931 NEW YORK AVENUE
BROOKLYN · East Flatbush-Erasmus · BIN 3109420
💬 Discuss this project
1910Year Built
4Stories
C1Building Class
R6Zoning
7,825 sfGross Floor Area
12Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 931 NEW YORK AVE LLC · 3,450 sf lot · 2.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Roof17p · 2 filings · 20 docs
Floor 438p · 2 filings · 20 docs
Floor 339p · 2 filings · 20 docs
Floor 240p · 2 filings · 20 docs
Floor 152p · 2 filings · 20 docs
Mezzanine40p · 2 filings · 20 docs
Cellar45p · 2 filings · 20 docs
Site & exterior61p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARSONS CONSTRUCTION903/22/2026
95TH ST HOLDINGS203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/21/2022$995K—Private party → 931 NEW YORK AVE LLC$127/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RED BRICK PROPERTY MNGMTGeneral Contractor2207/08/2026
MCKENNEY CONSTRUCTION LLCGeneral Contractor303/21/2026
PARSONS CONSTRUCTION INCGeneral Contractor303/21/2026
FOSTER ELEC'L SVC., INC.Electrical103/22/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
MPI PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616606/25/2024
Building Lifecycle
All (111)Filed (12)Permit Issued (12)Signed Off (8)Violation (40)Inspection (5)Objection (4)Special Inspection (30)
08/15/2024
Signed off — Alteration
INSTALLATION OF A TEMPORARY WOODEN CONSTRUTION FENCE
B00744018-S1
07/23/2024
Signed off — Alteration
INSTALLATION OF A TEMPORARY WOODEN CONSTRUTION FENCE
B00744018-S5
07/22/2024
Permit issued — Support of Excavation
B00744018-S5-SE
07/11/2024
Signed off — Alteration
INSTALLATION OF A TEMPORARY WOODEN CONSTRUTION FENCE
B00744018-I1
07/09/2024
Signed off — Alteration
INSTALLATION OF A TEMPORARY WOODEN CONSTRUTION FENCE
B00744018-S7
07/05/2024
Signed off — Alteration
PLUMBING AND SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH ALT 1 APPLICATION #321598357 (Please assign to HUB plan examiner NAZMUL RUMY as he is the lead plan examiner of the alt 1 #321598357 )
B00819231-I1
06/27/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/25/2024
Filed — Alteration
INSTALLATION OF A TEMPORARY WOODEN CONSTRUTION FENCE
B00744018-P2
06/25/2024
Signed off — Alteration
INSTALLATION OF A TEMPORARY WOODEN CONSTRUTION FENCE
B00744018-S4
06/25/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/19/2024
Signed off — Alteration
INSTALLATION OF A TEMPORARY WOODEN CONSTRUTION FENCE
B00744018-S3
06/14/2024
Violation issued (ECB, closed)
Construction
06/12/2024
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
B00933006-I1
05/29/2024
Permit issued — Mechanical Systems
B00744018-S1-MS
03/28/2024
Violation issued (ECB, closed)
Unknown
03/28/2024
Violation issued (ECB, closed)
Construction
03/28/2024
Violation issued (ECB, closed)
Unknown
03/28/2024
Violation issued (ECB, closed)
Construction
03/19/2024
Permit issued — Supported Scaffold
B00744018-S7-SF
03/06/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
03/05/2024
Objection resolved — Addressed
02/28/2024
Objection raised — Structural
02/26/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/22/2024
Objection resolved — Addressed
02/05/2024
Objection raised — Other
01/25/2024
Filed — Alteration
INSTALLATION OF A TEMPORARY WOODEN CONSTRUTION FENCE
B00744018-S7
01/16/2024
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
B00933006-P2
01/04/2024
Permit issued — Construction Fence
B00744018-S3-FN
01/04/2024
Violation issued (ECB, closed)
Unknown
01/04/2024
Violation issued (ECB, closed)
Unknown
01/03/2024
Violation issued (ECB, closed)
Construction
12/13/2023
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
B00933006-P1
11/30/2023
Violation issued (ECB, closed)
Unknown
11/28/2023
Violation issued (HPD, closed)
I
11/09/2023
Permit issued — Sprinklers
B00819231-I1-EW-SP
11/09/2023
Violation issued (ECB, closed)
Construction
09/20/2023
Permit issued — Sidewalk Shed
B00933006-I1-SH
09/19/2023
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
B00933006-I1
09/11/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
09/05/2023
Permit issued — Sprinklers
B00819231-I1-PL
07/24/2023
Permit issued — Foundation
B00744018-S4-GC-CX
07/14/2023
Special inspection requirement — Structural Steel - Welding
FAHAD FATEH
07/14/2023
Special inspection requirement — Subgrade Inspections
FAHAD FATEH
07/14/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
FAHAD FATEH
07/14/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
FAHAD FATEH
07/14/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
07/14/2023
Special inspection requirement — Masonry
FAHAD FATEH
07/14/2023
Special inspection requirement — Structural Cold-Formed Steel
FAHAD FATEH
07/14/2023
Special inspection requirement — Structural Steel - Details
FAHAD FATEH
07/14/2023
Special inspection requirement — Structural Steel - High Strength Bolting
FAHAD FATEH
07/14/2023
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
07/14/2023
Special inspection requirement — Final
FAHAD FATEH
07/14/2023
Special inspection requirement — Footing and Foundation
FAHAD FATEH
07/13/2023
Filed — Alteration
INSTALLATION OF A TEMPORARY WOODEN CONSTRUTION FENCE
B00744018-P1
07/11/2023
Special inspection requirement — Footing and Foundation
07/11/2023
Special inspection requirement — Structural Cold-Formed Steel
07/11/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/11/2023
Special inspection requirement — Structural Steel - Details
07/11/2023
Special inspection requirement — Structural Steel - High Strength Bolting
07/11/2023
Special inspection requirement — Structural Steel - Welding
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationSigned-offMCKENNEY CONSTRUCTION LLC07/22/2024
DOB NOWMechanical SystemsSigned-offRED BRICK PROPERTY MNGMT05/29/2024
DOB NOWSupported ScaffoldSigned-offRED BRICK PROPERTY MNGMT03/19/2024
DOB NOWConstruction FenceSigned-offRED BRICK PROPERTY MNGMT01/04/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC11/09/2023
DOB NOWSidewalk ShedSigned-offPARSONS CONSTRUCTION INC09/20/2023
DOB NOWSprinklersSigned-offYG SERVICES INC09/05/2023
DOB NOWFoundationSigned-offRED BRICK PROPERTY MNGMT07/24/2023
DOB NOWFoundationSigned-offRED BRICK PROPERTY MNGMT05/04/2023
DOB NOWConstruction FenceSigned-offRED BRICK PROPERTY MNGMT12/14/2022
DOB NOWFoundationSigned-offRED BRICK PROPERTY MNGMT11/10/2022
DOB NOWEarth WorkSigned-offRED BRICK PROPERTY MNGMT05/28/2022
BIS—ISSUEDMCKENNEY CONSTRUCTION LLC06/04/2024
BIS—ISSUEDRED BRICK PROPERTY MNGMT11/13/2023
2 projects · most recent 04/02/2024
General Wiring
FiledStatusContractorScope
04/02/2024CompleteFOSTER ELEC'L SVC., INC.General Wiring
09/18/2023CompleteHIGH QUALITY ELECTRIC OF—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/27/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/25/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/06/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
02/26/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/11/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
07/14/2023Structural Steel - WeldingFAHAD FATEHspecial
07/14/2023Subgrade InspectionsFAHAD FATEHspecial
07/14/2023Excavations - Sheeting, Shoring, and BracingFAHAD FATEHspecial
07/14/2023Construction Operations Influencing Adjacent StructuresFAHAD FATEHspecial
07/14/2023Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
07/14/2023MasonryFAHAD FATEHspecial
07/14/2023Structural Cold-Formed SteelFAHAD FATEHspecial
07/14/2023Structural Steel - DetailsFAHAD FATEHspecial
07/14/2023Structural Steel - High Strength BoltingFAHAD FATEHspecial
07/14/2023Concrete - Cast-In-PlaceFAHAD FATEHspecial
07/14/2023FinalFAHAD FATEHprogress
07/14/2023Footing and FoundationFAHAD FATEHprogress
07/11/2023Footing and Foundation—progress
07/11/2023Structural Cold-Formed Steel—special
07/11/2023Structural Stability – Alterations of existing buildings—special
07/11/2023Structural Steel - Details—special
07/11/2023Structural Steel - High Strength Bolting—special
07/11/2023Structural Steel - Welding—special
07/11/2023Subgrade Inspections—special
07/11/2023Final—progress
07/11/2023Concrete - Cast-In-Place—special
07/11/2023Construction Operations Influencing Adjacent Structures—special
07/11/2023Excavations - Sheeting, Shoring, and Bracing—special
07/11/2023Masonry—special
01/26/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
Latest 25 of 31.
▾Documents — 109 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/29/2026B00744018-P1Request digital key ↗
08/29/2026B00744018-S5Request digital key ↗
08/29/2026B00744018-S4Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION7
12/20/2024321598357Open ↗
10/18/2023321598357Open ↗
07/21/2023321598357Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION5
06/05/2024321598357Open ↗
06/03/2024321598357Open ↗
11/21/2023321598357Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/29/2024321598357Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISVERIFY TAX LOT2
02/24/2025321598357Open ↗
06/05/2024321598357Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/23/2024321598357Open ↗
▸BISZONING DIAGRAM1
01/31/2023321598357Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/29/2026B00744018-S1Open ↗
08/29/2026B00744018-S4Open ↗
08/27/2026B00819231-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B00819231-I1Open ↗
09/01/2026B00819231-I1Open ↗
09/01/2026B00819231-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B00819231-I1Open ↗
09/01/2026B00819231-I1Open ↗
09/01/2026B00819231-I1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment5
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
08/23/2024321598357Open ↗
▸BISSPRINKLER SYSTEMS1
11/14/2023321598357Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/27/2024321598357Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
08/23/2024321598357Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
06/20/2024321598357Open ↗
▸Safety & Tenant Protection3
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
11/14/2023321598357Open ↗
▸BISSTREET TREE CHECKLIST1
11/30/2020321598357Open ↗
▸BISSTREET TREE SIGNOFF1
07/29/2025321598357Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/27/2026B00819231-I1Open ↗
08/13/2026B00744018-S4Open ↗
08/13/2026B00744018-S5Open ↗
▸Energy Compliance7
▸BISINTERIOR LIGHTING POWER1
07/30/2024321598357Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/30/2024321598357Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/14/2023321598357Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/30/2024321598357Open ↗
▸BISLIGHTING IN DWELLING UNITS1
07/30/2024321598357Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/30/2024321598357Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/30/2024321598357Open ↗
▸Inspections & Test Reports10
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/30/2024321598357Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/30/2024321598357Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
07/30/2024321598357Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/14/2023321598357Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
07/30/2024321598357Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
08/08/2024321598357Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/08/2024321598357Open ↗
▸BISMECHANICAL SYSTEMS1
07/30/2024321598357Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00744018-S5Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00744018-S5Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/05/2024321598357Open ↗
06/03/2024321598357Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
06/24/2022321598357Open ↗
▸BISHOUSE CONNECTION SIGNOFF1
05/08/2024321598357Open ↗
▸Cost, Insurance & Ownership13
▸BISPROJECT-SPECIFIC GL INSURANCE4
06/05/2024321598357Open ↗
06/03/2024321598357Open ↗
11/21/2023321598357Open ↗
Showing 3 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
06/05/2024321598357Open ↗
06/03/2024321598357Open ↗
11/21/2023321598357Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
02/24/2025321598357Open ↗
06/06/2024321598357Open ↗
▸BISCOST AFFIDAVIT1
12/27/2024321598357Open ↗
▸BISINSURANCE: LIABILITY1
11/14/2023321598357Open ↗
▸BISINSURANCE: WORKERS' COMPENSATION1
11/14/2023321598357Open ↗
▸BISINSURANCE: DISABILITY1
11/14/2023321598357Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
02/21/2025321598357Open ↗
08/08/2024321598357Open ↗
12/30/2020321598357Open ↗
▸BISEFILING COVER SHEET1
10/05/2020321598357Open ↗
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
06/05/2024321598357Open ↗
06/03/2024321598357Open ↗
11/21/2023321598357Open ↗
▸DOB NOWAdjoining Owners Notification3
08/13/2026B00744018-I1Open ↗
08/13/2026B00744018-S4Open ↗
08/13/2026B00744018-S5Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
11/30/2020321598357Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
07/30/2024321598357Open ↗
▸BISPLOT DIAGRAM1
12/30/2020321598357Open ↗