← Back
Two stories - detached, small or mid-size
93-46 210 PLACE
QUEENS · BIN 4224866
💬 Discuss this project
1940Year Built
2.5Stories
A1Building Class
R2Zoning
1,800 sfGross Floor Area
1Units
3 Open Violations 1 unresolved · 2 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,800 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
General
Roof1p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MS BUILDING DESIGN LLC107/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KINGS FIRE CONSTRUCTION203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MS BUILDING DESIGN LLC9220207/10/2025
Building Lifecycle
All (8)Filed (1)Violation (3)Objection (4)
08/19/2025
Objection resolved — Addressed
08/19/2025
Objection resolved — Addressed
07/31/2025
Objection raised — Zoning
07/31/2025
Objection raised — Code
07/10/2025
Filed — Alteration
INTERIOR RENOVATION, REPLACEMENT OF WATERDAMAGED GYPSUMBOAD, REPLACED CHARRED JOIST OR MEMBER. DIRECT REPLACEMENT OF TIOLET AND KITCHEN FIXTURES.
Q01248441-I1
04/25/2025
Violation issued (ECB, open)
Construction
04/25/2025
Violation issued (ECB, open)
Construction
04/25/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 3 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026Q01248441-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01248441-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01248441-I1Open ↗