ECB04/08/2026AT TIME OF INSPECTION AT A 2.75 STORY RESIDENTIAL PROPERTY OBSERVED FOUNDATION WITH NEW CMU BLOCKS AT EXPOSURE 1 AND 4. NEW PORCH DECK WITH CONCRETE POURED OVER METAL DECKING WITH EXPOSED COLD ROLLED STEEL JOISHearing held — result not yet published
Locations of Work
No floor-level scope or drawing coverage on file for this building.