← Back
Walk-up apt, over six families with stores
928 MYRTLE AVENUE
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3324222
💬 Discuss this project
1906Year Built
5Stories
C7Building Class
R7DZoning
61,125 sfGross Floor Area
108Units
LL97 CoveredRent Stabilized24 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 928 MYRTLE LLC · 17,000 sf lot · 3.6 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Sub-Basement3p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THE HAMILTON GROUP903/22/2026
928 MYRTLE LLC303/22/2026
928 MYRTLE AVE203/21/2026
DJUKO REALTY INC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/15/2014$22.5M—— → —$368/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYED ENGINEERING, P.C.206/29/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHANDRABALI RAMANANDGeneral Contractor103/21/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYED ENGINEERING, P.C.7054106/24/2021
Building Lifecycle
All (77)Filed (2)Permit Issued (2)Signed Off (2)Violation (60)Inspection (4)Special Inspection (7)
05/07/2026
Violation issued (HPD, closed)
A
06/12/2025
Violation issued (HPD, closed)
A
09/15/2023
Violation issued (HPD, closed)
B
09/15/2023
Violation issued (HPD, closed)
C
09/15/2023
Violation issued (HPD, closed)
B
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/08/2022
Violation issued (HPD, closed)
A
01/01/2022
Violation issued (HPD, closed)
C
01/01/2022
Violation issued (HPD, closed)
B
01/01/2022
Violation issued (HPD, closed)
B
12/22/2021
Signed off — Alteration
Proposing new laundry room in basement. No change in use, egress or occupancy.
B00545535-I1
12/21/2021
Signed off — Alteration
Proposing new laundry room in basement. No change in use, egress or occupancy.
B00545535-S2
11/15/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/12/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/21/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/28/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/22/2021
Permit issued — Plumbing
B00545535-S2-PL
07/14/2021
Permit issued — General Construction
B00545535-I1-GC-CX
06/29/2021
Filed — Alteration
Proposing new laundry room in basement. No change in use, egress or occupancy.
B00545535-S2
06/24/2021
Filed — Alteration
Proposing new laundry room in basement. No change in use, egress or occupancy.
B00545535-I1
06/23/2021
Special inspection requirement — Mechanical Systems
RAFI HAMID
06/23/2021
Special inspection requirement — Heating Systems
RAFI HAMID
06/23/2021
Special inspection requirement — Final
RAFI HAMID
06/23/2021
Special inspection requirement — Energy Code Compliance Inspections
RAFI HAMID
06/23/2021
Special inspection requirement — HVAC-R and service water heating system controls
RAFI HAMID
06/23/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
RAFI HAMID
06/23/2021
Special inspection requirement — HVAC-R and service water heating equipment
RAFI HAMID
04/16/2021
Violation issued (HPD, closed)
A
01/06/2021
Violation issued (HPD, closed)
B
01/06/2021
Violation issued (HPD, closed)
B
01/06/2021
Violation issued (HPD, closed)
B
01/06/2021
Violation issued (HPD, closed)
B
09/13/2018
Violation issued (HPD, closed)
B
09/13/2018
Violation issued (HPD, closed)
A
09/13/2018
Violation issued (HPD, closed)
B
08/08/2018
Violation issued (HPD, closed)
B
08/01/2018
Violation issued (HPD, closed)
A
05/31/2018
Violation issued (HPD, closed)
A
05/31/2018
Violation issued (HPD, closed)
B
05/31/2018
Violation issued (HPD, closed)
B
05/21/2018
Violation issued (HPD, closed)
B
05/21/2018
Violation issued (HPD, closed)
B
05/21/2018
Violation issued (HPD, closed)
B
03/08/2018
Violation issued (HPD, closed)
B
03/08/2018
Violation issued (HPD, closed)
C
03/08/2018
Violation issued (HPD, closed)
B
03/08/2018
Violation issued (HPD, closed)
B
03/08/2018
Violation issued (HPD, closed)
C
03/08/2018
Violation issued (HPD, closed)
A
09/19/2017
Violation issued (HPD, closed)
B
09/19/2017
Violation issued (HPD, closed)
B
09/19/2017
Violation issued (HPD, closed)
A
09/19/2017
Violation issued (HPD, closed)
B
09/08/2017
Violation issued (HPD, closed)
B
09/08/2017
Violation issued (HPD, closed)
A
09/08/2017
Violation issued (HPD, closed)
B
09/08/2017
Violation issued (HPD, closed)
B
09/08/2017
Violation issued (HPD, closed)
B
09/08/2017
Violation issued (HPD, closed)
A
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN07/22/2021
DOB NOWGeneral ConstructionSigned-offCHANDRABALI RAMANAND07/14/2021
BISBLISSUEDA & C COMBUSTION SERVICES CORP09/11/2002
BISFSISSUEDA & C COMBUSTION SERVICES CORP11/20/2001
1 project · most recent 07/07/2021
General Wiring
FiledStatusContractorScope
07/07/2021CompleteACCURATE ELEC'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/15/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/12/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/21/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/28/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
06/23/2021Mechanical SystemsRAFI HAMIDspecial
06/23/2021Heating SystemsRAFI HAMIDspecial
06/23/2021FinalRAFI HAMIDprogress
06/23/2021Energy Code Compliance InspectionsRAFI HAMIDprogress
06/23/2021HVAC-R and service water heating system controlsRAFI HAMIDenergy_progress
06/23/2021HVAC-R and service water piping design and insulationRAFI HAMIDenergy_progress
06/23/2021HVAC-R and service water heating equipmentRAFI HAMIDenergy_progress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/01/2026B00545535-S2Request digital key ↗
09/01/2026B00545535-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026B00545535-I1Open ↗
08/28/2026B00545535-I1Open ↗
08/28/2026B00545535-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/01/2026B00545535-S2Open ↗
09/01/2026B00545535-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B00545535-I1Open ↗
08/28/2026B00545535-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00545535-S2Open ↗
09/01/2026B00545535-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00545535-I1Open ↗