← Back
Two family brick
926 BAY RIDGE PARKWAY
BROOKLYN · BIN 3148938
💬 Discuss this project
1899Year Built
2Stories
B1Building Class
R5BZoning
3,540 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Two family brick · 2,000 sf lot · 1.77 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 11p · 1 filing · 20 docs
Cellar3p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREGORY V. PEROTTO, P.E.409/01/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEWSAN CONSULTING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L.J.S. PIPING AND HEATINGPlumbing607/08/2026
MARIO CASTROElectrical303/21/2026
POWER SURGE ELECTRIC INC 004009General Contractor203/22/2026
AIRITAN MANAGEMENT CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREGORY V. PEROTTO, P.E.947309/01/2020
Building Lifecycle
All (24)Filed (4)Permit Issued (3)Signed Off (3)Violation (10)Special Inspection (4)
08/19/2022
Signed off — Alteration
Plumbing work at the cellar: relocate gas dryer, tub to remain for 3-fixture bathroom, and clothes washer and laundry sink to remain.
B00222372-S1
08/19/2022
Signed off — Alteration
Plumbing work at the cellar: relocate gas dryer, tub to remain for 3-fixture bathroom, and clothes washer and laundry sink to remain.
B00222372-I1
04/13/2021
Signed off — Alteration
B00199416-I1
11/06/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
11/06/2020
Special inspection requirement — Energy Code Compliance Inspections
Gregory Perotto
09/01/2020
Filed — Alteration
Plumbing work at the cellar: relocate gas dryer, tub to remain for 3-fixture bathroom, and clothes washer and laundry sink to remain.
B00222372-P1
08/12/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
08/12/2020
Special inspection requirement — Energy Code Compliance Inspections
Gregory Perotto
06/08/2020
Permit issued — Plumbing
B00222372-S1-PL
03/12/2020
Filed — Alteration
Plumbing work at the cellar: relocate gas dryer, tub to remain for 3-fixture bathroom, and clothes washer and laundry sink to remain.
B00222372-S1
01/16/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/16/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/27/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/2019
Violation issued (ECB, closed)
Construction
10/11/2019
Permit issued — Mechanical Systems
B00199416-I1-MS
10/09/2019
Permit issued — Plumbing
B00222372-I1-PL
10/02/2019
Filed — Alteration
Plumbing work at the cellar: relocate gas dryer, tub to remain for 3-fixture bathroom, and clothes washer and laundry sink to remain.
B00222372-I1
10/02/2019
Filed — Alteration
B00199416-I1
09/04/2019
Violation issued (ECB, closed)
Unknown
09/04/2019
Violation issued (ECB, closed)
Construction
01/12/2018
Violation issued (FDNY_NOV, closed)
01/12/2018
Violation issued (ECB, closed)
Construction
01/12/2018
Violation issued (ECB, closed)
Construction
01/12/2018
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offL.J.S. PIPING AND HEATING06/08/2020
DOB NOWMechanical SystemsSigned-offAIRITAN MANAGEMENT CORP10/11/2019
DOB NOWPlumbingSigned-offL.J.S. PIPING AND HEATING10/09/2019
BISOTISSUEDTUMEN, INC02/14/2020
BISOTISSUEDAIRITAN MANAGEMENT CORP09/23/2019
BISOTISSUEDSEA BRIGHT SOLAR LLC04/08/2016
1 project · most recent 01/07/2021
General Wiring
FiledStatusContractorScope
01/07/2021Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
11/06/2020Fire-Resistant Penetrations and JointsGregory Perottospecial
11/06/2020Energy Code Compliance InspectionsGregory Perottoprogress
08/12/2020Fire-Resistant Penetrations and JointsGregory Perottospecial
08/12/2020Energy Code Compliance InspectionsGregory Perottoprogress
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00222372-S1Request digital key ↗
08/15/2026B00222372-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing Legalization1
09/02/2026B00222372-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00199416-I1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION4
01/13/2020321993642Open ↗
09/25/2019321993642Open ↗
09/29/2016340355877Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
02/18/2020321993642Open ↗
09/25/2019321993642Open ↗
04/08/2016340355877Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
01/13/2020321993642Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026B00222372-S1Open ↗
08/13/2026B00222372-P1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026B00199416-I1Open ↗
08/13/2026B00222372-P1Open ↗
08/13/2026B00222372-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/31/2019321993642Open ↗
09/25/2019321993642Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026B00222372-P1Open ↗
08/23/2026B00222372-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B00222372-P1Open ↗
08/23/2026B00222372-S1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/31/2016340355877Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/25/2019321993642Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/25/2019321993642Open ↗
▸Safety & Tenant Protection7
▸DOB NOWTenant Protection Plan4
08/13/2026B00222372-P1Open ↗
08/13/2026B00222372-S1Open ↗
08/13/2026B00222372-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes2
09/25/2019321993642Open ↗
03/31/2016340355877Open ↗
▸BISSTREET TREE CHECKLIST1
09/25/2019321993642Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026B00222372-I1Open ↗
08/13/2026B00199416-I1Open ↗
08/13/2026B00222372-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/25/2019321993642Open ↗
03/31/2016340355877Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
04/09/2021321993642Open ↗
12/15/2016340355877Open ↗
03/31/2016340355877Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
12/15/2016340355877Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/09/2021321993642Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/31/2019321993642Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/15/2016340355877Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
03/31/2016340355877Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
04/09/2021321993642Open ↗
12/15/2016340355877Open ↗
03/31/2016340355877Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/15/2021321993642Open ↗
12/15/2016340355877Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
12/15/2016340355877Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/15/2016340355877Open ↗
▸BISSUPERSEDING LETTER1
02/18/2020321993642Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
09/25/2019321993642Open ↗
12/15/2016340355877Open ↗
03/31/2016340355877Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
04/09/2021321993642Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
01/15/2020321993642Open ↗
09/12/2016340355877Open ↗
03/31/2016340355877Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/31/2016340355877Open ↗
▸BISEFILING COVER SHEET1
09/24/2019321993642Open ↗