIAL AND COMMUNITY FACILITY MIXED USE WITH VERTICAL AND HORIZONTAL ENLARGEMENT. OBTAIN NEW C OF O
B01227543-I1
05/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
05/19/2025
Special inspection requirement — Lighting in dwelling units
05/19/2025
Special inspection requirement — Protection of exposed foundation insulation
05/19/2025
Special inspection requirement — Electrical motors and elevators
05/19/2025
Special inspection requirement — Exterior lighting power
05/19/2025
Special inspection requirement — Vestibules
05/19/2025
Special inspection requirement — Interior lighting power
05/19/2025
Special inspection requirement — Lighting controls
05/19/2025
Special inspection requirement — Maintenance information
05/19/2025
Special inspection requirement — Air barrier - visual inspection
05/19/2025
Special inspection requirement — Air barrier — testing
05/19/2025
Special inspection requirement — Fenestration air leakage
05/19/2025
Special inspection requirement — Metering
05/19/2025
Special inspection requirement — Insulation placement and R values
Latest 60 of 68 events.
Nothing on file for this building.
1 project · most recent 08/25/2025
Steel Concrete Masonry
FiledStatusContractorScope
08/25/2025——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
08/25/2025Structural Steel - High Strength Bolting—special
08/25/2025Structural Steel - Welding—special
08/25/2025Masonry—special
08/25/2025Structural Cold-Formed Steel—special
08/25/2025Structural Steel - Details—special
08/25/2025Concrete - Cast-In-Place—special
07/10/2025Structural Stability – Alterations of existing buildings—special
07/01/2025Final—progress
05/19/2025Fire-Resistance Rated Construction—progress
05/19/2025Lighting in dwelling units—energy_progress
05/19/2025Protection of exposed foundation insulation—energy_progress
05/19/2025Electrical motors and elevators—energy_progress
05/19/2025Exterior lighting power—energy_progress
05/19/2025Vestibules—energy_progress
05/19/2025Interior lighting power—energy_progress
05/19/2025Lighting controls—energy_progress
05/19/2025Maintenance information—energy_progress
05/19/2025Air barrier - visual inspection—energy_progress
05/19/2025Air barrier — testing —energy_progress
05/19/2025Fenestration air leakage—energy_progress
05/19/2025Metering—energy_progress
05/19/2025Insulation placement and R values—energy_progress
05/19/2025Fenestration and door U-factor and product ratings—energy_progress
05/19/2025Fenestration areas—energy_progress
05/19/2025Structural Stability – Alterations of existing buildings—special
Latest 25 of 31.
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026B01227543-I1Request digital key ↗
08/21/2026B01227543-S3Request digital key ↗
08/21/2026B01227543-S2Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/17/2025340918671Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
06/17/2025340918671Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/21/2026B01227543-I1Open ↗
08/13/2026B01227543-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01227543-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01227543-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026B01227543-I1Open ↗
08/21/2026B01227543-S3Open ↗
08/21/2026B01227543-S2Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/17/2025340918671Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
06/17/2025340918671Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01227543-I1Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
06/17/2025340918671Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01227543-S2Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B01227543-S2Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
06/17/2025340918671Open ↗
▸BISADDITIONAL INFORMATION1
08/21/2025340918671Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
06/17/2025340918671Open ↗
▸Other Documents6
▸BISBPP - SUPPORTING DOCUMENTATION2
06/17/2025340918671Open ↗
06/17/2025340918671Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
06/17/2025340918671Open ↗
▸DOB NOWProperty Ownership Certification1
08/21/2026B01227543-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01227543-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01227543-I1Open ↗