← Back
BuildNYC
Elevator apt, semi-fireproof with stores
924 AMSTERDAM AVENUE
MANHATTAN · BIN 1056614
💬 Discuss this project
1925Year Built
6Stories
D7Building Class
R8AZoning
35,290 sfGross Floor Area
32Units
LL97 CoveredRent Stabilized3 Active Violations 2 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator apt, semi-fireproof with stores · Owner of record: JO & WO Realty · 7,592 sf lot · 4.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofVerizon3p · 2 filings · 7 docs
Floor 6Verizon1p · 1 filing · 3 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 11p · 1 filing · 2 docs
Site & exteriorVerizon19p · 4 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JO & WO Realty3307/08/2026
Tang 920 Amsterdam603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FL&M Engineering Design & Inspection306/28/2023
The MTM Design Group212/01/2022
Maz Design106/22/2022
Just Consulting Engineering106/26/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services303/21/2026
WM Arch203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tri Borough ScaffoldingScaffold1203/21/2026
E & M Electrical NYElectrical403/21/2026
MC SuperstructureScaffold403/21/2026
High Quality ConstructionScaffold203/21/2026
Alef Electrical ContractingElectrical103/21/2026
J.A. Lee Electricspecialty_contractor107/08/2026
TristruxGeneral Contractor107/08/2026
Hanif ConstructionGeneral Contractor107/08/2026
Istra Electrical ContractorsElectrical103/21/2026
Nash Electric ServicesElectrical103/22/2026
Nivek Electrical ContractingElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
The MTM Design Group1319212/01/2022
Building Lifecycle
All (99)Filed (7)Permit Issued (10)Signed Off (6)Facade (FISP) (3)Violation (60)Objection (12)Special Inspection (1)
08/13/2026
Violation issued (ECB, open)
Elevators
11/17/2025
Violation issued (HPD, closed)
I
03/11/2025
Violation issued (ECB, closed)
Elevators
02/27/2025
Signed off — Alteration
REPAIR / REPOINTING OF BRICK CRACK , STONE CRACK , SPALLED BRICK , MISSING BRICK , STEP CRACK . LINTEL REPAIR ALL AROUND THE BUILDING AS PER PLAN
M00757754-I1
01/08/2025
Cycle 9 facade report signed — SAFE
12/31/2024
Cycle 9 facade report submitted
12/31/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/20/2024
Cycle 9 facade inspection completed
11/06/2024
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00857267-I1
11/04/2024
Permit issued — Supported Scaffold
M00857267-I1-SF
04/11/2024
Violation issued (ECB, closed)
Local Law
03/26/2024
Permit issued — Sidewalk Shed
M00857267-I1-SH
11/15/2023
Violation issued (HPD, closed)
I
08/28/2023
Violation issued (ECB, closed)
Elevators
08/14/2023
Violation issued (ECB, closed)
Construction
07/24/2023
Signed off — Alteration
Verizon - Replace 9 antennas and 6 RRH units and remove 3 existing RRH units on the roof. All in conformance with TPPN 5/98. No change in use, egress, or occupancy.
M00525665-I1
07/24/2023
Signed off — Alteration
M08046572-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/2023
Filed — Alteration
M08053866-P1
06/28/2023
Signed off — Alteration
M08053866-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/17/2023
Permit issued — Supported Scaffold
M00857267-I1-SF
04/17/2023
Permit issued — Sidewalk Shed
M00857267-I1-SH
04/16/2023
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00857267-I1
03/15/2023
Violation issued (HPD, closed)
A
02/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/28/2022
Permit issued — General Construction
M08046572-I1-GC
12/14/2022
Filed — Alteration
M08053866-I1
12/14/2022
Permit issued — Sidewalk Shed
M08053866-I1-SF
12/14/2022
Permit issued — Sidewalk Shed
M08053866-I1-SH
12/01/2022
Filed — Alteration
M08046572-I1
11/10/2022
Violation issued (ECB, closed)
Local Law
11/02/2022
Violation issued (HPD, closed)
I
10/17/2022
Violation issued (ECB, open)
Elevators
07/08/2022
Permit issued — General Construction
M00757754-I1-GC
06/22/2022
Filed — Alteration
REPAIR / REPOINTING OF BRICK CRACK , STONE CRACK , SPALLED BRICK , MISSING BRICK , STEP CRACK . LINTEL REPAIR ALL AROUND THE BUILDING AS PER PLAN
M00757754-I1
06/21/2022
Special inspection requirement — Final
MD SHAHJADA
02/15/2022
Violation issued (HPD, closed)
A
10/15/2021
Violation issued (ECB, closed)
Local Law
09/30/2021
Permit issued — Antenna
M00525665-I1-AN
07/15/2021
Objection raised — 2014-AN AC 28-104.7.1-Administ
07/15/2021
Objection resolved — Addressed
07/15/2021
Objection raised — 2014-AN AC 28-104.7-Building C
07/15/2021
Objection resolved — Addressed
07/15/2021
Objection raised — 2014-AN AC 28-104.11-Building
07/15/2021
Objection resolved — Addressed
07/15/2021
Objection raised — 2014-AN AC 28-104.11-Building
07/15/2021
Objection resolved — Addressed
07/15/2021
Objection raised — 2014-AN AC 28-104.7.1-Administ
07/15/2021
Objection resolved — Addressed
07/15/2021
Objection raised — 2014-AN AC 28-104.7-Building C
07/15/2021
Objection resolved — Addressed
07/14/2021
Filed — Alteration
Verizon - Replace 9 antennas and 6 RRH units and remove 3 existing RRH units on the roof. All in conformance with TPPN 5/98. No change in use, egress, or occupancy.
M00525665-I1
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/01/2021
Violation issued (HPD, closed)
A
08/24/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/24/2019
Violation issued (HPD, open)
C
08/24/2019
Violation issued (HPD, closed)
A
08/24/2019
Violation issued (HPD, closed)
A
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offMC Superstructure11/04/2024
DOB NOWSidewalk ShedSigned-offMC Superstructure03/26/2024
DOB NOWSupported ScaffoldSigned-offTri Borough Scaffolding04/17/2023
DOB NOWSidewalk ShedSigned-offTri Borough Scaffolding04/17/2023
DOB NOWGeneral ConstructionSigned-offTristrux12/28/2022
DOB NOWSidewalk ShedSigned-offTri Borough Scaffolding12/14/2022
DOB NOWSidewalk ShedSigned-offTri Borough Scaffolding12/14/2022
DOB NOWGeneral ConstructionSigned-offHanif Construction07/08/2022
DOB NOWAntennaSigned-offMic General Contracting09/30/2021
DOB NOWConstruction FenceSigned-offHigh Quality Construction07/23/2018
BISPLISSUEDAura Plumbing11/17/2025
BISFPISSUEDPinnacle Plumbing & Heating09/18/2018
BISPLISSUEDTop Plumbing Group07/24/2018
BISOTISSUEDHigh Quality Construction07/24/2018
BISOTISSUEDExact RF Broadcast & Wire08/04/2016
BISPLISSUEDAqua Blue Plumbing Svces02/03/2015
BISOTISSUEDSquan Construction Services04/07/2014
BISOTISSUEDHerrera Contracting10/15/2013
BISOTISSUEDHerrera Contracting03/11/2013
BISFPISSUEDMaster Fire Systems11/14/2012
BISMHISSUEDBCS Construction Services11/02/2012
BISPLISSUEDVarsity Plumbing & Heating09/13/2006
BISOTISSUEDCostrotta Construction Management09/06/2006
BISMHISSUEDCostrotta Construction Management08/09/2006
BISOTISSUEDCostrotta Construction Management08/09/2006
5 projects · most recent 12/25/2025
General Wiring
FiledStatusContractorScope
12/25/2025CompleteE & M Electrical NY1 meters, 1 new_meters
05/23/2024CompleteE & M Electrical NYGeneral Wiring
12/06/2022CompleteNash Electric Services—
09/25/2018CompleteKwong Ming Electric34 meters, 1 new_meters
08/16/2018CompleteKwong Ming ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
06/21/2022FinalMD SHAHJADAprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
VerizonTelecom siteRoof
Project M08046572 Alteration · LOC Issued · 12/01/2022
Project M00525665 Alteration · LOC Issued · 07/14/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 164 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/06/2026M00046739-I1Request digital key ↗
09/02/2026M00757754-I1Request digital key ↗
09/01/2026M08046572-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits36
▸BISPLAN / WORK APPROVAL APPLICATION23
11/10/2025104489368Open ↗
04/07/2025104489368Open ↗
03/19/2025104489368Open ↗
Showing 3 of 23 on file for this type
▸BISWORK PERMIT APPLICATION13
11/17/2025104489368Open ↗
02/27/2025104489368Open ↗
09/18/2018123465311Open ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications29
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
03/27/2019123579920Open ↗
06/25/2018123579920Open ↗
03/31/2016122679896Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
03/25/2019123579920Open ↗
03/19/2019123579920Open ↗
11/15/2018123465311Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/06/2026M00046739-I1Open ↗
09/02/2026M00757754-I1Open ↗
09/01/2026M08046572-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/15/2018123465311Open ↗
06/22/2018123579920Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
03/11/2013121511051Open ↗
11/14/2012121496693Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026M00757754-I1Open ↗
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
11/26/2018123579920Open ↗
11/01/2018123579920Open ↗
09/11/2018123579920Open ↗
Showing 3 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
08/03/2016122679896Open ↗
03/25/2014121496693Open ↗
03/13/2014121496693Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
04/22/2015121511051Open ↗
04/15/2015121511051Open ↗
▸BISEQUIPMENT USE PERMITS1
03/26/2019123579920Open ↗
▸BISSCHEDULE B - PLUMBING1
03/11/2013121511051Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
03/26/2019123579920Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
11/15/2018123465311Open ↗
06/25/2018123579920Open ↗
08/03/2016122679896Open ↗
▸Environmental & Asbestos10
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
06/25/2018123579920Open ↗
03/31/2016122679896Open ↗
03/11/2013121511051Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/02/2026M00757754-I1Open ↗
08/13/2026M00525665-I1Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
10/26/2012121418199Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
03/17/2014121842550Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/01/2026M08046572-I1Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
03/27/2019123579920Open ↗
06/25/2018123579920Open ↗
03/31/2016122679896Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
09/14/2020122679896Open ↗
03/27/2019123579920Open ↗
12/17/2014121842550Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/14/2020122679896Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00525665-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/12/2025104489368Open ↗
09/15/2020122679896Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
03/27/2019123579920Open ↗
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
09/15/2020122679896Open ↗
09/14/2020122679896Open ↗
05/03/2019123465311Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
03/11/2013121511051Open ↗
11/14/2012121496693Open ↗
▸BISSUPERSEDING LETTER1
11/17/2025104489368Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT13
09/14/2020122679896Open ↗
05/03/2019123465311Open ↗
03/27/2019123579920Open ↗
Showing 3 of 13 on file for this type
▸Filing & Intake Forms25
▸BISBOROUGH INTAKE FORM11
11/17/2025104489368Open ↗
05/03/2019123465311Open ↗
05/01/2019123465311Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION8
11/13/2025104489368Open ↗
11/13/2025104489368Open ↗
11/13/2025104489368Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET6
11/15/2018123465311Open ↗
06/22/2018123579920Open ↗
03/31/2016122679896Open ↗
Showing 3 of 6 on file for this type
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
05/03/2019123465311Open ↗
11/15/2018123465311Open ↗
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
01/23/2019123465311Open ↗