← Back
BuildNYC
Two family frame
93 CRAIG AVENUE
STATEN ISLAND · BIN 5166435
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3XZoning
3,151 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family frame · 3,802 sf lot · 0.83 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Floor 220p · 1 filing · 20 docs
Floor 1Construction fence installation34p · 2 filings · 20 docs
Basement20p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Stanley M. Krebushevski, R.A508/22/2023
William Montague Engineering210/29/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Maximum ContractingGeneral Contractor507/08/2026
Maximum ContractingScaffold507/08/2026
Premier PL, Heating & MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA Planning & Expediting5677308/22/2023
Building Lifecycle
03/20/2024
Signed off — Alteration
PROPOSED 8' PLYWOOD/OSB CONSTRUCTION FENCE
S00675631-I1
09/15/2023
Permit renewed — Construction Fence
Renewed without changes
S00675631-I1-FN
09/07/2023
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
S00488276-I1-GC-CX
08/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
08/23/2023
Special inspection requirement — Footing and Foundation
WILLIAM MONTAGUE
60 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offMaximum Contracting09/15/2023
DOB NOWCurb CutSigned-offMaximum Contracting11/02/2022
DOB NOWGeneral ConstructionPermit IssuedMaximum Contracting09/07/2022
DOB NOWConstruction FenceSigned-offMaximum Contracting09/07/2022
DOB NOWPlumbingSigned-offPremier PL, Heating & Mechanical03/01/2022
DOB NOWEarth WorkPermit IssuedMaximum Contracting02/15/2022
DOB NOWConstruction FenceSigned-offMaximum Contracting02/09/2022
1 project · most recent 08/22/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/22/2023Signed-offPremier PL, Heating & MechanicalGas, Storm, Water/Sanitary
1 project · most recent 04/30/2022
General Wiring
FiledStatusContractorScope
04/30/2022CompleteA. J. Caruso Electrical IGeneral Wiring
1 project · most recent 08/22/2023
Wood
FiledStatusContractorScope
08/22/2023Signed-offMaximum ContractingWood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/23/2023Pass-Final CND-Occupancy InspectionPassView ↗
02/23/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
11/11/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/26/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/26/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/10/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/07/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
08/23/2023Subgrade InspectionsWILLIAM MONTAGUEspecial
08/23/2023Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
08/23/2023Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
08/23/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
08/23/2023Mechanical SystemsWILLIAM MONTAGUEspecial
08/23/2023Heating SystemsWILLIAM MONTAGUEspecial
08/23/2023Footing and FoundationWILLIAM MONTAGUEprogress
08/23/2023Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
08/23/2023FinalWILLIAM MONTAGUEprogress
08/23/2023Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
08/23/2023Structural Wood FrameWILLIAM MONTAGUEprogress
08/23/2023HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
08/23/2023Maintenance informationWILLIAM MONTAGUEenergy_progress
08/23/2023Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
08/23/2023Air barrier — testing WILLIAM MONTAGUEenergy_progress
08/23/2023Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
08/23/2023Interior lighting powerWILLIAM MONTAGUEenergy_progress
08/23/2023Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
08/23/2023HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
08/23/2023Permanent certificateWILLIAM MONTAGUEenergy_progress
08/23/2023Fenestration air leakageWILLIAM MONTAGUEenergy_progress
08/23/2023Fenestration areasWILLIAM MONTAGUEenergy_progress
08/23/2023Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
08/23/2023MeteringWILLIAM MONTAGUEenergy_progress
08/23/2023HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
Latest 25 of 81.
67 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account