← Back
Predominantly retail with other uses
932 NEW YORK AVENUE
BROOKLYN · BIN 3109332
💬 Discuss this project
1931Year Built
3Stories
K4Building Class
R6Zoning
3,915 sfGross Floor Area
5Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: 3202 CHURCH LLC. · 2,666 sf lot · 1.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction28p · 1 filing · 20 docs
Floor 4Under Construction26p · 1 filing · 20 docs
Floor 3Under Construction27p · 1 filing · 20 docs
Floor 2Under Construction27p · 1 filing · 20 docs
Floor 1Under Construction26p · 1 filing · 20 docs
MezzanineUnder Construction27p · 1 filing · 20 docs
CellarUnder Construction29p · 1 filing · 20 docs
1 job · most recent 01/06/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/06/2026Permit IssuedPURCISIVE INCHeating and Air Conditioning Systems
Heat / Cool
Daikin AOUH24WKAS3 27,000 BTU · Heat Pump Outdoor ×7
AOUH12LMAS1 37,000 BTU · Heat Pump Outdoor ×3
1 job · most recent 01/06/2026
Sprinkler System
FiledStatusContractorScope
01/06/2026Signed-offTARGET PIPING NY LLCSprinkler System
1 job · most recent 01/06/2026
Storm Water/Sanitary
FiledStatusContractorScope
01/06/2026Signed-offTARGET PIPING NY LLCStorm, Water/Sanitary
2 jobs · most recent 11/24/2025
General Wiring
FiledStatusContractorScope
11/24/2025CompleteFIRST QUALITY ELECL LLCGeneral Wiring
05/28/2025CompleteHIGH QUALITY ELEC.OF NYC—
1 job · most recent 01/06/2026
Steel Masonry
FiledStatusContractorScope
01/06/2026Permit IssuedPURCISIVE INCSteel, Masonry
1 job · most recent 01/06/2026
Fence Scaffold
FiledStatusContractorScope
01/06/2026Permit IssuedPURCISIVE INCFence, Scaffold
Building Lifecycle
All (173)Filed (16)Permit Issued (13)Signed Off (10)Violation (10)Inspection (15)Objection (80)Special Inspection (29)
02/06/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120689-I1
B01120689-I1
02/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
02/03/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
02/03/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
02/03/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
02/03/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
02/03/2026
Special inspection requirement — Metering
FAHAD FATEH
02/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/03/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
02/03/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
02/03/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
02/03/2026
Special inspection requirement — Permanent certificate
FAHAD FATEH
01/21/2026
Objection raised — Scope
01/21/2026
Objection resolved — Addressed
01/06/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120689-I1
B01120689-P9
12/24/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120689-I1
B01120689-S2
12/24/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120689-I1
B01120689-S3
12/17/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120689-I1
B01120689-S1
12/15/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
12/12/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
12/09/2025
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. No change in use, egress and/or occupancy with this application.
B01227479-I1
12/09/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120689-I1
B01120689-S8
12/02/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/02/2025
Objection resolved — Addressed
12/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/01/2025
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
12/01/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
11/26/2025
Objection resolved — Addressed
11/24/2025
Objection raised — Other
11/20/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120689-I1
B01120689-P8
11/19/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/18/2025
Objection resolved — Addressed
11/18/2025
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
11/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/18/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
11/17/2025
Objection raised — Inspections
11/17/2025
Objection raised — Other
11/14/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/13/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120689-I1
B01120689-S4
11/12/2025
Inspection — Fail-Final SP - Up to 9 Requested Floors
Fail
View inspection ↗
11/10/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/03/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120689-I1
B01120689-P6
10/31/2025
Permit issued — General Construction
B01120689-I1-GC
10/30/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/17/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120689-I1
B01120689-P4
09/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/15/2025
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
09/15/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
08/25/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120689-I1
B01120689-S6
08/21/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120689-I1
B01120689-S5
08/13/2025
Violation issued (ECB, closed)
Construction
08/13/2025
Violation issued (ECB, closed)
Construction
08/13/2025
Violation issued (ECB, closed)
Unknown
08/13/2025
Violation issued (ECB, closed)
Unknown
08/13/2025
Violation issued (ECB, closed)
Unknown
08/06/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120689-I1
B01120689-S7
08/06/2025
Objection resolved — Addressed
07/30/2025
Objection raised — Scope
Latest 60 of 173 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PURCISIVE1003/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIKOLAI KATZ ARCHITECT501/06/2026
CHOSEN MEP, CORP.611/20/2025
KNF SERVICES CROP107/09/2025
BRIAN GOLDMAN, ARCHITECT105/16/2025
KCE CONSULTING ENGINEERING PLLC312/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC3003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PURCISIVE INCGeneral Contractor707/08/2026
N TECH DESIGN OF AMERICAGeneral Contractor307/08/2026
FIRST QUALITY ELECL LLCElectrical103/22/2026
TARGET PIPING NY LLCFire Protection107/08/2026
APEX GROUP NY CORPGeneral Contractor104/09/2026
B&B MECH PLBG & HTG LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161201/06/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPURCISIVE INC10/31/2025
DOB NOWSupported ScaffoldSigned-offPURCISIVE INC07/17/2025
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC06/23/2025
DOB NOWSidewalk ShedSigned-offAPEX GROUP NY CORP05/20/2025
DOB NOWFoundationSigned-offPURCISIVE INC04/11/2025
DOB NOWMechanical SystemsSigned-offPURCISIVE INC04/11/2025
DOB NOWStructuralSigned-offPURCISIVE INC04/11/2025
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC04/11/2025
DOB NOWSupport of ExcavationSigned-offPURCISIVE INC04/10/2025
DOB NOWGeneral ConstructionPermit IssuedPURCISIVE INC04/09/2025
DOB NOWStructuralSigned-offN TECH DESIGN OF AMERICA04/08/2025
DOB NOWGeneral ConstructionPermit IssuedN TECH DESIGN OF AMERICA04/08/2025
DOB NOWConstruction FenceSigned-offN TECH DESIGN OF AMERICA03/12/2025
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
12/15/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
12/12/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
12/02/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/19/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/14/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/12/2025Fail-Final SP - Up to 9 Requested FloorsFailView ↗
11/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/15/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/10/2025Pass-Final PL - UndergroundPassView ↗
06/25/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/06/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
04/17/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
03/04/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
02/03/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
02/03/2026Interior lighting powerFAHAD FATEHenergy_progress
02/03/2026Fenestration air leakageFAHAD FATEHenergy_progress
02/03/2026Fenestration areasFAHAD FATEHenergy_progress
02/03/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
02/03/2026MeteringFAHAD FATEHenergy_progress
02/03/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/03/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
02/03/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
02/03/2026Maintenance informationFAHAD FATEHenergy_progress
02/03/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
02/03/2026Permanent certificateFAHAD FATEHenergy_progress
12/01/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/01/2025Sprinkler SystemsFAHAD FATEHspecial
12/01/2025Post-installed AnchorsFAHAD FATEHspecial
11/18/2025Sprinkler SystemsFAHAD FATEHspecial
11/18/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/18/2025Post-installed AnchorsFAHAD FATEHspecial
09/15/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/15/2025Sprinkler SystemsFAHAD FATEHspecial
09/15/2025Post-installed AnchorsFAHAD FATEHspecial
07/21/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/21/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
07/21/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
07/21/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
Latest 25 of 29.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/23/2026B01120689-S5Request digital key ↗
08/23/2026B01120689-S8Request digital key ↗
08/23/2026B01120689-P4Request digital key ↗
Showing 3 of 16 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram3
08/15/2026B01120689-P9Open ↗
08/13/2026B01120689-P6Open ↗
08/13/2026B01120689-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/15/2026B01120689-P9Open ↗
08/13/2026B01120689-P6Open ↗
08/13/2026B01120689-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/15/2026B01120689-P9Open ↗
08/13/2026B01120689-P6Open ↗
08/13/2026B01120689-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/23/2026B01120689-P3Open ↗
08/23/2026B01120689-S8Open ↗
08/23/2026B01120689-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/31/2026B01120689-I1Open ↗
08/31/2026B01120689-P4Open ↗
08/28/2026B01120689-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/31/2026B01120689-I1Open ↗
08/31/2026B01120689-I1Open ↗
08/31/2026B01120689-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/15/2026B01120689-P9Open ↗
08/13/2026B01120689-P6Open ↗
08/13/2026B01120689-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Sign Off1
08/13/2026B01120689-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B01120689-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01120689-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/23/2026B01120689-P4Open ↗
08/23/2026B01120689-S3Open ↗
08/23/2026B01120689-S5Open ↗
Showing 3 of 12 on file for this type
▸Other Documents12
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/15/2026B01120689-P9Open ↗
08/13/2026B01120689-I1Open ↗
08/13/2026B01120689-P6Open ↗
▸DOB NOWSite Survey: Initial3
08/15/2026B01120689-P9Open ↗
08/13/2026B01120689-I1Open ↗
08/13/2026B01120689-P6Open ↗
▸DOB NOWProperty Ownership Certification3
08/15/2026B01120689-P9Open ↗
08/15/2026B01120689-I1Open ↗
08/15/2026B01120689-P6Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B01120689-S6Open ↗
08/13/2026B01120689-S5Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01120689-I1Open ↗