← Back
Three families
93 MCGUINNESS BOULEVARD
BROOKLYN · BIN 3066185
💬 Discuss this project
1901Year Built
3Stories
C0Building Class
R7AZoning
2,887 sfGross Floor Area
3Units
Rent Stabilized20 Open Violations ▸FDNY Report ↗
Three families · Owner of record: ARBOR2 LLC · 2,500 sf lot · 1.15 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbing
Roof4p · 1 filing · 20 docs
Bulkhead3p · 1 filing · 20 docs
Floor 51p · 1 filing · 20 docs
Floor 4
Floor 3
Floor 2
Floor 1
Cellar3p · 1 filing · 20 docs
Basement2p · 1 filing · 6 docs
1 job · most recent 12/16/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/16/2024——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM42NAMHZ-U1 42,000 BTU · Heat Pump Outdoor ×5
MXZ-SM24NAMHZ-U1 24,000 BTU · Heat Pump Outdoor ×2
Qmark CWH 1101DSF 1 kW · Electric Heater ×5
CWH 3150 5,120 BTU · Electric Heater ×3
Ventilation
Trane OABD036F3-C1B401LE-D3B00AG0004000B0C4A0 38,000 BTU · Rooftop Unit ×1
2 jobs · most recent 06/09/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
06/09/2026——Gas, Water/Sanitary
12/16/2024——Storm, Water/Sanitary
1 job · most recent 12/16/2024
Steel Concrete
FiledStatusContractorScope
12/16/2024——Steel, Concrete
Building Lifecycle
All (170)Filed (7)Violation (59)Objection (74)Special Inspection (30)
06/09/2026
Filed — Alteration
Filing to address conditions related to Vacate Order VAC B71/25 and associated violations at the basement level, including removal of non-bearing walls, unauthorized stove, and bathtub. Plumbing work filed separately under B01411269-S1.
B01411269-S1
06/08/2026
Filed — Alteration
Filing to address conditions related to Vacate Order VAC B71/25 and associated violations at the basement level, including removal of non-bearing walls, unauthorized stove, and bathtub. Plumbing work filed separately under B01411269-S1.
B01411269-I1
06/08/2026
Special inspection requirement — Final
06/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/05/2026
Objection raised — Scope
05/05/2026
Objection raised — Scope
05/05/2026
Objection raised — Scope
05/05/2026
Objection raised — Scope
04/16/2026
Objection resolved — Addressed
03/02/2026
Objection resolved — Addressed
02/25/2026
Objection resolved — Addressed
01/22/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
12/30/2025
Objection raised — Fire_Protection
12/30/2025
Objection raised — Accessibility
12/15/2025
Objection resolved — Addressed
12/15/2025
Objection resolved — Addressed
05/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
05/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
05/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
05/28/2025
Special inspection requirement — Maintenance information
05/23/2025
Objection raised — Scope
05/20/2025
Objection resolved — Addressed
05/05/2025
Objection resolved — Addressed
03/19/2025
Violation issued (ECB, open)
Construction
02/17/2025
Objection resolved — Addressed
02/12/2025
Violation issued (ECB, open)
Construction
02/12/2025
Violation issued (ECB, open)
Construction
02/12/2025
Violation issued (ECB, open)
Construction
02/12/2025
Violation issued (ECB, open)
Construction
01/15/2025
Objection resolved — Addressed
01/15/2025
Objection resolved — Addressed
12/20/2024
Objection raised — Other
12/16/2024
Filed — New Building
PROPOSED NEW 6-STORY BUILDING
B00885987-S4
12/16/2024
Objection raised — Fire_Protection
12/16/2024
Objection raised — Zoning
12/16/2024
Objection resolved — Addressed
12/16/2024
Objection resolved — Addressed
12/16/2024
Objection resolved — Addressed
12/16/2024
Objection resolved — Addressed
12/16/2024
Objection resolved — Addressed
12/16/2024
Objection resolved — Addressed
12/02/2024
Objection raised — Zoning
12/02/2024
Objection raised — Zoning
11/24/2024
Objection resolved — Addressed
11/20/2024
Objection resolved — Addressed
11/20/2024
Objection resolved — Addressed
11/20/2024
Objection resolved — Addressed
11/20/2024
Objection resolved — Addressed
11/20/2024
Objection resolved — Addressed
11/13/2024
Objection resolved — Addressed
07/01/2024
Objection resolved — Addressed
07/01/2024
Objection resolved — Addressed
07/01/2024
Objection resolved — Addressed
07/01/2024
Objection resolved — Addressed
07/01/2024
Objection resolved — Addressed
07/01/2024
Objection resolved — Addressed
07/01/2024
Objection resolved — Addressed
07/01/2024
Objection resolved — Addressed
07/01/2024
Objection resolved — Addressed
Latest 60 of 170 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARBOR 2 LLC603/22/2026
NY REAL ESTATE PARTNERS503/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/30/2022$2.5M—93 MCGUINNESS MULTIFAMILY OWNER LLC → ARBOR2 LLC$849/sf building
03/15/2021$1.5M—93 MCGUINNESS, LLC → 93 MCGUINNESS MULTIFAMILY OWNER LLC$527/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AG ENGINEERING PLLC206/09/2026
EDG212/16/2024
L. NAOUM, P.E., P. C.311/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NH EXPEDITING AND CONSULTING LLC1003/21/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
06/08/2026Final—progress
06/08/2026Fire-Resistant Penetrations and Joints—special
05/28/2025HVAC-R and service water piping design and insulation—energy_progress
05/28/2025HVAC-R and service water heating system controls—energy_progress
05/28/2025HVAC-R and service water heating equipment—energy_progress
05/28/2025Maintenance information—energy_progress
11/13/2023Fire-Resistant Penetrations and Joints—special
09/22/2023Insulation placement and R values—energy_progress
09/22/2023Fenestration areas—energy_progress
09/22/2023Air barrier — testing —energy_progress
09/22/2023Fenestration air leakage—energy_progress
09/22/2023Air barrier - visual inspection—energy_progress
09/22/2023Interior lighting power—energy_progress
09/22/2023Lighting in dwelling units—energy_progress
09/22/2023Lighting controls—energy_progress
09/22/2023Metering—energy_progress
09/22/2023Fenestration and door U-factor and product ratings—energy_progress
09/22/2023Protection of exposed foundation insulation—energy_progress
09/22/2023Energy Code Compliance Inspections—progress
09/22/2023Fire-Resistance Rated Construction—progress
09/22/2023Preliminary—progress
06/08/2023Sprinkler Systems—special
06/06/2023Shutoff dampers—energy_progress
06/06/2023HVAC-R and service water heating system controls—energy_progress
06/06/2023HVAC-R and service water heating equipment—energy_progress
Latest 25 of 31.
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026B00885987-S3Request digital key ↗
08/23/2026B00885987-S1Request digital key ↗
08/23/2026B00885987-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00885987-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B00885987-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026B00885987-S3Open ↗
08/23/2026B00885987-S2Open ↗
08/23/2026B00885987-S1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/23/2026B00885987-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWOER: Notice to Proceed2
08/13/2026B00885987-S1Open ↗
08/13/2026B00885987-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026B01411269-I1Open ↗
08/16/2026B01411269-S1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/23/2026B00885987-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00885987-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B00885987-I1Open ↗