ECB04/11/2017Work without a permit.work noted:observed from exterior view,at exposure 2 masonry structure with small windows 3 for basement level with masonry step to first (1ST) floor level.observed at exposure 4 singleNothing owed β awaiting certificate of correction
Flood zone X
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
βΎContractors (License-Anchored)
Firm
Trade
Roles
Most Recent
Dec Contractors
General Contractor
2
12/20/2017
Building Lifecycle
04/11/2017
Work without a permit.work noted:observed from exterior view,at exposure 2 masonry structure with small windows 3 for basement level with masonryβ¦