← Back
Three families
939 ST JOHNS PLACE
BROOKLYN · BIN 3032021
💬 Discuss this project
1909Year Built
3Stories
C0Building Class
R6Zoning
3,280 sfGross Floor Area
3Units
Rent Stabilized32 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 939 JOHNS PLACE LLC · 2,405 sf lot · 1.36 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof3p · 2 filings · 20 docs
Floor 32p · 3 filings · 20 docs
Floor 23p · 4 filings · 20 docs
Floor 12p · 4 filings · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
939 JOHNS PLACE LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/27/2022$1.4M—Private party → 939 JOHNS PLACE LLC$431/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADB ASSOCIATES211/19/2024
TECHNEMOTION DESIGN1305/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGHRISE GROUP1503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
METHOD GENERAL CONTRACTORGeneral Contractor307/08/2026
METHOD ELECTRIC LLCElectrical103/22/2026
MPI PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616505/13/2024
Building Lifecycle
All (118)Filed (15)Permit Issued (4)Signed Off (4)Violation (47)Inspection (3)Objection (28)Special Inspection (17)
05/05/2026
Violation issued (HPD, closed)
A
06/10/2025
Violation issued (HPD, closed)
A
11/29/2024
Signed off — Alteration
PROPOSED MECHANICAL WORK TO AN EXISTING 3 STORY BUILDING.
B00852559-I1
11/29/2024
Signed off — Alteration
PROPOSING PLUMBING WORK TO EXISTING 3 STORY BUILDING.
B00839248-I1
11/27/2024
Signed off — Alteration
PROPOSED INTERIOR RENOVATIONS TO EXISTING 3 STORY BUILDING. NO CHANGE IN BULK, USE OR OCCUPANCY UNDER THIS APPLICATION.
B00832511-I1
11/27/2024
Signed off — Alteration
PROPOSED INTERIOR RENOVATIONS TO EXISTING 3 STORY BUILDING. NO CHANGE IN USE OR BULK UNDER THIS APPLICATION.
B00907181-I1
11/26/2024
Violation issued (HPD, closed)
I
11/19/2024
Filed — Alteration
PROPOSING PLUMBING WORK TO EXISTING 3 STORY BUILDING.
B00839248-P3
11/05/2024
Special inspection requirement — Energy Code Compliance Inspections
11/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/03/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/20/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/14/2024
Special inspection requirement — Final
FAHAD FATEH
05/13/2024
Filed — Alteration
PROPOSED INTERIOR RENOVATIONS TO EXISTING 3 STORY BUILDING. NO CHANGE IN BULK, USE OR OCCUPANCY UNDER THIS APPLICATION.
B00832511-P3
05/13/2024
Filed — Alteration
PROPOSED MECHANICAL WORK TO AN EXISTING 3 STORY BUILDING.
B00852559-P3
05/03/2024
Special inspection requirement — Final
FAHAD FATEH
05/02/2024
Special inspection requirement — Final
FAHAD FATEH
05/02/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
04/11/2024
Violation issued (HPD, closed)
A
03/22/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/31/2024
Filed — Alteration
PROPOSED MECHANICAL WORK TO AN EXISTING 3 STORY BUILDING.
B00852559-P2
01/29/2024
Special inspection requirement — Final
FAHAD FATEH
01/29/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
01/16/2024
Objection resolved — Addressed
01/16/2024
Special inspection requirement — Final
FAHAD FATEH
01/12/2024
Permit issued — Plumbing
B00839248-I1-PL
01/10/2024
Objection resolved — Addressed
01/02/2024
Objection raised — Other
01/02/2024
Objection raised — Other
12/25/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATIONS TO EXISTING 3 STORY BUILDING. NO CHANGE IN USE OR BULK UNDER THIS APPLICATION.
B00907181-P2
12/25/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATIONS TO EXISTING 3 STORY BUILDING. NO CHANGE IN BULK, USE OR OCCUPANCY UNDER THIS APPLICATION.
B00832511-P2
12/25/2023
Special inspection requirement — Final
FAHAD FATEH
12/25/2023
Special inspection requirement — Final
FAHAD FATEH
12/14/2023
Permit issued — Mechanical Systems
B00852559-I1-MS
12/12/2023
Permit issued — General Construction
B00832511-I1-GC
12/07/2023
Permit issued — General Construction
B00907181-I1-GC
11/20/2023
Violation issued (HPD, closed)
I
10/12/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATIONS TO EXISTING 3 STORY BUILDING. NO CHANGE IN USE OR BULK UNDER THIS APPLICATION.
B00907181-P1
10/12/2023
Special inspection requirement — Final
FAHAD FATEH
09/11/2023
Objection resolved — Addressed
09/11/2023
Objection resolved — Addressed
09/11/2023
Objection resolved — Addressed
09/11/2023
Objection resolved — Addressed
09/11/2023
Objection resolved — Addressed
09/11/2023
Objection resolved — Addressed
09/11/2023
Objection resolved — Addressed
09/04/2023
Objection resolved — Addressed
08/02/2023
Objection raised — Fire_Protection
08/02/2023
Objection raised — Other
08/02/2023
Objection raised — Other
08/02/2023
Objection resolved — Addressed
08/02/2023
Objection raised — Structural
08/02/2023
Objection raised — Fire_Protection
08/02/2023
Objection raised — Scope
08/02/2023
Objection raised — Fire_Protection
08/02/2023
Objection raised — Other
08/02/2023
Objection raised — Admin
07/26/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATIONS TO EXISTING 3 STORY BUILDING. NO CHANGE IN USE OR BULK UNDER THIS APPLICATION.
B00907181-I1
07/10/2023
Filed — Alteration
PROPOSED MECHANICAL WORK TO AN EXISTING 3 STORY BUILDING.
B00852559-P1
07/10/2023
Filed — Alteration
PROPOSING PLUMBING WORK TO EXISTING 3 STORY BUILDING.
B00839248-P1
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offYG SERVICES INC01/12/2024
DOB NOWMechanical SystemsSigned-offMETHOD GENERAL CONTRACTOR12/14/2023
DOB NOWGeneral ConstructionSigned-offMETHOD GENERAL CONTRACTOR12/12/2023
DOB NOWGeneral ConstructionSigned-offMETHOD GENERAL CONTRACTOR12/07/2023
2 projects · most recent 10/09/2024
General Wiring
FiledStatusContractorScope
10/09/2024CompleteMETHOD ELECTRIC LLCGeneral Wiring
01/12/2024CompleteMETHOD ELECTRIC LLC—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/20/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/22/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
11/05/2024Energy Code Compliance Inspections—progress
11/05/2024Fire-Resistant Penetrations and Joints—special
05/14/2024FinalFAHAD FATEHprogress
05/03/2024FinalFAHAD FATEHprogress
05/02/2024FinalFAHAD FATEHprogress
05/02/2024Mechanical SystemsFAHAD FATEHspecial
01/29/2024FinalFAHAD FATEHprogress
01/29/2024Mechanical SystemsFAHAD FATEHspecial
01/16/2024FinalFAHAD FATEHprogress
12/25/2023FinalFAHAD FATEHprogress
12/25/2023FinalFAHAD FATEHprogress
10/12/2023FinalFAHAD FATEHprogress
07/06/2023FinalFAHAD FATEHprogress
03/10/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/10/2023Fire-Resistance Rated ConstructionFAHAD FATEHprogress
03/10/2023Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
02/16/2023FinalFAHAD FATEHprogress
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/27/2026B00830431-I1Request digital key ↗
08/27/2026B00832511-P2Request digital key ↗
08/27/2026B00832511-P3Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits13
▸DOB NOWLPC Approval/Permit13
08/27/2026B00832511-P3Open ↗
08/13/2026B00832511-I1Open ↗
08/13/2026B00839248-P3Open ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/27/2026B00832511-P1Open ↗
08/27/2026B00832511-P2Open ↗
08/27/2026B00832511-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/22/2026B00832511-P2Open ↗
09/02/2026B00832511-P3Open ↗
09/01/2026B00907181-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026B00852559-P3Open ↗
08/24/2026B00830431-I1Open ↗
08/23/2026B00852559-P2Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/27/2026B00832511-P1Open ↗
08/27/2026B00832511-P2Open ↗
08/27/2026B00832511-P3Open ↗
Showing 3 of 12 on file for this type
▸Approvals, Objections & Sign-offs2
▸DOB NOWLandmark Approval2
08/13/2026B00907181-P1Open ↗
08/13/2026B00907181-I1Open ↗