One story retail building
926 MOTHER GASTON BLVD
BROOKLYN · Brownsville · BIN 3430175
💬 Discuss this project
1930Year Built
1Stories
K1Building Class
R6Zoning
2,915 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
One story retail building · Owner of record: 926 SZ LLC · 3,000 sf lot · 0.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing
Floor 31 filing
Floor 2
Floor 1Under Construction1 filing
Site & exteriorUnder Construction2 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WESTORCHARD MANAGEMENT2309/15/2026
PLATINUM SERVICES NY1108/29/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/15/2025$1.4M—— → —$480/sf building
11/03/2017$925K—— → —$317/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VASILIOS ARTEMIOU PE509/02/2026
BMG DESIGN BUILD LLC407/01/2026
ALWAYS FAST SERVICES CORP306/03/2026
ELEVATED ENGINEERING NYC410/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)1003/21/2026
XPDITE GROUP LLC 105603/21/2026
XPDITE GROUP LLC 104103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RNH SERVICES INCGeneral Contractor1209/13/2026
PLATINUM SERVICES NY LLCGeneral Contractor704/09/2026
PRIME PIPING & HEATING INFire Protection106/28/2026
PRIME PIPING & HEATING INPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161009/02/2026
Building Lifecycle
All (123)Filed (16)Permit Issued (15)Violation (13)Inspection (14)Objection (32)Special Inspection (30)Tax Incentive (3)
12/24/2026
485-x construction completed
09/11/2026
Permit issued — Support of Excavation
B01189780-S3-SE
09/11/2026
Permit issued — Foundation
B01189780-S2-FO
09/03/2026
Permit issued — Curb Cut
B01243498-I1-CC
09/02/2026
Filed — New Building
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO NB APPLICATION # B01189780-I1
B01189780-P4
08/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
08/31/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
08/31/2026
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
08/27/2026
Objection resolved — Resolved
08/26/2026
Objection raised — Other
08/21/2026
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
08/21/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/19/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
08/19/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/10/2026
Objection resolved — Addressed
08/04/2026
Objection raised — Other
07/01/2026
Filed — New Building
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO NB APPLICATION # B01189780-I1
B01189780-P3
06/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
06/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
06/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
06/26/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
06/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Air barrier continuity plan testing
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Exterior lighting power
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Lighting in dwelling units
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Electrical motors and elevators
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Protection of exposed foundation insulation
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
06/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
06/08/2026
Violation issued (ECB, closed)
Construction
06/08/2026
Violation issued (ECB, closed)
Construction
06/08/2026
Violation issued (ECB, closed)
Unknown
06/03/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B01348220-P1
06/03/2026
Filed — New Building
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO NB APPLICATION # B01189780-I1
B01189780-P2
06/01/2026
Violation issued (ECB, closed)
Construction
06/01/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
06/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
06/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
04/29/2026
Permit issued — General Construction
B01189780-I1-GC
04/27/2026
Violation issued (ECB, open)
Construction
04/27/2026
Violation issued (ECB, closed)
Construction
04/27/2026
Violation issued (ECB, closed)
Unknown
04/23/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/21/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/27/2026
Violation issued (ECB, closed)
Unknown
03/27/2026
Violation issued (ECB, closed)
Unknown
03/27/2026
Violation issued (ECB, closed)
Construction
03/26/2026
Permit issued — Mechanical Systems
B01189780-S5-MS
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationPermit IssuedRNH SERVICES INC09/11/2026
DOB NOWFoundationPermit IssuedRNH SERVICES INC09/11/2026
DOB NOWCurb CutPermit IssuedRNH SERVICES INC09/03/2026
DOB NOWGeneral ConstructionPermit IssuedRNH SERVICES INC04/29/2026
DOB NOWMechanical SystemsPermit IssuedRNH SERVICES INC03/26/2026
DOB NOWProtection and Mechanical MethodsSigned-offPLATINUM SERVICES NY LLC02/06/2026
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC01/30/2026
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC01/30/2026
DOB NOWSupport of ExcavationPermit IssuedRNH SERVICES INC12/19/2025
DOB NOWGeneral ConstructionPermit IssuedRNH SERVICES INC12/19/2025
DOB NOWEarth WorkPermit IssuedRNH SERVICES INC12/19/2025
DOB NOWStructuralPermit IssuedRNH SERVICES INC12/19/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN12/03/2025
DOB NOWSprinklersSigned-offA M B MECHANICAL INC10/28/2025
DOB NOWConstruction FencePermit IssuedRNH SERVICES INC10/22/2025
1 project · most recent 09/02/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/02/2026Permit IssuedRNH SERVICES INCHeating and Air Conditioning Systems
Heat / Cool
Daikin 4MXS36WMVJU9 36,000 BTU · Split System ×11
RXTQ36TBVJUB 37,000 BTU · Vrf Outdoor ×6
RZQ18TBVJU 20,000 BTU · Split System ×5
2MXS18WMVJU9 18,500 BTU · Split System ×1
5MXS48WVJU9 48,500 BTU · Split System ×1
RXSQ24TBVJUB 25,800 BTU · Split System ×1
1 project · most recent 09/02/2026
Sprinkler System
FiledStatusContractorScope
09/02/2026Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 09/02/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/02/2026Signed-offPRIME PIPING & HEATING INGas, Storm, Water/Sanitary
3 projects · most recent 03/31/2026
General Wiring
FiledStatusContractorScope
03/31/2026Permit IssuedS&R ELECTRICAL & MECHANICGeneral Wiring
03/17/2026Permit IssuedINTELOGIC ELECTRIC, INC.—
01/30/2026CompleteRICHARD NEU—
1 project · most recent 09/02/2026
Concrete Masonry
FiledStatusContractorScope
09/02/2026Permit IssuedRNH SERVICES INCConcrete, Masonry
2 projects · most recent 06/03/2026
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
06/03/2026Signed-offPLATINUM SERVICES NY LLCScaffold, Sidewalk Shed
06/18/2025Permit IssuedRNH SERVICES INCFence
1 project · most recent 09/02/2026
Earthwork
FiledStatusContractorScope
09/02/2026Permit IssuedRNH SERVICES INCEarthwork
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
08/21/2026Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
08/21/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/19/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
08/19/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/23/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/21/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/13/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/13/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/10/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/20/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/20/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/07/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
08/31/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
08/31/2026Sprinkler SystemsSHAHRIAR QUAYYUMspecial
08/31/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
06/26/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
06/26/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
06/26/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
06/26/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
06/26/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
06/11/2026MeteringSHAHRIAR QUAYYUMenergy_progress
06/11/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
06/11/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
06/11/2026Exterior lighting powerSHAHRIAR QUAYYUMenergy_progress
06/11/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
06/11/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
06/11/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
06/11/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
06/11/2026Lighting in dwelling unitsSHAHRIAR QUAYYUMenergy_progress
06/11/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
06/11/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
06/11/2026Air barrier continuity plan testingSHAHRIAR QUAYYUMenergy_progress
06/11/2026Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
06/11/2026Electrical motors and elevatorsSHAHRIAR QUAYYUMenergy_progress
06/11/2026Exterior Insulation and Finish Systems (EIFS)SHAHRIAR QUAYYUMspecial
06/11/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
06/11/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
Latest 25 of 68.
▾Documents — 77 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/21/2026B01242220-I1Request digital key ↗
08/21/2026B01243498-I1Request digital key ↗
08/18/2026B01348220-P1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
02/24/2026340922407Open ↗
12/22/2025340922407Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/22/2025340922407Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026B01189780-I1Open ↗
08/15/2026B01189780-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026B01189780-I1Open ↗
▸Seals & Professional Certifications37
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/15/2026B01189780-P4Open ↗
08/21/2026B01242220-I1Open ↗
08/18/2026B01348220-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026B01189780-P4Open ↗
08/27/2026B01189780-S6Open ↗
08/27/2026B01189780-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/27/2026B01189780-I1Open ↗
08/27/2026B01189780-I1Open ↗
08/27/2026B01189780-S5Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/22/2025340922407Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/22/2025340922407Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/15/2026B01189780-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/15/2026B01189780-I1Open ↗
08/15/2026B01189780-P3Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/22/2025340922407Open ↗
▸BISSTREET TREE CHECKLIST1
02/24/2026340922407Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026B01189780-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/14/2026B01189780-S2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/14/2026B01189780-S2Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
12/22/2025340922407Open ↗
▸Other Documents10
▸DOB NOWProperty Ownership Certification2
08/15/2026B01189780-I1Open ↗
08/15/2026B01189780-P3Open ↗
▸DOB NOWSite Survey: Initial2
08/15/2026B01189780-I1Open ↗
08/15/2026B01189780-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026B01189780-I1Open ↗
08/15/2026B01189780-P3Open ↗
▸DOB NOWAdjoining Owners Notification2
08/14/2026B01189780-S2Open ↗
08/14/2026B01189780-S3Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
02/24/2026340922407Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
02/24/2026340922407Open ↗