← Back
One family attached or semi-detached
93 HAMPTON GREEN
STATEN ISLAND · Arden Heights-Rossville · BIN 5078089
💬 Discuss this project
1973Year Built
2Stories
A5Building Class
R3-2Zoning
1,496 sfGross Floor Area
1Units
One family attached or semi-detached · 1,760 sf lot · 0.85 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC208/15/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272208/15/2024
Building Lifecycle
All (14)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (10)
08/26/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01076274-I1
08/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/16/2024
Special inspection requirement — Final
Walid Abdulla
08/16/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/15/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01076274-P1
08/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/02/2024
Special inspection requirement — Final
Walid Abdulla
08/02/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
07/22/2024
Permit issued — Solar
S01076274-I1-SL
07/11/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01076274-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC07/22/2024
1 project · most recent 07/11/2024
FiledStatusContractorScope
07/11/2024CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
08/16/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/16/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/16/2024Energy Code Compliance InspectionsWalid Abdullaprogress
08/16/2024FinalWalid Abdullaprogress
08/16/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
08/02/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/02/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/02/2024Energy Code Compliance InspectionsWalid Abdullaprogress
08/02/2024FinalWalid Abdullaprogress
08/02/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026S01076274-P1Request digital key ↗
08/21/2026S01076274-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
08/24/2026S01076274-P1Open ↗
08/24/2026S01076274-P1Open ↗
08/24/2026S01076274-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/24/2026S01076274-P1Open ↗
08/24/2026S01076274-P1Open ↗
08/22/2026S01076274-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026S01076274-P1Open ↗
08/21/2026S01076274-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026S01076274-P1Open ↗
08/21/2026S01076274-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01076274-I1Open ↗