DOB03/05/2021STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED AT EXPO #2, SECTION OF CONCRETE STUCCO HAS DETACHED ALONG WITH STEP CRACKING AT WINDOWS. AT INTERIOR DRYWALL DAMAGE ALONG WITH DEFECTS IN RUBBLE FOUNDATION DUE TO ONGOING EXCAVATION WORK AT 922 79TH STREET.
DOB11/20/2020V-DOB VIOLATION - ACTIVE
Two family brick · 2,000 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.