← Back
Miscellaneous hospital / health care facility
926 BEDFORD AVENUE
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3396746
💬 Discuss this project
2009Year Built
5Stories
I9Building Class
R7AZoning
25,707 sfGross Floor Area
1Units
LL97 Covered5 Open Violations ▸FDNY Report ↗
Miscellaneous hospital / health care facility · Owner of record: 926 BEDFORD AVE LLC · 5,714 sf lot · 4.5 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof16p · 1 filing · 14 docs
Floor 517p · 1 filing · 14 docs
Floor 417p · 1 filing · 14 docs
Floor 318p · 1 filing · 14 docs
Floor 218p · 1 filing · 14 docs
Floor 117p · 1 filing · 14 docs
Mezzanine3p · 1 filing · 2 docs
Cellar19p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
926 BEDFORD AVE2703/22/2026
NY MAJOR CONSTRUCTION103/22/2026
VRP CONSULTING403/22/2026
926 BEDFORD AVE ASSC LLC103/22/2026
VRP CONSTRUCTING INC103/22/2026
PRESCO INDUSTR. INC103/22/2026
PRESCO INDUSTRIES203/22/2026
926 BEDFORD ASSOCIATE203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/27/2017$9.3M—926 BEDFORD LLC → 926 BEDFORD AVE LLC$362/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STUDIO GALLOS310/14/2021
JOSELOW AND ASSOCIATES210/07/2021
JEFFREY SANDOR ORLING ARCHITECT107/22/2021
SHARON ENGINEERING, P.C101/23/2020
PATUXENT ENGINEERING LLC101/15/2019
KZ ENGINEERING, P.C103/22/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES603/21/2026
PATUXENT ENGINEERING203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SILVERCUP SCFFLDNG I LLCGeneral Contractor707/08/2026
NEW YORK CERTIFIED INTERGeneral Contractor507/08/2026
TRUE POWER ELECL CONT LLCElectrical303/22/2026
ABRAHAM RUTNERElectrical203/21/2026
P.H. WORKS INCPlumbing207/08/2026
FRANCISCO NUNEZElectrical103/21/2026
TRUE POWER ELECL CONT LLC 004599General Contractor103/22/2026
P H WORKSGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA9168610/14/2021
Building Lifecycle
All (128)Filed (9)Permit Issued (10)Signed Off (6)Violation (60)Inspection (8)Objection (24)Special Inspection (11)
04/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/21/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/14/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/05/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/27/2021
Special inspection requirement — Lighting controls
Soorjbally Harilall
10/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
10/27/2021
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
10/27/2021
Special inspection requirement — Exterior lighting power
Soorjbally Harilall
10/27/2021
Special inspection requirement — Interior lighting power
Soorjbally Harilall
10/14/2021
Filed — Alteration CO
Proposed interior renovation to cellar and first floor resulting in change of use, egress and occupancy
B00521727-P1
10/13/2021
Signed off — Alteration
Plumbing work type hereby filed for cellar work in conjunction with GC application B00500247-I1.
B00500247-S1
10/07/2021
Filed — Alteration
Plumbing work type hereby filed for cellar work in conjunction with GC application B00500247-I1.
B00500247-P1
09/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
09/14/2021
Signed off — Alteration
Plumbing work type hereby filed for cellar work in conjunction with GC application B00500247-I1.
B00500247-I1
09/03/2021
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/30/2021
Signed off — Alteration
Installation of a temporary construction fence filed in conjunction with NB job number: 321498410
B00563398-I1
08/09/2021
Permit issued — General Construction
B00521727-I1-GC
08/03/2021
Permit issued — Construction Fence
B00563398-I1-FN
07/23/2021
Objection raised — Structural
07/23/2021
Objection resolved — Addressed
07/22/2021
Filed — Alteration
Installation of a temporary construction fence filed in conjunction with NB job number: 321498410
B00563398-I1
07/22/2021
Special inspection requirement — Final
JEFFERY ORLING
07/20/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/29/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/24/2021
Objection raised — Other
06/24/2021
Objection resolved — Addressed
06/24/2021
Objection raised — Other
06/24/2021
Objection resolved — Addressed
06/24/2021
Objection raised — Other
06/24/2021
Objection resolved — Addressed
06/24/2021
Objection raised — Other
06/24/2021
Objection resolved — Addressed
06/24/2021
Objection raised — Other
06/24/2021
Objection resolved — Addressed
06/02/2021
Objection raised — Other
06/02/2021
Objection resolved — Addressed
06/02/2021
Objection raised — Other
06/02/2021
Objection resolved — Addressed
06/02/2021
Objection raised — Other
06/02/2021
Objection resolved — Addressed
06/02/2021
Objection raised — Other
06/02/2021
Objection resolved — Addressed
05/25/2021
Objection raised — Other
05/25/2021
Objection resolved — Addressed
05/25/2021
Objection raised — Other
05/25/2021
Objection resolved — Addressed
05/20/2021
Filed — Alteration CO
Proposed interior renovation to cellar and first floor resulting in change of use, egress and occupancy
B00521727-I1
05/04/2021
Permit issued — General Construction
B00500247-I1-GC
05/03/2021
Permit issued — Plumbing
B00500247-S1-PL
04/28/2021
Filed — Alteration
Plumbing work type hereby filed for cellar work in conjunction with GC application B00500247-I1.
B00500247-S1
04/13/2021
Filed — Alteration
Plumbing work type hereby filed for cellar work in conjunction with GC application B00500247-I1.
B00500247-I1
Latest 60 of 128 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNEW YORK CERTIFIED INTER08/09/2021
DOB NOWConstruction FenceSigned-offNEW YORK CERTIFIED INTER08/03/2021
DOB NOWGeneral ConstructionSigned-offNEW YORK CERTIFIED INTER05/04/2021
DOB NOWPlumbingSigned-offP.H. WORKS INC05/03/2021
DOB NOWSupported ScaffoldSigned-offSILVERCUP SCFFLDNG I LLC09/14/2020
DOB NOWBoiler EquipmentPermit IssuedP.H. WORKS INC01/30/2020
DOB NOWSupported ScaffoldSigned-offSILVERCUP SCFFLDNG I LLC03/28/2019
DOB NOWSupported ScaffoldSigned-offSILVERCUP SCFFLDNG I LLC01/15/2019
DOB NOWSupported ScaffoldSigned-offSILVERCUP SCFFLDNG I LLC08/02/2018
DOB NOWSupported ScaffoldSigned-offSILVERCUP SCFFLDNG I LLC03/22/2018
BISPLISSUEDP.H. WORKS INC11/23/2020
BIS—ISSUEDNEW YORK MAJOR CONSTRUCTI01/09/2020
BISPLISSUEDP.H. WORKS INC11/23/2019
BIS—ISSUEDNEW YORK MAJOR CONSTRUCTI12/31/2018
BISPLISSUEDP.H. WORKS INC11/14/2018
BISEQISSUEDSILVERCUP SCFFLDNG I LLC07/23/2018
BISEQISSUEDSILVERCUP SCFFLDNG I LLC06/13/2018
BIS—ISSUEDNEW YORK MAJOR CONSTRUCTI01/10/2018
BISEQISSUEDSILVERCUP SCFFLDNG I LLC07/18/2017
BIS—ISSUEDNEW YORK MAJOR CONSTRUCTI06/29/2017
BIS—ISSUEDNEW YORK MAJOR CONSTRUCTI06/29/2017
BISEQISSUEDNEW YORK MAJOR CONSTRUCTI06/28/2017
BISPLISSUEDAAA PLUMBING & HTNG LLC05/21/2010
BISSPISSUEDWALTER J. GRANDE P&H INC.06/23/2009
BISEQISSUEDV.R.P. CONSULTING INC05/20/2009
BIS—ISSUEDV.R.P. CONSULTING INC05/20/2009
BISPLISSUEDAAA PLUMBING & HTNG LLC04/21/2009
BISMHISSUEDVRP CONSULTING, INC04/01/2009
BISEQISSUEDA-1 PREMIER SCAFFOLDING11/07/2008
BIS—ISSUEDVRP CONSULTING INC.09/10/2008
BIS—ISSUEDVRP CONSULTING INC.05/23/2008
BISEQISSUEDVRP CONSULTING INC05/23/2008
BISEQISSUEDVRP CONSULTING INC12/07/2007
BIS—ISSUEDVRP CONSULTING INC.08/20/2007
BIS—ISSUEDVRP CONSULTING INC.08/17/2007
BISOTISSUEDCLO INC01/16/2007
BIS—ISSUEDCLO INC01/16/2007
BISEQISSUEDCLO INC01/16/2007
BISEQISSUEDCLO INC01/16/2007
BISEQISSUEDCLO INC12/27/2006
+ 4 more permits on file
4 projects · most recent 06/24/2022
General Wiring
FiledStatusContractorScope
06/24/2022CompleteTRUE POWER ELECL CONT LLCGeneral Wiring
09/20/2021CompleteTRUE POWER ELECL CONT LLCGeneral Wiring
11/27/2020CompleteTRUE POWER ELECL CONT LLCGeneral Wiring
12/06/2018CompleteCONTACT PLUS ELEC'L CORP—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/21/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/14/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/03/2021Pass-Final CND-Occupancy InspectionPassView ↗
07/20/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/29/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
10/27/2021Lighting controlsSoorjbally Harilallenergy_progress
10/27/2021Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
10/27/2021Energy Code Compliance InspectionsSoorjbally Harilallprogress
10/27/2021Exterior lighting powerSoorjbally Harilallenergy_progress
10/27/2021Interior lighting powerSoorjbally Harilallenergy_progress
09/20/2021Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
07/22/2021FinalJEFFERY ORLINGprogress
04/13/2021Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
04/08/2021Energy Code Compliance InspectionsSoorjbally Harilallprogress
04/08/2021Lighting controlsSoorjbally Harilallenergy_progress
04/08/2021Interior lighting powerSoorjbally Harilallenergy_progress
▾Documents — 275 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch7
09/03/2026B00022961-I1Request digital key ↗
09/01/2026B00500247-I1Request digital key ↗
09/01/2026B00500247-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/02/2026B00300234-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00117939-I1Request digital key ↗
▸Applications & Permits48
▸BISPLAN / WORK APPROVAL APPLICATION22
02/10/2021321498410Open ↗
12/17/2020321498410Open ↗
12/10/2020321498410Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION16
03/06/2019321498410Open ↗
11/16/2018321498410Open ↗
07/19/2018340619520Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION8
01/23/2020321498410Open ↗
12/04/2019321498410Open ↗
09/24/2019321498410Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/13/2020321498410Open ↗
▸Zoning, Tax Lot & Property Records12
▸BISZONING DIAGRAM4
08/14/2018321498410Open ↗
05/14/2018321498410Open ↗
11/27/2017321498410Open ↗
Showing 3 of 4 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
05/19/2017321498410Open ↗
05/19/2017321498410Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00521727-I1Open ↗
08/13/2026B00521727-P1Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/10/2017321498410Open ↗
▸BISVERIFY TAX LOT1
02/01/2021321498410Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/10/2020321498410Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00521727-I1Open ↗
▸Seals & Professional Certifications49
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
05/13/2020321498410Open ↗
05/13/2020321498410Open ↗
03/17/2020340619520Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/03/2026B00022961-I1Open ↗
09/02/2026B00117939-I1Open ↗
09/01/2026B00500247-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/29/2026B00521727-I1Open ↗
08/29/2026B00521727-I1Open ↗
08/25/2026B00500247-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026B00521727-I1Open ↗
08/25/2026B00500247-I1Open ↗
08/24/2026B00500247-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/19/2018340619520Open ↗
07/14/2017340523623Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/19/2018340619520Open ↗
07/14/2017340523623Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/19/2018340619520Open ↗
07/14/2017340523623Open ↗
▸Trade Schedules & Equipment35
▸BISEQUIPMENT USE PERMITS10
06/10/2021321498410Open ↗
06/10/2021321498410Open ↗
06/10/2021321498410Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING8
12/10/2020321498410Open ↗
12/04/2020321498410Open ↗
05/13/2020321498410Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
06/10/2021321498410Open ↗
06/10/2021321498410Open ↗
02/19/2021321498410Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
12/29/2010310303196Open ↗
10/07/2010310303196Open ↗
09/14/2010310303196Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B2
12/29/2010310303196Open ↗
12/29/2010310303196Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/17/2017321498410Open ↗
03/28/2017321498410Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
12/01/2020321498410Open ↗
12/29/2020321585655Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/10/2020321498410Open ↗
▸BISSTANDPIPE INSP REPORT : FP-841
12/29/2010310303196Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026B00521727-P1Open ↗
08/13/2026B00521727-I1Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
06/29/2017321498410Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/29/2017321498410Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
05/19/2017321498410Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
02/19/2021321498410Open ↗
02/19/2021321498410Open ↗
02/01/2021321498410Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
04/25/2018321498410Open ↗
06/29/2017321498410Open ↗
12/21/2016321498410Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00521727-I1Open ↗
08/13/2026B00500247-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/19/2021321498410Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/14/2017340523623Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY6
02/19/2021321498410Open ↗
02/19/2021321498410Open ↗
02/01/2021321498410Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
06/10/2020321498410Open ↗
05/13/2020321498410Open ↗
06/29/2017321498410Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
03/17/2020340619520Open ↗
07/15/2019340523623Open ↗
▸BISHYDRO FLOW TEST LETTER2
05/19/2017321498410Open ↗
Showing 1 of 2 on file for this type
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT2
05/13/2020321498410Open ↗
05/13/2020321498410Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
05/19/2017321498410Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
06/29/2017321498410Open ↗
▸Approvals, Objections & Sign-offs26
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
02/19/2021321498410Open ↗
02/01/2021321498410Open ↗
01/05/2021321585655Open ↗
Showing 3 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/25/2018321498410Open ↗
04/27/2017321498410Open ↗
Showing 2 of 3 on file for this type
▸BISHOUSE CONNECTION SIGNOFF1
09/10/2020321498410Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
10/30/2017321498410Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT4
08/13/2018321498410Open ↗
06/07/2017321585655Open ↗
04/17/2017321498410Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
12/07/2020321585655Open ↗
12/01/2020321498410Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
01/10/2018321498410Open ↗
06/29/2017321498410Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
01/10/2018321498410Open ↗
06/29/2017321498410Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms40
▸BISADDITIONAL INFORMATION24
02/17/2021321498410Open ↗
02/17/2021321498410Open ↗
02/17/2021321498410Open ↗
Showing 3 of 24 on file for this type
▸BISEFILING COVER SHEET8
06/07/2017321585655Open ↗
04/17/2017321498410Open ↗
03/28/2017321498410Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM5
03/17/2020340619520Open ↗
01/23/2020340619520Open ↗
01/13/2020321498410Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
07/19/2018340619520Open ↗
07/14/2017340523623Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents4
▸BISPLOT DIAGRAM2
05/19/2017321498410Open ↗
12/21/2016321498410Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
06/10/2020321498410Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00521727-I1Open ↗