One story retail building
930 HYLAN BOULEVARD
STATEN ISLAND · BIN 5047953
💬 Discuss this project
1976Year Built
1Stories
K1Building Class
R3-2Zoning
1,032 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
One story retail building · 1,350 sf lot · 0.76 FAR built · Flood zone X
Locations of Work
Architecture
Floor 13p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JUNG H. CHOI ARCHITECT, P.C.407/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MODERN BUILDING CONSULTANT803/21/2026
J&J CONSTRUCTION SOLUTION INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JZ CONSTRUCTION GROUP INCGeneral Contractor903/21/2026
KLE CONSTRUCTION INCGeneral Contractor303/21/2026
KJK ELECTRIC INCElectrical103/22/2026
YILIN CONSTRUCTION INCGeneral Contractor107/08/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HALO ARCHITECTURE PLLC8021405/16/2024
MSM ENGINEERING SERVICES,8449402/06/2024
FLUSHING ENGINEERING SERV4373107/15/2020
Building Lifecycle
All (70)Filed (10)Permit Issued (6)Signed Off (5)Violation (1)Inspection (8)Objection (10)Special Inspection (30)
04/13/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/28/2025
Signed off — Alteration
Proposed commercial interior renovation on 1st floor of Eating & Drinking Establishment with minor partitions work and floor finishes in conjunction with DOB NOW #S00876877 as per plan. No change in use, egress, or occupancy under this application.
S00874624-S1
12/30/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
11/20/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
10/03/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
05/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hanli Liu
05/21/2024
Special inspection requirement — Lighting controls
Hanli Liu
05/21/2024
Special inspection requirement — Interior lighting power
Hanli Liu
05/21/2024
Special inspection requirement — Fire-Resistance Rated Construction
Hanli Liu
05/21/2024
Special inspection requirement — Energy Code Compliance Inspections
Hanli Liu
05/16/2024
Filed — Alteration CO
To add use description of eating and drinking establishment (6A) at 1st floor with minor renovation as per plans submitted herewith. Obtain new C of O.
S00876877-P1
05/16/2024
Special inspection requirement — Lighting controls
Hanli Liu
05/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hanli Liu
05/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Hanli Liu
05/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
Hanli Liu
05/16/2024
Special inspection requirement — Interior lighting power
Hanli Liu
02/26/2024
Special inspection requirement — Duct leakage testing, insulation and design
MOHAMED MAHMOUD
02/26/2024
Special inspection requirement — Ventilation and air distribution system
MOHAMED MAHMOUD
02/26/2024
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
02/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
02/26/2024
Special inspection requirement — Mechanical Systems
MOHAMED MAHMOUD
02/26/2024
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
02/26/2024
Special inspection requirement — Final
MOHAMED MAHMOUD
02/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
02/06/2024
Filed — Alteration
Proposed commercial interior renovation on 1st floor of Eating & Drinking Establishment with minor partitions work and floor finishes in conjunction with DOB NOW #S00876877 as per plan. No change in use, egress, or occupancy under this application.
S00874624-P2
02/06/2024
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
02/06/2024
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
02/06/2024
Special inspection requirement — Duct leakage testing, insulation and design
MOHAMED MAHMOUD
02/06/2024
Special inspection requirement — Ventilation and air distribution system
MOHAMED MAHMOUD
02/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
02/06/2024
Special inspection requirement — Mechanical Systems
MOHAMED MAHMOUD
02/06/2024
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
02/06/2024
Special inspection requirement — Final
MOHAMED MAHMOUD
02/02/2024
Signed off — Alteration
Plumbing work filed in conjunction with the Eating and Drinking establishment space. No change in use, egress, or occupancy under this application.
S00875381-I1
01/25/2024
Signed off — Alteration
Proposed commercial interior renovation on 1st floor of Eating & Drinking Establishment with minor partitions work and floor finishes in conjunction with DOB NOW #S00876877 as per plan. No change in use, egress, or occupancy under this application.
S00874624-I1
01/23/2024
Filed — Alteration
Proposed commercial interior renovation on 1st floor of Eating & Drinking Establishment with minor partitions work and floor finishes in conjunction with DOB NOW #S00876877 as per plan. No change in use, egress, or occupancy under this application.
S00874624-P1
01/23/2024
Special inspection requirement — Final
MOHAMED MAHMOUD
01/23/2024
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
01/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
01/23/2024
Special inspection requirement — Interior lighting power
MOHAMED MAHMOUD
01/17/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/15/2023
Signed off — Alteration
INSTALLATION OF A NEW AWNING READING " Ran Viet" ON THE EXISTING BUILDING AS PER PLAN HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00969033-I1
12/01/2023
Permit issued — General Construction
S00969033-I1-GC
11/29/2023
Filed — Alteration
INSTALLATION OF A NEW AWNING READING " Ran Viet" ON THE EXISTING BUILDING AS PER PLAN HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00969033-I1
11/07/2023
Filed — Alteration
Plumbing work filed in conjunction with the Eating and Drinking establishment space. No change in use, egress, or occupancy under this application.
S00875381-P1
10/02/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/23/2023
Permit issued — Mechanical Systems
S00874624-S1-MS
08/18/2023
Filed — Alteration
Proposed commercial interior renovation on 1st floor of Eating & Drinking Establishment with minor partitions work and floor finishes in conjunction with DOB NOW #S00876877 as per plan. No change in use, egress, or occupancy under this application.
S00874624-S1
08/16/2023
Permit issued — General Construction
S00876877-I1-GC
08/07/2023
Objection resolved — Addressed
07/26/2023
Objection resolved — Addressed
06/30/2023
Objection resolved — Addressed
06/30/2023
Objection resolved — Addressed
06/30/2023
Objection resolved — Addressed
06/26/2023
Objection raised — Other
06/26/2023
Objection raised — Other
06/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/16/2023
Objection raised — Zoning
06/16/2023
Objection raised — Other
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC12/01/2023
DOB NOWMechanical SystemsSigned-offJZ CONSTRUCTION GROUP INC08/23/2023
DOB NOWGeneral ConstructionPermit IssuedJZ CONSTRUCTION GROUP INC08/16/2023
DOB NOWGeneral ConstructionSigned-offJZ CONSTRUCTION GROUP INC05/25/2023
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC05/24/2023
DOB NOWMechanical SystemsSigned-offYILIN CONSTRUCTION INC07/17/2020
BISOTISSUEDINTEGRITY UV168 INC08/04/2015
BISOTISSUEDRELIABLE CONTRACTING LLC07/20/2005
1 project · most recent 08/08/2023
General Wiring
FiledStatusContractorScope
08/08/2023CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/13/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
12/30/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
11/20/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
10/03/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
01/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/22/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
05/21/2024Fire-Resistant Penetrations and JointsHanli Liuspecial
05/21/2024Lighting controlsHanli Liuenergy_progress
05/21/2024Interior lighting powerHanli Liuenergy_progress
05/21/2024Fire-Resistance Rated ConstructionHanli Liuprogress
05/21/2024Energy Code Compliance InspectionsHanli Liuprogress
05/16/2024Lighting controlsHanli Liuenergy_progress
05/16/2024Fire-Resistant Penetrations and JointsHanli Liuspecial
05/16/2024Energy Code Compliance InspectionsHanli Liuprogress
05/16/2024Fire-Resistance Rated ConstructionHanli Liuprogress
05/16/2024Interior lighting powerHanli Liuenergy_progress
02/26/2024Duct leakage testing, insulation and designMOHAMED MAHMOUDenergy_progress
02/26/2024Ventilation and air distribution systemMOHAMED MAHMOUDenergy_progress
02/26/2024Maintenance informationMOHAMED MAHMOUDenergy_progress
02/26/2024Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
02/26/2024Mechanical SystemsMOHAMED MAHMOUDspecial
02/26/2024Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
02/26/2024FinalMOHAMED MAHMOUDprogress
02/26/2024Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
02/06/2024Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
02/06/2024Maintenance informationMOHAMED MAHMOUDenergy_progress
02/06/2024Duct leakage testing, insulation and designMOHAMED MAHMOUDenergy_progress
02/06/2024Ventilation and air distribution systemMOHAMED MAHMOUDenergy_progress
02/06/2024Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
02/06/2024Mechanical SystemsMOHAMED MAHMOUDspecial
02/06/2024Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
Latest 25 of 37.
▾Documents — 83 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
08/23/2026S00875381-I1Request digital key ↗
08/23/2026S00875381-P1Request digital key ↗
08/23/2026S00874624-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026S00371056-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
02/28/2025500787213Open ↗
08/07/2015520246975Open ↗
▸BISWORK PERMIT APPLICATION1
08/07/2015520246975Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00876877-I1Open ↗
▸Seals & Professional Certifications46
▸DOB NOWProgress Inspector Seal & Signature22
09/14/2026S00874624-P1Open ↗
09/14/2026S00874624-P1Open ↗
09/14/2026S00874624-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/14/2026S00874624-P1Open ↗
09/02/2026S00371056-I1Open ↗
08/31/2026S00876877-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/22/2026S00969033-I1Open ↗
08/21/2026S00876877-I1Open ↗
08/21/2026S00876877-P1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
11/16/2015520246975Open ↗
08/07/2015520246975Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/07/2015520246975Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/07/2015520246975Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026S00876877-P1Open ↗
08/13/2026S00876877-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00876877-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/21/2026S00876877-I1Open ↗
08/21/2026S00876877-P1Open ↗
08/13/2026S00874624-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/07/2015520246975Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/16/2015520246975Open ↗
08/07/2015520246975Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/16/2015520246975Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/16/2015520246975Open ↗
11/06/2015520246975Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/07/2015520246975Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/16/2015520246975Open ↗
08/07/2015520246975Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/07/2015520246975Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/16/2015520246975Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00876877-I1Open ↗