← Back
BuildNYC
Three families
938 TILDEN STREET
BRONX · BIN 2121312
💬 Discuss this project
2020Year Built
3Stories
C0Building Class
R4Zoning
2,462 sfGross Floor Area
3Units
13 Active Violations ▸
Three families · Owner of record: 938 Tilden · 1,420 sf lot · 1.73 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1New curb cut installation6p · 3 filings · 6 docs
Filed — no permit issued938 Tilden Corp.4p · 1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Decatur 12903/21/2026
938 Tilden103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Gee2000 Architect105/06/2026
Bricolage Designs309/03/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Bricolage Designs303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Adir Stuccospecialty_contractor507/08/2026
Gbi ContractingGeneral Contractor303/21/2026
Superior Plumbing & HeatingPlumbing107/06/2020
Building Lifecycle
05/11/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
05/06/2026
Filed — Alteration
REMOVE CONCRETE PAVING AND RESTORE TO NATURAL GREENERY TO ADDRESS VIOLATIONS:39173602X;39153050Z;39153046X;39153044M;39153037Y; 39135529L;39115639Y. No change in use, occupancy or exit.
X01364699-I1
01/13/2026
Natural greenery at exposures#3 and 4 replaced with concrete pavement without any yard drains in place in contrary to zoning resolution…
ECB violation · open
11/18/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
07/08/2025
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. Noted no certificate of…
ECB violation · open
36 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offAdir Stucco03/16/2023
DOB NOWCurb CutSigned-offAdir Stucco03/15/2023
DOB NOWCurb CutSigned-offAdir Stucco03/15/2023
BISEQISSUEDGbi Contracting12/01/2020
BIS—ISSUEDGbi Contracting12/01/2020
BIS—ISSUEDGbi Contracting12/01/2020
BISPLISSUEDSuperior Plumbing & Heating07/06/2020
BISEQISSUEDGbi Contracting02/18/2020
BIS—ISSUEDGbi Contracting02/18/2020
BIS—ISSUEDGbi Contracting02/18/2020
1 project · most recent 08/11/2020
General Wiring
FiledStatusContractorScope
08/11/2020CompleteC & A ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/22/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
03/20/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
83 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account