← Back
Two stories - detached, small or mid-size
93-20 224 STREET
QUEENS · Queens Village · BIN 4230291
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R2AZoning
2,418 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 7,500 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/17/2023$700K—Private party → Private party$290/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC110/22/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272110/22/2024
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
10/31/2024
Permit issued — Solar
Q01127731-I1-SL
10/22/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01127731-I1
10/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/16/2024
Special inspection requirement — Final
Walid Abdulla
10/16/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC10/31/2024
2 projects · most recent 10/22/2024
FiledStatusContractorScope
10/22/2024Permit IssuedSUNRUN SOLAR ELECTL CORP—
01/04/2023CompleteGLEN OAKS ELEC'L INC.1 meters
1 project · most recent 10/22/2024
FiledStatusContractorScope
10/22/2024Permit IssuedSUNRUN INSTALLATION SVC21 panels, 8.61 kw, 443.9 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/16/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/16/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/16/2024Energy Code Compliance InspectionsWalid Abdullaprogress
10/16/2024FinalWalid Abdullaprogress
10/16/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01127731-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/22/2026Q01127731-I1Open ↗
08/22/2026Q01127731-I1Open ↗
08/22/2026Q01127731-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/22/2026Q01127731-I1Open ↗
08/22/2026Q01127731-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026Q01127731-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026Q01127731-I1Open ↗