← Back
BuildNYC
Elevator apt, semi-fireproof without stores
937 VICTORY BOULEVARD
STATEN ISLAND · BIN 5006534
💬 Discuss this project
1965Year Built
7Stories
D1Building Class
R3-2Zoning
107,960 sfGross Floor Area
111Units
Rent Stabilized0 Active ViolationsFISP: SWARMPFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Silver Lake Associates L P · 62,000 sf lot · 1.74 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofJmg Realty, INC.1p · 2 filings · 9 docs
Floor 7Jmg Realty, INC.1 filing · 3 docs
Floor 6Jmg Realty, INC.1 filing · 3 docs
Floor 5Jmg Realty, INC.1 filing · 3 docs
Floor 4Jmg Realty, INC.1 filing · 3 docs
Floor 3Jmg Realty, INC.1 filing · 3 docs
Floor 2Jmg Realty, INC.1 filing · 3 docs
Floor 1Jmg Realty, INC.1 filing · 3 docs
CellarJmg Realty, INC.1 filing · 3 docs
Sub-CellarJmg Realty, INC.5p · 3 filings · 11 docs
Site & exteriorJmg Realty, INC.17p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Silver Lake Associates2403/22/2026
JMG Realty2207/08/2026
Sachs Investing403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Arc109/20/2023
New York & Company209/20/2022
Moore110/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company403/21/2026
Synergy Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Titan Construction ServicesGeneral Contractor307/08/2026
Kinetic Elect'l ContractingElectrical103/22/2026
A & C Heating Servicesspecialty_contractor107/08/2026
Cerina General ContractingGeneral Contractor103/21/2026
Everest ScaffoldingGeneral Contractor103/21/2026
A & C Heating ServicesPlumbing107/08/2026
Gregg NY PlumbingPlumbing107/08/2026
RRP PlumbingFire Protection107/08/2026
Bravo Building ServicesGeneral Contractor204/29/2010
Cattro Consulting GroupGeneral Contractor108/04/2020
Ceprine ConstructionGeneral Contractor209/26/2016
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Outsource Special Inspection2827109/20/2023
New York Engineering Associates851209/20/2022
Moore Associates3408110/21/2021
O'Rourke Engineering5873110/21/2021
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
03/18/2026
Boiler inspection report filed
Initial · no defects · Accepted
02/02/2026
Elevator Category 1 inspection report filed
06/30/2025
Signed off — Alteration
Facade repairs. No change in use or occupancy.
S00905527-I1
06/17/2025
Permit expired, never signed off — Suspended Scaffold
The city's record still shows this permit as issued, with no sign-off on its filing
S01025104-I1-SC
144 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedTitan Construction Services06/17/2024
DOB NOWSuspended ScaffoldPermit IssuedTitan Construction Services04/10/2024
DOB NOWGeneral ConstructionSigned-offTitan Construction Services03/04/2024
DOB NOWGeneral ConstructionSigned-offA & C Heating Services10/01/2022
DOB NOWPlumbingSigned-offDMC Plumbing & Heating09/28/2022
DOB NOWSprinklersPermit IssuedRalph W. Landolfi JR07/20/2022
DOB NOWPlumbingPermit IssuedGregg NY Plumbing07/19/2022
BISOTISSUEDCattro Consulting Group08/04/2020
BISEQISSUEDCeprine Construction09/26/2016
BISEQISSUEDCeprine Construction09/20/2016
BISOTISSUEDTitan Construction Services04/12/2016
BISOTISSUEDTitan Construction Services04/14/2015
BISEQISSUEDEverest Scaffolding04/13/2015
BISOTISSUEDBravo Building Services I04/29/2010
BISOTISSUEDBravo Building Services I11/16/2009
BISEQISSUEDCerina General Contracting01/22/2008
BISOTISSUEDCerina General Contracting11/27/2007
BISFSISSUEDLeardon Boiler Works08/22/2002
BISBLISSUEDAgee Heating Service02/21/2001
6 projects · most recent 11/04/2022
General Wiring
FiledStatusContractorScope
11/04/2022CompleteAll City ElectricalGeneral Wiring
10/13/2020CompleteKinetic Elect'l ContractingGeneral Wiring
02/25/2020CompleteKinetic Elect'l Contracting—
04/09/2019CompleteKinetic Elect'l Contracting—
05/22/2018Permit IssuedKinetic Elect'l ContractingGeneral Wiring
02/26/2018Permit IssuedKinetic Elect'l ContractingGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/22/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/20/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/16/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/08/2023Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
07/18/2023Fenestration and door U-factor and product ratingsJoakim Aspegrenenergy_progress
07/17/2023FinalJoakim Aspegrenprogress
10/08/2021Sprinkler SystemsBRIAN O'ROURKEspecial
10/08/2021Fire-Resistant Penetrations and JointsJAMES MOOREspecial
117 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account