← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Strauss Park Realty
929 WEST END AVENUE · BIN 1057240
💬 Discuss this project
1925Year Built
7Stories
D1Building Class
R8Zoning
27,566 sfGross Floor Area
28Units
LL97 CoveredRent Stabilized24 Active Violations 11 unresolved · 13 paperwork only 2 likely answered 3 old, status unconfirmed ▸FISP: No Report Filed
Elevator apt, semi-fireproof without stores · Owner of record: Strauss Park Realty · 5,000 sf lot · 5.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 6Unit 6C, Unit 6D1p · 1 filing · 4 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorBrusco Realty Management LLCUnder Construction7p · 2 filings · 5 docs
Filed — no permit issuedBrusco Realty Management LLC11p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Strauss Park Realty603/22/2026
929-31 West End Ave203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Serdar Ceylan Architect104/08/2026
Ashraf105/20/2025
Jose M. Landauro, P.E.105/05/2025
Paul Perdek, Professional Engineering101/07/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Right Way Services NYC203/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Andamio ScaffoldingScaffold1609/15/2026
Everest ScaffoldingScaffold403/21/2026
Nulite Fuel OilPlumbing203/21/2026
NCJ ContractingGeneral Contractor109/09/2026
Jam ElectricalElectrical103/21/2026
Psec PLG HeatingPlumbing103/21/2026
Borowide Elect'l ContractorsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ceylan Design and Consulting8422104/08/2026
Jose M. Landauro3500105/05/2025
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
10/29/2026
Elevator Category 1 inspection report filed
10/05/2026
Boiler inspection report filed
Initial · no defects · Accepted
09/14/2026
Permit renewed — Sidewalk Shed
Renewed without changes
M00290194-I1-SH
09/09/2026
Signed off — Alteration
THE PROPOSED WORK CONSISTS OF RECONSTRUCTING THE KITCHEN WALL BETWEEN APARTMENT 6C AND APARTMENT 6D IN ITS ORIGINAL LOCATION, RESTORING THE APARTMENTS TO THEIR PRIOR CONFIGURATION, AND ADDRESSING DOB VIOLATION #022201CB7PH02 AND ECB VIOLATION #34267839J.
M01370721-I1
134 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding09/14/2026
DOB NOWGeneral ConstructionSigned-offNCJ Contracting09/04/2026
DOB NOWSupported ScaffoldPermit IssuedAndamio Scaffolding05/07/2026
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding09/17/2025
DOB NOWSupported ScaffoldPermit IssuedAndamio Scaffolding05/20/2025
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding09/23/2024
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding09/29/2023
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding10/06/2022
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding10/12/2021
DOB NOWSidewalk ShedPermit IssuedEverest Scaffolding01/06/2021
DOB NOWSidewalk ShedPermit IssuedEverest Scaffolding01/10/2020
BISPLISSUEDAce-Atlas Plbing & Heating02/19/2016
BISFBISSUEDJack Piccini01/02/2015
BISPLISSUEDAce-Atlas Plbing & Heating01/02/2015
BISPLISSUEDPsec PLG & Heating03/15/1996
BISOTISSUEDIzzo General Contractors03/06/1996
3 projects · most recent 01/22/2021
General Wiring
FiledStatusContractorScope
01/22/2021CompleteJ & F Electrical ContngGeneral Wiring
01/03/2020Permit IssuedBorowide Elect'l Contractors—
04/07/2019CompleteJam Electrical—
1 project · most recent 01/07/2020
Sidewalk Shed
FiledStatusContractorScope
01/07/2020Permit IssuedAndamio ScaffoldingSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
03/20/2026FinalSERDAR CEYLANprogress
03/11/2026Tenant Protection Plan Compliance—special
39 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account