5 Open Violations 1 unresolved · 4 paperwork only▸
DOB05/09/2001V-DOB VIOLATION - ACTIVE
ECB08/20/2008FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: OBSERVED VERTICAL CRACK APPROX 3/6" FROM THE TOP TO BOTTOM OF PLASTER. ON EXTERIORWALL. ALSO NOTED PLASTER LOOSE AT TOP OF BLDG. REMEDY: MAINTAINNothing owed — awaiting certificate of correction
ECB04/15/2008FAILURE TO MAINTAIN EXTERIOR BLDG WALL. DEFECT NOTED: AT FACE BLOCK EXTERIOR WALL FROM JOINT TO COPING MASONRY STONE TO FINISHED GRADE HAS CRACK APPROX 27' LONG.Nothing owed — awaiting certificate of correction
ECB11/26/2007FAILURE TO MAINTAIN EXTERIOR BLDG WALL DEFECTS NOTED: STRUCTURAL DEFECT AT FACE BLOCK EXTERIOR WALL FROM JOINT TO COPING MASONRY STONE TO FINISHED GRADE AT APPROX. 28'-0" LONG WITH 1 FACE BLOCK DISLODGED FROMNothing owed — awaiting certificate of correction
ECB05/09/2001FAILURE TO HAVE CERTIFICATE OF OCCUPANCY POSTED OR AVAILABLE FOR INSPECTION AT TIME OF INSPECTION.REMEDY:HAVE C/O AVAILABLE FOR INSPECTION AT ALL REASONABLE TIMES.Nothing owed — awaiting certificate of correction
Auto body / collision or auto repair · 0.72 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.