← Back
BuildNYC
Full service hotel
Wyndham Garden Chinatown
93 BOWERY · BIN 1082490
💬 Discuss this project
2009Year Built
18Stories
H2Building Class
C6-1GZoning
48,642 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMP
Full service hotel · Owner of record: 93 Bowery Holdings · 5,452 sf lot · 8.92 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 18Boiler workUnder Construction3p · 4 filings · 20 docs
Floor 17Roof top alteration for eating and drinking establishment3p · 2 filings · 11 docs
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
93 Bowery Holdings6203/22/2026
Music Palace903/21/2026
Associates403/21/2026
B & H General Cont303/21/2026
Calabrese Associates303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JD Engineering610/07/2026
MW Professional Engineering104/30/2026
Project Tactical Solutions111/01/2021
Morali Architecture108/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Anthony Morali Architect203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
E. Fitzgerald Electric CoElectrical203/21/2026
Broad USAGeneral Contractor207/08/2026
GGP Construction MgtmentGeneral Contractor203/21/2026
P.S.I. MechanicalPlumbing209/09/2026
Nelson & Tom Maintenance Inc DBElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JD Engineering9859710/07/2026
MW Professional Engineering570104/30/2026
Project Tactical Solution5859111/01/2021
Wavic Engineering1733108/24/2021
Building Lifecycle
All (116)Filed (9)Permit Issued (5)Signed Off (1)Facade (FISP) (11)Violation (60)Special Inspection (30)
10/07/2026
Filed — Alteration
INSTALL NEW GAS FIRE BOILERS. NO CHANGE OF USE, EGRESS AND OCCUPANCY
M01325994-P1
10/05/2026
Filed — Alteration
REMOVE GAS PIPING FROM THE DEMOLISHED GAS FIRE ABSORPTION CHILLERS AND PROVIDE NEW GAS PIPING FOR NEW GAS FIRE BOILERS. NO CHANGE OF USE, EGRESS AND OCCUPANCY
M01326000-P2
10/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Zhao Deng
10/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
Zhao Deng
10/02/2026
Special inspection requirement — Maintenance information
Zhao Deng
10/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
Zhao Deng
10/02/2026
Special inspection requirement — Heating Systems
Zhao Deng
10/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Zhao Deng
10/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
10/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
Zhao Deng
10/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Zhao Deng
09/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Zhao Deng
09/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/24/2026
Filed — Alteration
REMOVE GAS PIPING FROM THE DEMOLISHED GAS FIRE ABSORPTION CHILLERS AND PROVIDE NEW GAS PIPING FOR NEW GAS FIRE BOILERS. NO CHANGE OF USE, EGRESS AND OCCUPANCY
M01326000-P1
09/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Zhao Deng
09/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/08/2026
Permit issued — Plumbing
M01326000-I1-PL
09/08/2026
Permit issued — Boiler Equipment
M01325994-I1-BE
05/07/2026
Permit issued — General Construction
M01394515-I1-GC
04/30/2026
Filed — Alteration
Create a temporary wall opening on the non-bearing mechanical room wall, enclose opening after delivery of machine. No change in use, egress and occupancy
M01394515-I1
04/30/2026
Special inspection requirement — Masonry
MING WAI WONG
04/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
MING WAI WONG
04/29/2026
Special inspection requirement — Final
MING WAI WONG
12/19/2025
Permit issued — Mechanical Systems
M01325986-I1-MS
12/08/2025
Filed — Alteration
REMOVE EXISTING GAS FIRE ABSORPTION CHILLER AND REPLACE WITH NEW CHILLER. NO CHANGE IF USE, EGRESS AND OCCUPANCY
M01325986-I1
12/08/2025
Filed — Alteration
INSTALL NEW GAS FIRE BOILERS. NO CHANGE OF USE, EGRESS AND OCCUPANCY
M01325994-I1
12/08/2025
Filed — Alteration
REMOVE GAS PIPING FROM THE DEMOLISHED GAS FIRE ABSORPTION CHILLERS AND PROVIDE NEW GAS PIPING FOR NEW GAS FIRE BOILERS. NO CHANGE OF USE, EGRESS AND OCCUPANCY
M01326000-I1
12/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Zhao Deng
12/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
Zhao Deng
12/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
Zhao Deng
12/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Zhao Deng
12/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
Zhao Deng
12/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
Zhao Deng
12/08/2025
Special inspection requirement — Maintenance information
Zhao Deng
12/08/2025
Special inspection requirement — Heating Systems
Zhao Deng
11/28/2025
Special inspection requirement — Mechanical Systems
Zhao Deng
11/28/2025
Special inspection requirement — Final
Zhao Deng
11/17/2025
Violation issued (HPD, closed)
I
06/13/2025
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
I
04/17/2024
Violation issued (HPD, closed)
A
12/01/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/15/2023
Violation issued (HPD, closed)
I
03/31/2023
Violation issued (HPD, closed)
A
12/08/2022
Cycle 9 facade report signed — SWARMP
12/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2022
Violation issued (HPD, closed)
I
09/07/2022
Cycle 9 facade report submitted
08/19/2022
Cycle 9 facade inspection completed
03/10/2022
Violation issued (HPD, closed)
A
03/10/2022
Violation issued (HPD, closed)
I
11/01/2021
Filed — Alteration
Roof top alteration for accessory to eating and drinking establishment on ground level in compliance with Buildings Bulletin 2018-002
M00618863-I1
11/01/2021
Special inspection requirement — Energy Code Compliance Inspections
Max Lee
10/31/2021
Special inspection requirement — Exterior lighting power
Max Lee
10/31/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Max Lee
10/31/2021
Special inspection requirement — Interior lighting power
Max Lee
09/22/2021
Signed off — Alteration
M00581336-I1
09/10/2021
Permit issued — Mechanical Systems
M00581336-I1-MS
08/24/2021
Filed — Alteration
M00581336-I1
06/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedP.S.I. Mechanical09/08/2026
DOB NOWBoiler EquipmentPermit IssuedP.S.I. Mechanical09/08/2026
DOB NOWGeneral ConstructionPermit IssuedBroad USA05/07/2026
DOB NOWMechanical SystemsPermit IssuedBroad USA12/19/2025
DOB NOWMechanical SystemsSigned-offGGP Construction Mgtment09/10/2021
BISOTRE-ISSUEDMohammed T. Alshennawy09/17/2018
BISOTISSUEDMohammed T. Alshennawy09/13/2018
BISOTISSUEDMohammed T. Alshennawy07/24/2018
BISEQISSUEDArsenal Scaffold07/18/2018
BISEQISSUEDArsenal Scaffold07/07/2017
BISPLISSUEDCatman Plumbing10/07/2016
BISMHISSUEDYongxin Int Contractor I*07/12/2016
BISPLISSUEDCatman Plumbing09/09/2015
BISOTISSUEDYongxin Int Contractor I*09/04/2015
BISPLISSUEDHja Plumbing & Heating02/20/2014
BISOTISSUEDDream Homes Contracting I02/20/2013
BISBLISSUEDVis Plumbing & Heating & Mechanical09/07/2012
BISPLISSUEDVis Plumbing & Heating & Mechanical09/04/2012
BISPLISSUEDVis Plumbing & Heating & Mechanical08/28/2012
BISSDISSUEDVis Plumbing & Heating & Mechanical07/10/2012
BISMHISSUEDVis Plumbing, Heating & Mechanical02/28/2012
BIS—ISSUEDNorth Shore Neon Sign Co02/16/2012
BIS—ISSUEDNorth Shore Neon Sign Co02/15/2012
BIS—ISSUEDCalabrese Associates02/13/2012
BISEQISSUEDCalabrese Associates02/13/2012
BISEQISSUEDB & H General Cont02/10/2012
BIS—RE-ISSUEDCalabrese Associates12/13/2011
BISEQISSUEDCalabrese Associates12/12/2011
BISFPISSUEDChief Fire Prev. & Mechanical Co11/16/2011
BISOTISSUEDChief Fire Prevention & Mechanical10/26/2011
BISPLISSUEDVis Plumbing & Heating & Mechanical09/01/2011
BISSPISSUEDVis Plumbing & Heating & Mechanical07/07/2011
BISEQISSUEDM.S.S. Construction03/21/2011
BISMHISSUEDVis Plumbing, Heating & Mechanical03/01/2011
BIS—ISSUEDCalabrese Associates12/09/2010
BISPLISSUEDVis Industries08/31/2010
BISEQISSUEDCalabrese Associates08/26/2010
BISEQISSUEDCalabrese Associates08/11/2010
BISMHISSUEDVis Plumbing, Heating & Mechanical07/19/2010
BISSPISSUEDVis Industries07/08/2010
+ 15 more permits on file
1 project · most recent 12/08/2025
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/08/2025Permit IssuedBroad USAAir Conditioning Systems, Ventilation Systems
Cooling
1 project · most recent 10/05/2026
Gas
FiledStatusContractorScope
10/05/2026Permit IssuedP.S.I. MechanicalGas
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
10/02/2026Fire-Resistant Penetrations and JointsZhao Dengspecial
10/02/2026HVAC-R and service water heating system controlsZhao Dengenergy_progress
10/02/2026Maintenance informationZhao Dengenergy_progress
10/02/2026Tenant Protection Plan ComplianceZhao Dengspecial
10/02/2026Heating SystemsZhao Dengspecial
10/02/2026Fire-Resistant Penetrations and JointsZhao Dengspecial
10/02/2026Tenant Protection Plan Compliance—special
10/02/2026HVAC-R and service water heating equipmentZhao Dengenergy_progress
10/02/2026HVAC-R and service water piping design and insulationZhao Dengenergy_progress
09/29/2026Fire-Resistant Penetrations and JointsZhao Dengspecial
09/29/2026Tenant Protection Plan Compliance—special
09/24/2026Fire-Resistant Penetrations and JointsZhao Dengspecial
09/24/2026Tenant Protection Plan Compliance—special
04/30/2026MasonryMING WAI WONGspecial
04/30/2026Tenant Protection Plan ComplianceMING WAI WONGspecial
04/29/2026FinalMING WAI WONGprogress
12/08/2025Fire-Resistant Penetrations and JointsZhao Dengspecial
12/08/2025Tenant Protection Plan ComplianceZhao Dengspecial
12/08/2025Tenant Protection Plan ComplianceZhao Dengspecial
12/08/2025HVAC-R and service water piping design and insulationZhao Dengenergy_progress
12/08/2025HVAC-R and service water heating equipmentZhao Dengenergy_progress
12/08/2025HVAC-R and service water heating system controlsZhao Dengenergy_progress
12/08/2025Maintenance informationZhao Dengenergy_progress
12/08/2025Heating SystemsZhao Dengspecial
11/28/2025Mechanical SystemsZhao Dengspecial
Latest 25 of 33.
▾Documents — 443 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/03/2026M00581336-I1Request digital key ↗
09/03/2026M00618863-I1Request digital key ↗
08/20/2026M01325986-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits94
▸BISPLAN / WORK APPROVAL APPLICATION57
05/04/2021104304691Open ↗
04/30/2021104556632Open ↗
06/07/2019120363374Open ↗
Showing 3 of 57 on file for this type
▸BISWORK PERMIT APPLICATION35
10/26/2018122948472Open ↗
10/19/2018122948472Open ↗
09/13/2018122948472Open ↗
Showing 3 of 35 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUEST FOR CERTIFICATE OF OCCUPANCY WITH OPEN APPLICATION(S)1
05/27/2021104304691Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
06/25/2021104304691Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/25/2021104304691Open ↗
▸Seals & Professional Certifications98
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION27
05/29/2019121536285Open ↗
05/29/2019121536285Open ↗
05/10/2019120137583Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
10/09/2026M01325994-P1Open ↗
10/09/2026M01325994-P1Open ↗
10/09/2026M01325994-P1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
09/11/2017123113683Open ↗
03/24/2017123044669Open ↗
09/29/2015122453647Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
10/09/2026M01325994-P1Open ↗
10/09/2026M01325994-P1Open ↗
10/09/2026M01325994-P1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
10/05/2026M01326000-P2Open ↗
10/05/2026M01326000-P1Open ↗
09/03/2026M00581336-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
05/08/2018140763617Open ↗
09/11/2017123113683Open ↗
09/11/2017123113683Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
05/08/2018140763617Open ↗
07/06/2017140665144Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/08/2018140763617Open ↗
07/06/2017140665144Open ↗
▸Trade Schedules & Equipment61
▸BISSELF-CERT PLUMBING NOTICE24
10/24/2014120089180Open ↗
03/24/2014121536285Open ↗
03/24/2014121536285Open ↗
Showing 3 of 24 on file for this type
▸BISSCHEDULE B - PLUMBING15
02/21/2013121536285Open ↗
Showing 1 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
10/28/2016122453647Open ↗
08/29/2016122453647Open ↗
08/16/2016122453647Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS1
09/05/2017120137583Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
05/27/2021104304691Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
05/27/2021104304691Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
09/05/2017120137583Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
06/15/2021104304691Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE PROTECTION PLAN (FPP): FDNY APPROVAL1
06/15/2021104304691Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes4
09/08/2017123113683Open ↗
08/03/2017122948472Open ↗
05/08/2018140763617Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
07/09/2018122948472Open ↗
06/04/2018122948472Open ↗
▸Environmental & Asbestos16
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER11
09/29/2015122453647Open ↗
Showing 1 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)2
02/21/2013121536285Open ↗
Showing 1 of 2 on file for this type
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
05/29/2019121536285Open ↗
05/29/2019121536285Open ↗
05/10/2019120137583Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
04/22/2021122453647Open ↗
04/26/2019122948472Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
02/21/2013121536285Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/06/2017140665144Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/22/2021122453647Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/22/2021122453647Open ↗
05/08/2018140763617Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
03/12/2020140665144Open ↗
05/03/2019122948472Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
06/15/2021104304691Open ↗
▸BISDOB FINAL INSPECTION REQUIRED1
04/22/2021122453647Open ↗
▸Approvals, Objections & Sign-offs52
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST26
04/22/2021122453647Open ↗
12/28/2020104304691Open ↗
09/28/2020104304691Open ↗
Showing 3 of 26 on file for this type
▸BISADMINISTRATIVE OBJECTIONS16
02/21/2013121536285Open ↗
Showing 1 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
07/18/2018140665144Open ↗
07/09/2018122948472Open ↗
07/09/2018122948472Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER3
10/26/2018122948472Open ↗
10/16/2018122948472Open ↗
09/13/2018122948472Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
06/15/2021104304691Open ↗
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT24
04/22/2021122453647Open ↗
05/10/2019120137583Open ↗
04/26/2019122948472Open ↗
Showing 3 of 24 on file for this type
▸Filing & Intake Forms56
▸BISBOROUGH INTAKE FORM25
04/13/2020104304691Open ↗
03/12/2020140665144Open ↗
06/07/2019120363374Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING COVER SHEET15
09/11/2017123113683Open ↗
03/24/2017123044669Open ↗
09/29/2015122453647Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION11
07/26/2019122453647Open ↗
09/28/2018140665144Open ↗
08/16/2016122453647Open ↗
Showing 3 of 11 on file for this type
▸BISeFiling Job Application Cover Sheet4
05/08/2018140763617Open ↗
07/06/2017140665144Open ↗
Showing 2 of 4 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
11/29/2019104304691Open ↗
11/29/2019104304691Open ↗
04/12/2017123044669Open ↗
Showing 3 of 7 on file for this type