← Back
BuildNYC
Walk-up apt, over six families with stores
93 BAXTER STREET
MANHATTAN · BIN 1083367
💬 Discuss this project
1880Year Built
7Stories
C7Building Class
C6-1Zoning
27,528 sfGross Floor Area
25Units
Rent Stabilized49 Active Violations 48 unresolved · 1 paperwork only 1 old, status unconfirmed ▸FISP: SAFE
Walk-up apt, over six families with stores · Owner of record: Baxter Realty Group · 5,060 sf lot · 5.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 7Facade repair work14p · 3 filings · 13 docs
Floor 6Facade repair work5p · 1 filing · 7 docs
Floor 5Facade repair work5p · 1 filing · 7 docs
Floor 4Facade repair work26p · 5 filings · 20 docs
Floor 3Facade repair work13p · 3 filings · 17 docs
Floor 2Facade repair work5p · 1 filing · 7 docs
Floor 1Facade repair work5p · 1 filing · 7 docs
Site & exteriorInstallation of sidewalk shed6p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development303/22/2026
Baxter Realty Group103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/29/2022$7.4M—CANBAX REALTY CORP. → BAXTER REALTY GROUP LLC$269/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DY Expediting2403/21/2026
Danico Services203/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
John Fitzgerald Plumbing & HeatingPlumbing407/08/2026
Ace Group NYScaffold303/21/2026
Moon ConstructionGeneral Contractor303/21/2026
Lakhi General ContractorScaffold203/21/2026
Standard ConstructionGeneral Contractor203/21/2026
Splen ConstructionGeneral Contractor207/08/2026
Kle ConstructionGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Empire Design5474106/07/2023
Hardie & Associates, Cons3760604/19/2023
Building Lifecycle
All (144)Filed (15)Permit Issued (12)Signed Off (7)Facade (FISP) (17)Violation (30)Inspection (16)Objection (32)Special Inspection (15)
05/08/2026
Violation issued (HPD, open)
A
03/19/2024
Cycle 9 facade report signed — SAFE
03/03/2024
Cycle 9 facade inspection completed
01/16/2024
Violation issued (ECB, closed)
Local Law
11/29/2023
Cycle 9 facade report submitted
11/16/2023
Signed off — Alteration
M00884865-I1
07/31/2023
Permit issued — General Construction
M00884865-I1-GC
07/31/2023
Permit issued — General Construction
M00884865-I1-GC
07/10/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/10/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/07/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/07/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/06/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/07/2023
Filed — Alteration
M00884865-I1
06/04/2023
Special inspection requirement — Tenant Protection Plan Compliance
Md Rashid
06/04/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Md Rashid
06/04/2023
Special inspection requirement — Masonry
Md Rashid
06/04/2023
Special inspection requirement — Final
Md Rashid
05/24/2023
Permit issued — Plumbing
M00838086-I1-PL
05/08/2023
Permit issued — General Construction
M00838085-I1-GC
05/04/2023
Objection raised — Other
05/04/2023
Objection resolved — Addressed
05/04/2023
Objection raised — Other
05/04/2023
Objection resolved — Addressed
05/04/2023
Objection raised — Scope
05/04/2023
Objection resolved — Addressed
05/04/2023
Objection raised — Other
05/04/2023
Objection resolved — Addressed
05/04/2023
Objection raised — Other
05/04/2023
Objection resolved — Addressed
05/04/2023
Objection raised — Other
05/04/2023
Objection resolved — Addressed
05/03/2023
Objection raised — Other
05/03/2023
Objection resolved — Addressed
05/01/2023
Signed off — Alteration
M00802341-I1
04/24/2023
Signed off — Alteration
PROPOSED PLUMBING WORK ON PARTIAL 3RD FLOOR VACATE APARTMENT # 5 OF AN EXIST 7 STORY MIXED USE BUILDING. PLUMBING WORK TYPE IS IN CONJUNCTION WITH DOB NOW APPLICATION # XXXXXXX. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00802343-I1
04/24/2023
Objection raised — Accessibility
04/24/2023
Objection resolved — Addressed
04/24/2023
Objection raised — Inspections
04/24/2023
Objection resolved — Addressed
04/24/2023
Objection raised — Scope
04/24/2023
Objection resolved — Addressed
04/24/2023
Objection raised — Inspections
04/24/2023
Objection resolved — Addressed
04/19/2023
Filed — Alteration
GUT REHAB ON PARTIAL 7TH FLOOR VACATE APARTMENT # 21 AND 22 OF AN EXIST 7 STORY MIXED USE BUILDING. PROPOSED NEW INTERIOR PARTITION, DOORS AND PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00838085-I1
04/19/2023
Filed — Alteration
PROPOSED PLUMBING WORK IN VACATE APARTMENT # 21 AND 22 OF AN EXIST 7 STORY MIXED USE BUILDING. PLUMBING WORK TYPE IS IN CONJUNCTION WITH DOB NOW APPLICATION # M00838085-I1. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00838086-I1
04/19/2023
Violation issued (HPD, open)
B
04/12/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/12/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/04/2023
Permit issued — Plumbing
M00802343-I1-PL
03/30/2023
Cycle 9 facade report signed — UNSAFE
03/29/2023
Cycle 9 facade report submitted
03/27/2023
Permit issued — General Construction
M00802341-I1-GC
03/16/2023
Cycle 9 facade inspection completed
03/01/2023
Permit issued — Sidewalk Shed
M00820931-I1-SH
02/23/2023
Signed off — Alteration
GUT REHAB ON PARTIAL 4TH FLOOR VACATE APARTMENT # 11 AND # 12 OF AN EXIST 7 STORY MIXED USE BUILDING. PROPOSED NEW INTERIOR PARTITION, DOORS AND PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M07998631-I1
02/23/2023
Signed off — Alteration
PROPOSED PLUMBING WORK ON PARTIAL 4TH FLOOR IN VACATE APARTMENT # 11 AND # 12 OF AN EXIST 7 STORY MIXED USE BUILDING. PLUMBING WORK TYPE IS IN CONJUNCTION WITH DOB NOW APPLICATION # M07998631-I1. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M07998633-I1
02/21/2023
Objection resolved — Addressed
02/16/2023
Filed — Alteration
PROPOSED PLUMBING WORK ON PARTIAL 3RD FLOOR VACATE APARTMENT # 5 OF AN EXIST 7 STORY MIXED USE BUILDING. PLUMBING WORK TYPE IS IN CONJUNCTION WITH DOB NOW APPLICATION # XXXXXXX. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00802343-I1
Latest 60 of 144 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offStandard Construction07/31/2023
DOB NOWGeneral ConstructionSigned-offMoon Construction07/31/2023
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating05/24/2023
DOB NOWGeneral ConstructionPermit IssuedKle Construction05/08/2023
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating04/04/2023
DOB NOWGeneral ConstructionSigned-offKle Construction03/27/2023
DOB NOWSidewalk ShedPermit IssuedAce Group NY03/01/2023
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating12/20/2022
DOB NOWGeneral ConstructionSigned-offSplen Construction11/30/2022
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating09/20/2022
DOB NOWGeneral ConstructionSigned-offSplen Construction08/17/2022
DOB NOWSidewalk ShedPermit IssuedLakhi General Contractor02/14/2020
BISFBISSUEDMaxwhale Co11/20/1995
BIS—ISSUEDService Sign Erectors08/17/1990
1 project · most recent 04/19/2023
Gas Water/Sanitary
FiledStatusContractorScope
04/19/2023Signed-offJohn Fitzgerald Plumbing & HeatingGas, Water/Sanitary
2 projects · most recent 05/19/2022
FiledStatusContractorScope
05/19/2022CompleteKings Electric Co23 meters, 23 new_meters
02/05/2020Permit IssuedGreen Power Electric—
1 project · most recent 01/30/2023
Sidewalk Shed
FiledStatusContractorScope
01/30/2023Permit IssuedAce Group NYSidewalk Shed
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
07/10/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/07/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/12/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/12/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/02/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/30/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/21/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/18/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/04/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
06/04/2023Tenant Protection Plan ComplianceMd Rashidspecial
06/04/2023Structural Stability – Alterations of existing buildingsMd Rashidspecial
06/04/2023MasonryMd Rashidspecial
06/04/2023FinalMd Rashidprogress
02/10/2023Fire-Resistant Penetrations and JointsELLIOTT HARDIEspecial
02/10/2023FinalELLIOTT HARDIEprogress
02/10/2023Energy Code Compliance InspectionsELLIOTT HARDIEprogress
12/21/2022Energy Code Compliance InspectionsELLIOTT HARDIEprogress
12/21/2022Fire-Resistant Penetrations and JointsELLIOTT HARDIEspecial
12/21/2022Lighting in dwelling unitsELLIOTT HARDIEenergy_progress
12/20/2022FinalELLIOTT HARDIEprogress
12/18/2022Lighting in dwelling unitsELLIOTT HARDIEenergy_progress
12/18/2022Fire-Resistant Penetrations and JointsELLIOTT HARDIEspecial
12/18/2022Energy Code Compliance InspectionsELLIOTT HARDIEprogress
12/18/2022FinalELLIOTT HARDIEprogress
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch14
09/02/2026M00773818-I1Request digital key ↗
09/01/2026M07998633-P1Request digital key ↗
09/01/2026M07998631-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00305775-I1Request digital key ↗
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/02/2026M00773818-P1Open ↗
09/02/2026M00773818-I1Open ↗
09/01/2026M07998633-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026M00884865-I1Open ↗
08/25/2026M00802341-I1Open ↗
08/25/2026M00802341-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026M00884865-I1Open ↗
09/02/2026M00884865-I1Open ↗
09/02/2026M00884865-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026M00305775-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/02/2026M00773818-I1Open ↗
09/01/2026M07998633-P1Open ↗
09/01/2026M07998631-I1Open ↗
Showing 3 of 13 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
09/02/2026M00773818-I1Open ↗