Two stories - detached, small or mid-size
928 POST AVENUE
STATEN ISLAND · Port Richmond · BIN 5024129
💬 Discuss this project
1940Year Built
2.5Stories
A1Building Class
R3AZoning
1,498 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 5,000 sf lot · 0.3 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC111/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272111/06/2025
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
01/14/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01313694-I1
11/13/2025
Permit issued — Solar
S01313694-I1-SL
11/06/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01313694-I1
11/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
11/06/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
11/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
11/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
11/04/2025
Special inspection requirement — Final
Walid Abdulla
05/28/2009
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC11/13/2025
1 project · most recent 11/06/2025
FiledStatusContractorScope
11/06/2025CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/06/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
11/06/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
11/04/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/04/2025Energy Code Compliance InspectionsWalid Abdullaprogress
11/04/2025FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026S01313694-I1Open ↗
08/26/2026S01313694-I1Open ↗
08/26/2026S01313694-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026S01313694-I1Open ↗
08/26/2026S01313694-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01313694-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01313694-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01313694-I1Open ↗