| Owner | Filings | Most Recent |
|---|---|---|
| GUMLEY HAFT | 77 | 09/15/2026 |
| MANHATTAN WIGWAM COMPANY | 3 | 07/08/2026 |
| ANVA | 1 | 03/22/2026 |
| 923 FIFTH AVENUE CONDOMINIIUMS | 63 | 03/22/2026 |
| SWISS BANK CORPORATION | 1 | 03/21/2026 |
| DUE ESTATES | 6 | 03/21/2026 |
| MANDELLA | 12 | 03/21/2026 |
| TAISHA | 9 | 03/21/2026 |
| 923 5TH AVENUE OWNERS C/O GUMLEY | 2 | 03/21/2026 |
| 923 5TH AVE CONDOMINIUM | 19 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ALWAYS FAST SERVICES CORP | 3 | 09/02/2026 |
| CTA ARCHITECTS | 2 | 08/28/2026 |
| NADAAA ARCHITECTURE D.P.C. | 6 | 08/26/2026 |
| J.L.RAMIREZ ARCHITECTS PC | 3 | 07/10/2026 |
| FORUM ENGINNERING, P.C. | 3 | 01/23/2026 |
| JENNY O'LEARY ARCHITECTURE, PLLC | 2 | 09/30/2025 |
| A&D ASSOCIATES, INC. | 3 | 03/18/2025 |
| MSM ENGINEERING SERVICES, PLLC | 5 | 02/15/2025 |
| CUONO ENGINEERING PLLC | 1 | 08/14/2024 |
| ASHRAF CORP | 2 | 08/09/2024 |
| DARIO PASQUARIELLO ARCHITECT | 3 | 08/01/2024 |
| BOHN ARCHITECTURE AND DESIGN | 1 | 04/12/2024 |
| BGM ENGINEERING | 1 | 02/07/2024 |
| BECHT ENGINEERING BT, INC. | 3 | 01/30/2024 |
| AM ARCHITECTURE PLLC | 2 | 08/22/2023 |
| SUK DESIGN GROUP LLP | 2 | 06/29/2023 |
| KAM CHIU CONSULTING ENGINEER, P.C. | 1 | 06/29/2023 |
| ARCHETYPE ARCHITECTURE | 4 | 01/26/2023 |
| AARON MCDONALD ARCHITECT | 2 | 07/14/2022 |
| LEE F. MINDEL ARCHITECT DPC | 1 | 04/09/2022 |
| JOHN B MURRAY ARCHITECT, LLC | 2 | 10/07/2021 |
| TRI-POWER ENGINEERING, LLC | 1 | 09/15/2021 |
| ENGINEERING PROFESSIONAL SERVICE P. | 2 | 07/10/2021 |
| EDWARD I. SCHACHNER LTD. | 1 | 02/26/2021 |
| A2 ARCHITECT, PC | 1 | 01/18/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| LLOYD NOEL BUILDING CONSULTANT | 3 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 10 | 03/21/2026 |
| J A EXPEDITING | 8 | 03/21/2026 |
| SYNCHRON EXPEDITING | 8 | 03/21/2026 |
| DVA Advisors | 3 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 3 | 03/21/2026 |
| J CALLAHAN CONSULTING | 8 | 03/21/2026 |
| NEXUS CONSULTING NYC, INC | 8 | 03/21/2026 |
| DJL ARCHITECT | 3 | 03/21/2026 |
| BERZAK SCHOEN CONSULTANTS LTD. | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| ANDAMIO SCAFFOLDING LLC | General Contractor | 14 | 08/04/2026 |
| D.D. INTERIORS INC | General Contractor | 10 | 07/08/2026 |
| RAKA PAINTING INC | General Contractor | 8 | 07/08/2026 |
| FEB GENERAL CONTRACTOR CO | General Contractor | 6 | 04/09/2026 |
| EVEREST SCAFFOLDING INC | General Contractor | 6 | 07/08/2026 |
| ADELPHI RESTORATION CORP | General Contractor | 5 | 07/15/2026 |
| SILVERLINING INTERIORS | General Contractor | 5 | 07/08/2026 |
| ANVA LLC | General Contractor | 4 | 07/08/2026 |
| THE RENOVATED HOME 1 LTD | General Contractor | 3 | 07/08/2026 |
| ASPECT PLBNG&HTNG CO LLC | Plumbing | 3 | 07/08/2026 |
| MONARCH PLUMB & HTG LLC | Plumbing | 2 | 07/08/2026 |
| 2MO LLC | General Contractor | 2 | 04/09/2026 |
| GALLERY RESTORATION LTD | General Contractor | 2 | 03/21/2026 |
| ILG MECH SERVICES, INC | Plumbing | 2 | 07/08/2026 |
| ABE HIMELFARB | Electrical | 2 | 03/21/2026 |
| SEGURA, CARLOS | Electrical | 1 | 03/21/2026 |
| HYDROKINETIC PLBG & HTG I | Plumbing | 1 | 07/08/2026 |
| HANJO CONTRACTORS INC | General Contractor | 1 | 07/08/2026 |
| HVAC EXPERTS, INC | General Contractor | 1 | 07/08/2026 |
| P & Z ELECTRIC CORP | Electrical | 1 | 03/22/2026 |
| DIVINCENZO, AGNELLO | Electrical | 1 | 03/21/2026 |
| ASANKOMAH, KOFI | Electrical | 1 | 03/21/2026 |
| TOUCHSTONE HOMES LLC | General Contractor | 1 | 04/09/2026 |
| AP PLUMBING & HVAC LLC | Plumbing | 1 | 07/08/2026 |
| ARK-POL PLUMBING CORP | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| METRIC CONSULTING AND INS | 1803 | 5 | 08/28/2026 |
| RYAN SPECIAL ENGINEERING | 2018 | 5 | 08/26/2026 |
| FORUM ENGINEERING, P. C. | 907 | 3 | 01/23/2026 |
| GEORGE J. XERAKIAS, PE | 1658 | 3 | 08/26/2025 |
| CROSSCHECK INSPECTION SER | 544 | 5 | 03/18/2025 |
| CATALPA SPECIAL INSPECTIO | 2004 | 6 | 08/14/2024 |
| DARIO ARCHITECTURE &DESIG | 6878 | 3 | 08/01/2024 |
| ALAN MARGOLIN & ASSOC | 423 | 1 | 04/12/2024 |
| ARCITECTURE PC | 8088 | 1 | 08/22/2023 |
| PROJECT TACTICAL SOLUTION | 5859 | 1 | 06/29/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Suspended Scaffold | Permit Issued | ADELPHI RESTORATION CORP | 08/05/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | ANDAMIO SCAFFOLDING LLC | 08/03/2026 |
| DOB NOW | Structural | Permit Issued | ADELPHI RESTORATION CORP | 07/14/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | ANDAMIO SCAFFOLDING LLC | 06/18/2026 |
| DOB NOW | General Construction | Permit Issued | ADELPHI RESTORATION CORP | 06/10/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | ANVA | 03/13/2026 |
| DOB NOW | General Construction | Permit Issued | ANVA | 03/13/2026 |
| DOB NOW | Plumbing | Signed-off | ASPECT PLBNG&HTNG CO LLC | 10/02/2025 |
| DOB NOW | Plumbing | Signed-off | IRA L GRAND | 08/28/2025 |
| DOB NOW | Supported Scaffold | Signed-off | ANDAMIO SCAFFOLDING LLC | 08/06/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | ANDAMIO SCAFFOLDING LLC | 08/06/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | ANDAMIO SCAFFOLDING LLC | 08/06/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | JRR CONTRACTING INC | 08/04/2025 |
| DOB NOW | Structural | Permit Issued | ADELPHI RESTORATION CORP | 07/08/2025 |
| DOB NOW | Plumbing | Signed-off | IRA L GRAND | 06/30/2025 |
| DOB NOW | Mechanical Systems | Signed-off | 2MO | 06/25/2025 |
| DOB NOW | General Construction | Signed-off | 2MO | 06/25/2025 |
| DOB NOW | General Construction | Permit Issued | ADELPHI RESTORATION CORP | 06/13/2025 |
| DOB NOW | Mechanical Systems | Signed-off | FEB GENERAL CONTRACTOR | 04/16/2025 |
| DOB NOW | Plumbing | Signed-off | MONARCH PLUMB & HTG LLC | 04/08/2025 |
| DOB NOW | Plumbing | Permit Issued | BLAZE PLUMBING & HEATING | 02/20/2025 |
| DOB NOW | General Construction | Permit Issued | ANVA | 02/20/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | ANVA | 02/20/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | FEB GENERAL CONTRACTOR | 02/11/2025 |
| DOB NOW | General Construction | Signed-off | D.D. INTERIORS INC | 01/08/2025 |
| DOB NOW | General Construction | Signed-off | D.D. INTERIORS INC | 10/21/2024 |
| DOB NOW | Mechanical Systems | Signed-off | RAKA PAINTING INC | 08/27/2024 |
| DOB NOW | Sidewalk Shed | Permit Issued | ANDAMIO SCAFFOLDING LLC | 08/12/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | ANDAMIO SCAFFOLDING LLC | 08/09/2024 |
| DOB NOW | Supported Scaffold | Signed-off | ANDAMIO SCAFFOLDING LLC | 08/09/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | JRR CONTRACTING INC | 07/30/2024 |
| DOB NOW | Mechanical Systems | Signed-off | FEB GENERAL CONTRACTOR | 05/15/2024 |
| DOB NOW | Mechanical Systems | Signed-off | HVAC EXPERTS, INC | 03/22/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | FEB GENERAL CONTRACTOR | 03/11/2024 |
| DOB NOW | Plumbing | Signed-off | MONARCH PLUMB & HTG LLC | 02/26/2024 |
| DOB NOW | General Construction | Signed-off | D.D. INTERIORS INC | 02/15/2024 |
| DOB NOW | General Construction | Signed-off | D.D. INTERIORS INC | 01/04/2024 |
| DOB NOW | Plumbing | Signed-off | ASPECT PLBNG&HTNG CO LLC | 10/12/2023 |
| DOB NOW | General Construction | Signed-off | RAKA PAINTING INC | 07/07/2023 |
| DOB NOW | General Construction | Signed-off | FEB GENERAL CONTRACTOR | 06/16/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/26/2026 | Signed-off | D.D. INTERIORS INC | Heating and Air Conditioning Systems | Heat / Cool National Comfort NPC4244000B-A1 24,000 BTU · Condensing Unit ×2 M3-Air VCU-C-030-1-S 28,200 BTU · Condensing Unit ×2 |
| 01/23/2026 | Signed-off | 2MO LLC | Air Conditioning Systems | Cooling Islandaire EZ15K216I2E10AB 14,500 BTU · Ptac ×8 |
| 03/18/2025 | Permit Issued | FEB GENERAL CONTRACTOR CO | Heating and Air Conditioning Systems | Heat / Cool Islandaire EZ12A1RM3E/F15 15,300 BTU · Ptac ×6 EZ15A2RM3E/F15 15,000 BTU · Ptac ×2 EZ09A5RME3/F15 15,300 BTU · Ptac ×1 |
| 06/29/2023 | Permit Issued | ANVA LLC | Heating and Air Conditioning Systems | Heat / Cool |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/26/2026 | Signed-off | MONARCH PLUMB & HTG LLC | Gas, Water/Sanitary |
| 07/10/2026 | — | — | Water/Sanitary |
| 01/23/2026 | Signed-off | ILG MECH SERVICES, INC | Gas, Water/Sanitary |
| 03/18/2025 | — | — | Water/Sanitary |
| 01/18/2021 | Permit Issued | GREGG NY PLUMBING, INC | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/29/2025 | Complete | ETECH ELECTRICAL LLC | General Wiring |
| 11/12/2025 | Complete | THOMAS NOTO | General Wiring |
| 08/20/2025 | Complete | E & M ELECTRICAL NY CORP | General Wiring |
| 07/25/2025 | Complete | E & M ELECTRICAL NY CORP | General Wiring |
| 06/27/2025 | Complete | KET ELECTRIC LLC | General Wiring |
| 02/20/2025 | Complete | GLENDALE ELECTL CONTNG IN | General Wiring |
| 08/23/2024 | Permit Issued | BOROWIDE ELECT'L CONTR'S | — |
| 04/02/2024 | Complete | AMSTERDAM ELECTRIC CORP | General Wiring |
| 08/28/2023 | Complete | ACCURATE ELEC'L CORP. | General Wiring |
| 10/31/2022 | Complete | APOLLO ELECTRIC INC. | General Wiring |
| 09/27/2022 | Complete | DEMAND ELECTRIC INC | General Wiring |
| 07/27/2022 | Complete | AMSTERDAM ELECTRIC CORP | General Wiring |
| 04/06/2022 | Complete | E & M ELECTRICAL NY CORP | General Wiring |
| 07/09/2021 | Complete | ERIC & NG ELEC'L, INC. | General Wiring |
| 03/18/2021 | Complete | GLENDALE ELECTL CONTNG IN | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/28/2026 | Permit Issued | ADELPHI RESTORATION CORP | Steel |
| 03/18/2025 | Permit Issued | FEB GENERAL CONTRACTOR CO | Steel, Masonry |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/02/2026 | Permit Issued | ANDAMIO SCAFFOLDING LLC | Scaffold |
| 02/15/2025 | Permit Issued | ANDAMIO SCAFFOLDING LLC | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/26/2025 | Permit Issued | ADELPHI RESTORATION CORP | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 04/21/2026 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 04/20/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/10/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/27/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/14/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/06/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/30/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/25/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 09/22/2025 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 09/08/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/18/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/15/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/28/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/05/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 04/29/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 04/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/07/2025 | No Access-Final PL - Up to 3 Requested Floors | No Access | View ↗ |
| 11/19/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/01/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/30/2024 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 04/17/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/23/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/17/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/16/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/11/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/23/2026 | Final | Christa Waring | progress |
| 07/23/2026 | Masonry | SAMI HAJJAR P.E | special |
| 07/23/2026 | Structural Stability – Alterations of existing buildings | SAMI HAJJAR P.E | special |
| 07/23/2026 | Tenant Protection Plan Compliance | — | special |
| 07/17/2026 | Post-installed Anchors | William Ryan | special |
| 07/17/2026 | Final | ARTHUR CHANG | progress |
| 07/17/2026 | Mechanical Systems | William Ryan | special |
| 04/10/2026 | Fire-Resistant Penetrations and Joints | William Ryan | special |
| 03/25/2026 | Fire-Resistant Penetrations and Joints | William Ryan | special |
| 02/11/2026 | Fire-Resistant Penetrations and Joints | Alexander Rodsen | special |
| 02/11/2026 | Final | Alexander Rodsen | progress |
| 02/11/2026 | Mechanical Systems | Alexander Rodsen | special |
| 01/23/2026 | Final | Alexander Rodsen | progress |
| 01/23/2026 | Mechanical Systems | Alexander Rodsen | special |
| 01/23/2026 | Fire-Resistant Penetrations and Joints | Alexander Rodsen | special |
| 10/22/2025 | Fire-Resistant Penetrations and Joints | SAMI HAJJAR P.E | special |
| 10/22/2025 | Final | SAMI HAJJAR P.E | progress |
| 10/22/2025 | Fire-Resistance Rated Construction | SAMI HAJJAR P.E | progress |
| 09/18/2025 | Final | SAMI HAJJAR P.E | progress |
| 09/18/2025 | Fire-Resistant Penetrations and Joints | SAMI HAJJAR P.E | special |
| 09/18/2025 | Fire-Resistance Rated Construction | SAMI HAJJAR P.E | progress |
| 08/29/2025 | Alternative Materials - OTCR Buildings Bulletin Number | George Xerakias | special |
| 08/29/2025 | Post-installed Anchors | George Xerakias | special |
| 02/03/2025 | Fire-Resistant Penetrations and Joints | Alexander Rodsen | special |
| 01/02/2025 | Post-installed Anchors | George Xerakias | special |