Two stories - detached, small or mid-size
93-02 214 PLACE
QUEENS · BIN 4226514
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R2Zoning
1,598 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 3,300 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof3p · 2 filings · 20 docs
Floor 25p · 2 filings · 20 docs
Floor 11 filing · 20 docs
Cellar4p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FRSS GROUP CORP2303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/07/2022$720K—Private party → Private party$451/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAYM S. GROSS, ARCHITECT503/14/2024
RIKE TECH ASSOCIATES LLC103/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BRITZ ENTERPRISES INC.1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRSS GROUP CORPGeneral Contractor803/21/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIKE TECH ASSOCIATES LLC2965503/14/2024
Building Lifecycle
All (56)Filed (6)Permit Issued (5)Violation (1)Inspection (6)Objection (11)Special Inspection (27)
10/17/2025
Special inspection requirement — Structural Wood Frame
10/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
03/22/2024
Objection raised — Scope
03/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/14/2024
Filed — Alteration
enlarge at rear & open deck; install AND REMOVE NON BEARING PARTITIONS 2nd & 1st fl.
Q00818043-P1
03/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
03/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SYED RIZVI
03/01/2024
Special inspection requirement — Final
HAYM GROSS
03/01/2024
Special inspection requirement — Footing and Foundation
SYED RIZVI
03/01/2024
Special inspection requirement — Air barrier - visual inspection
SYED RIZVI
03/01/2024
Special inspection requirement — Fenestration air leakage
SYED RIZVI
03/01/2024
Special inspection requirement — Fenestration areas
SYED RIZVI
03/01/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
SYED RIZVI
03/01/2024
Special inspection requirement — Masonry
SYED RIZVI
03/01/2024
Special inspection requirement — Insulation placement and R values
SYED RIZVI
03/01/2024
Special inspection requirement — Concrete - Cast-In-Place
SYED RIZVI
02/29/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/05/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/19/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
07/18/2023
Filed — Alteration
kitchen fixtures at 2nd.fl.
Q00864614-P1
07/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
07/08/2023
Permit issued — Plumbing
Q00864614-I1-PL
06/09/2023
Filed — Alteration
kitchen fixtures at 2nd.fl.
Q00864614-I1
05/31/2023
Permit issued — Structural
Q00818043-I1-FO-EA
05/31/2023
Permit issued — Structural
Q00818043-I1-GC
05/31/2023
Permit issued — Structural
Q00818043-I1-ST
05/16/2023
Permit issued — Construction Fence
Q00860630-I1-FN
04/19/2023
Filed — Alteration
Q00860630-I1
04/02/2023
Objection raised — Other
04/02/2023
Objection resolved — Addressed
03/23/2023
Objection raised — Admin
03/23/2023
Objection resolved — Addressed
03/10/2023
Objection raised — Zoning
03/10/2023
Objection resolved — Addressed
03/10/2023
Objection raised — Zoning
03/10/2023
Objection resolved — Addressed
03/10/2023
Objection raised — Other
03/10/2023
Objection resolved — Addressed
03/06/2023
Filed — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT 2 TO 1 FAMILY DWELLING.
Q00835392-I1
02/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
01/27/2023
Filed — Alteration
enlarge at rear & open deck; install AND REMOVE NON BEARING PARTITIONS 2nd & 1st fl.
Q00818043-I1
01/24/2023
Special inspection requirement — Concrete - Cast-In-Place
SYED RIZVI
01/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
01/24/2023
Special inspection requirement — Masonry
SYED RIZVI
01/24/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SYED RIZVI
01/24/2023
Special inspection requirement — Final
HAYM GROSS
01/24/2023
Special inspection requirement — Footing and Foundation
SYED RIZVI
01/24/2023
Special inspection requirement — Fenestration areas
SYED RIZVI
01/24/2023
Special inspection requirement — Fenestration air leakage
SYED RIZVI
01/24/2023
Special inspection requirement — Air barrier - visual inspection
SYED RIZVI
01/24/2023
Special inspection requirement — Insulation placement and R values
SYED RIZVI
01/24/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
SYED RIZVI
12/27/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC07/08/2023
DOB NOWStructuralPermit IssuedFRSS GROUP05/31/2023
DOB NOWStructuralPermit IssuedFRSS GROUP05/31/2023
DOB NOWStructuralPermit IssuedFRSS GROUP05/31/2023
DOB NOWConstruction FencePermit IssuedFRSS GROUP05/16/2023
1 project · most recent 07/18/2023
Gas Water/Sanitary
FiledStatusContractorScope
07/18/2023Permit IssuedALL PRO PLBG & HTG INCGas, Water/Sanitary
1 project · most recent 06/13/2023
General Wiring
FiledStatusContractorScope
06/13/2023Permit IssuedNAS ELECTRIC CORPGeneral Wiring
1 project · most recent 03/14/2024
Wood
FiledStatusContractorScope
03/14/2024Permit IssuedFRSS GROUP CORPWood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/05/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/05/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/19/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
10/17/2025Structural Wood Frame—progress
10/17/2025Fire-Resistance Rated Construction—progress
03/01/2024Fire-Resistant Penetrations and JointsSYED RIZVIspecial
03/01/2024Structural Stability – Alterations of existing buildingsSYED RIZVIspecial
03/01/2024FinalHAYM GROSSprogress
03/01/2024Footing and FoundationSYED RIZVIprogress
03/01/2024Air barrier - visual inspectionSYED RIZVIenergy_progress
03/01/2024Fenestration air leakageSYED RIZVIenergy_progress
03/01/2024Fenestration areasSYED RIZVIenergy_progress
03/01/2024Fenestration and door U-factor and product ratingsSYED RIZVIenergy_progress
03/01/2024MasonrySYED RIZVIspecial
03/01/2024Insulation placement and R valuesSYED RIZVIenergy_progress
03/01/2024Concrete - Cast-In-PlaceSYED RIZVIspecial
07/25/2023Fire-Resistant Penetrations and JointsSYED RIZVIspecial
07/17/2023Fire-Resistant Penetrations and JointsSYED RIZVIspecial
02/27/2023Fire-Resistant Penetrations and JointsSYED RIZVIspecial
01/24/2023Concrete - Cast-In-PlaceSYED RIZVIspecial
01/24/2023Fire-Resistant Penetrations and JointsSYED RIZVIspecial
01/24/2023MasonrySYED RIZVIspecial
01/24/2023Structural Stability – Alterations of existing buildingsSYED RIZVIspecial
01/24/2023FinalHAYM GROSSprogress
01/24/2023Footing and FoundationSYED RIZVIprogress
01/24/2023Fenestration areasSYED RIZVIenergy_progress
01/24/2023Fenestration air leakageSYED RIZVIenergy_progress
01/24/2023Air barrier - visual inspectionSYED RIZVIenergy_progress
Latest 25 of 27.
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026Q00860630-I1Request digital key ↗
08/24/2026Q00864614-P1Request digital key ↗
08/24/2026Q00864614-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00818043-P1Open ↗
08/13/2026Q00818043-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00835392-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature6
08/29/2026Q00818043-P1Open ↗
08/29/2026Q00818043-P1Open ↗
08/29/2026Q00818043-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026Q00835392-I1Open ↗
08/24/2026Q00860630-I1Open ↗
08/24/2026Q00864614-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026Q00818043-P1Open ↗
08/24/2026Q00864614-I1Open ↗
08/23/2026Q00818043-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00835392-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026Q00864614-P1Open ↗
08/24/2026Q00864614-I1Open ↗
08/23/2026Q00818043-I1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports2
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026Q00818043-I1Open ↗
08/13/2026Q00818043-P1Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/13/2026Q00818043-I1Open ↗
08/13/2026Q00818043-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00818043-P1Open ↗
08/13/2026Q00818043-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00818043-I1Open ↗
08/13/2026Q00818043-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00818043-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026Q00835392-I1Open ↗