← Back
Over six families without stores
931 AVENUE ST JOHN
BRONX · BIN 2005123
💬 Discuss this project
1910Year Built
4Stories
C1Building Class
R7-1Zoning
7,296 sfGross Floor Area
8Units
Rent Stabilized26 Open Violations ▸
Over six families without stores · Owner of record: 331 EAST 146TH STREET HDFC · 3,500 sf lot · 2.08 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GSR CONTRACTOR INC.503/22/2026
HNJ CONTRACTING INC503/22/2026
TRIBECA CONSTRUCTION GROUP INC503/22/2026
YOUGIE IRON WORKS INC503/22/2026
331 EAST 146TH STREET HDFC703/22/2026
DOUGERT MANAGEMENT103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SR ENGINEERING PC110/08/2024
ASR ENGINEERING PC205/17/2024
MJE PROFESSIONAL SERVICES102/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ABC PERMIT EXPEDITING203/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GSR CONTRACTOR INCGeneral Contractor303/21/2026
HNJ CONTRACTING INCGeneral Contractor303/21/2026
TRIBECA CONSTRUCTION GROUPGeneral Contractor303/21/2026
YOUGIE IRON WORKS INCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BANGASH ASSOCIATES INC8488110/08/2024
SYED ENGINEERING, P.C.7054105/09/2024
Building Lifecycle
All (76)Filed (4)Permit Issued (4)Signed Off (1)Violation (60)Special Inspection (7)
03/01/2026
Violation issued (HPD, closed)
A
03/01/2026
Violation issued (HPD, closed)
C
03/01/2026
Violation issued (HPD, closed)
A
03/01/2026
Violation issued (HPD, closed)
C
03/01/2026
Violation issued (HPD, closed)
C
02/26/2026
Violation issued (ECB, open)
Construction
02/26/2026
Violation issued (ECB, open)
Construction
02/26/2026
Violation issued (ECB, open)
Construction
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/07/2025
Violation issued (HPD, closed)
C
12/30/2024
Violation issued (HPD, closed)
A
12/30/2024
Violation issued (HPD, closed)
B
12/30/2024
Violation issued (HPD, closed)
B
12/30/2024
Violation issued (HPD, closed)
A
12/30/2024
Violation issued (HPD, closed)
C
11/26/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/12/2024
Signed off — Alteration
MINOR FACADE REPAIRS, INCLUDES REPLACEMENT OF CRACKED MASONRY AND SPOT RE-POINTING.
X01121267-I1
11/01/2024
Violation issued (HPD, closed)
B
11/01/2024
Violation issued (HPD, closed)
C
11/01/2024
Violation issued (HPD, closed)
B
11/01/2024
Violation issued (HPD, closed)
B
11/01/2024
Violation issued (HPD, closed)
A
11/01/2024
Violation issued (HPD, closed)
B
11/01/2024
Violation issued (HPD, closed)
C
11/01/2024
Violation issued (HPD, closed)
B
11/01/2024
Violation issued (HPD, closed)
B
10/21/2024
Permit issued — General Construction
X01121267-I1-GC
10/15/2024
Violation issued (HPD, closed)
A
10/15/2024
Violation issued (HPD, closed)
B
10/15/2024
Violation issued (HPD, closed)
A
10/08/2024
Filed — Alteration
MINOR FACADE REPAIRS, INCLUDES REPLACEMENT OF CRACKED MASONRY AND SPOT RE-POINTING.
X01121267-I1
10/02/2024
Special inspection requirement — Masonry
FAZAL BANGASH
10/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAZAL BANGASH
10/02/2024
Special inspection requirement — Tenant Protection Plan Compliance
FAZAL BANGASH
10/02/2024
Special inspection requirement — Final
SANDY RAMPAUL
09/25/2024
Violation issued (HPD, closed)
A
09/25/2024
Violation issued (HPD, closed)
B
09/25/2024
Violation issued (HPD, closed)
A
09/25/2024
Violation issued (HPD, closed)
A
09/25/2024
Violation issued (HPD, closed)
A
09/25/2024
Violation issued (HPD, closed)
A
09/25/2024
Violation issued (HPD, closed)
B
09/24/2024
Violation issued (HPD, closed)
B
09/24/2024
Violation issued (HPD, closed)
C
09/24/2024
Violation issued (HPD, closed)
C
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (ECB, open)
Construction
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/17/2024
Filed — Alteration
X01049860-I1
05/17/2024
Permit issued — Supported Scaffold
X01049860-I1-SF
05/14/2024
Permit issued — General Construction
X01048572-I1-GC
05/09/2024
Filed — Alteration
X01048572-I1
05/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
RAFI HAMID
05/09/2024
Special inspection requirement — Masonry
RAFI HAMID
05/09/2024
Special inspection requirement — Final
RAFI HAMID
05/08/2024
Violation issued (HPD, closed)
C
04/02/2024
Violation issued (HPD, closed)
A
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offYOUGIE IRON WORKS INC10/21/2024
DOB NOWSupported ScaffoldPermit IssuedGSR CONTRACTOR INC05/17/2024
DOB NOWGeneral ConstructionPermit IssuedHNJ CONTRACTING INC05/14/2024
DOB NOWSidewalk ShedPermit IssuedTRIBECA CONSTRUCTION GROU02/29/2024
BISPLISSUEDGW MECHANICAL CORP06/29/1993
BIS—ISSUEDG.C. TECHNICAL CONSULTING INC03/09/1993
BISPLISSUEDGW MECHANICAL CORP12/18/1992
BISEQRE-ISSUEDCOLGATE SCAFFOLDING12/04/1992
BIS—ISSUEDG.C. TECHNICAL CONSULTING INC08/13/1992
BISEQISSUEDG.C. TECHNICAL CONSULTING INC08/13/1992
1 project · most recent 03/01/2024
FiledStatusContractorScope
03/01/2024Permit IssuedRICHARD NEU—
1 project · most recent 02/29/2024
Sidewalk Shed
FiledStatusContractorScope
02/29/2024Permit IssuedTRIBECA CONSTRUCTION GROUSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/02/2024MasonryFAZAL BANGASHspecial
10/02/2024Structural Stability – Alterations of existing buildingsFAZAL BANGASHspecial
10/02/2024Tenant Protection Plan ComplianceFAZAL BANGASHspecial
10/02/2024FinalSANDY RAMPAULprogress
05/09/2024Tenant Protection Plan ComplianceRAFI HAMIDspecial
05/09/2024MasonryRAFI HAMIDspecial
05/09/2024FinalRAFI HAMIDprogress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026X01012068-I1Request digital key ↗
08/21/2026X01048572-I1Request digital key ↗
08/21/2026X01049860-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026X01012068-I1Open ↗
08/13/2026X01048572-I1Open ↗
08/13/2026X01049860-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026X01048572-I1Open ↗
09/01/2026X01048572-I1Open ↗
08/23/2026X01121267-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026X01048572-I1Open ↗
08/23/2026X01121267-I1Open ↗