← Back
BuildNYC
Telephone utility
94-03 QUEENS BOULEVARD
QUEENS · Rego Park · BIN 4591646
💬 Discuss this project
0Year Built
—Stories
U4Building Class
R7-1Zoning
0 sfGross Floor Area
0Units
0 Active ViolationsFDNY Report ↗
Telephone utility · Owner of record: Reign Co1 Propco · 113,959 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofAT&TUnder Construction1p · 1 filing · 4 docs
Site & exteriorAT&T Teleholding3p · 2 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Reign Co1 Propco103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/28/2021$59.3M—AT&T COMMUNICATIONS OF NEW YORK, INC. → REIGN CO1 PROPCO, LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Wellworth Consulting108/04/2026
Titan Engineers103/13/2026
Bloom Energy307/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Bloom Energy603/21/2026
Milrose Consultants203/21/2026
Synergy Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Bloom EnergyGeneral Contractor303/21/2026
Hatzel and BuehlerElectrical103/22/2026
Ahearn-HoltzmanGeneral Contractor104/09/2026
Spring ScaffoldingScaffold108/05/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Eti Consultants7694103/13/2026
KZ Engineering4665101/05/2026
Autographic Co1579207/26/2023
Building Lifecycle
All (33)Filed (6)Permit Issued (4)Signed Off (2)Violation (1)Special Inspection (20)
10/07/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01437937-I1
08/04/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01437937-I1
08/04/2026
Permit issued — Sidewalk Shed
Q01437937-I1-SH
03/26/2026
Permit issued — General Construction
Q01366694-I1-GC
03/13/2026
Filed — Alteration
Removal and replacement of cracked/displaced masonry and deteriorated sealant, crack repairs at existing granite panels, and repointing of existing brick masonry joints as per plans filed
Q01366694-I1
03/03/2026
Special inspection requirement — Post-installed Anchors
ANTHONY MUSUMECI
03/03/2026
Special inspection requirement — Final
JAMIE MERRITT
01/07/2026
Permit issued — Suspended Scaffold
Q01342251-I1-SC
01/05/2026
Filed — Alteration
Installation of suspended scaffold for facade inspection/ repair.
Q01342251-I1
01/05/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
01/05/2026
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
01/04/2025
Violation issued (ECB, closed)
Construction
08/09/2023
Signed off — Alteration
Replacement of one (1) Bloom Energy Fuel Cell Energy Server to perform system upgrade. Existing concrete pad shall be modified to accommodate the installation of the new ES-5 system.
Q08011567-I1
07/26/2023
Filed — Alteration
Replacement of one (1) Bloom Energy Fuel Cell Energy Server to perform system upgrade. Existing concrete pad shall be modified to accommodate the installation of the new ES-5 system.
Q08011567-P2
07/26/2023
Special inspection requirement — Final
SASHA SCARLAT
07/26/2023
Special inspection requirement — Concrete - Cast-In-Place
asghar Ghodsi
07/26/2023
Special inspection requirement — Subgrade Inspections
asghar Ghodsi
07/26/2023
Special inspection requirement — Post-installed Anchors
asghar Ghodsi
07/26/2023
Special inspection requirement — Footing and Foundation
asghar Ghodsi
07/21/2023
Special inspection requirement — Footing and Foundation
asghar Ghodsi
07/21/2023
Special inspection requirement — Concrete - Cast-In-Place
asghar Ghodsi
07/21/2023
Special inspection requirement — Post-installed Anchors
asghar Ghodsi
07/21/2023
Special inspection requirement — Subgrade Inspections
asghar Ghodsi
07/21/2023
Special inspection requirement — Final
SASHA SCARLAT
11/14/2022
Permit issued — Foundation
Q08011567-I1-FO
11/02/2022
Filed — Alteration
Replacement of one (1) Bloom Energy Fuel Cell Energy Server to perform system upgrade. Existing concrete pad shall be modified to accommodate the installation of the new ES-5 system.
Q08011567-P1
11/02/2022
Special inspection requirement — Concrete - Cast-In-Place
11/02/2022
Special inspection requirement — Final
11/02/2022
Special inspection requirement — Subgrade Inspections
11/02/2022
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
11/02/2022
Special inspection requirement — Footing and Foundation
11/02/2022
Special inspection requirement — Post-installed Anchors
09/29/2022
Filed — Alteration
Replacement of one (1) Bloom Energy Fuel Cell Energy Server to perform system upgrade. Existing concrete pad shall be modified to accommodate the installation of the new ES-5 system.
Q08011567-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offSpring Scaffolding08/04/2026
DOB NOWGeneral ConstructionPermit IssuedAhearn-Holtzman03/26/2026
DOB NOWSuspended ScaffoldPermit IssuedH & H Restoration01/07/2026
DOB NOWFoundationSigned-offBloom Energy11/14/2022
BISMHISSUEDAhearn-Holtzman09/02/2020
BISOTISSUEDAhearn-Holtzman09/02/2020
BISOTISSUEDAhearn-Holtzman06/06/2018
BISMHISSUEDAhearn-Holtzman06/06/2018
5 projects · most recent 08/11/2026
General Wiring Lighting
FiledStatusContractorScope
08/11/2026Permit IssuedCorporate Electric Group—
07/06/2026CompleteTop Shelf Electric—
09/30/2024CompleteHatzel and BuehlerGeneral Wiring
08/11/2022CompleteForest ElectricGeneral Wiring
06/19/2018CompleteHatzel and BuehlerGeneral Wiring, Lighting
1 project · most recent 08/04/2026
Sidewalk Shed
FiledStatusContractorScope
08/04/2026Signed-offSpring ScaffoldingSidewalk Shed
1 project · most recent 01/05/2026
Suspended Scaffold
FiledStatusContractorScope
01/05/2026Permit IssuedH & H RestorationSuspended Scaffold
1 project · most recent 01/05/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
01/05/2026Permit IssuedH & H RestorationSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
03/03/2026Post-installed AnchorsANTHONY MUSUMECIspecial
03/03/2026FinalJAMIE MERRITTprogress
01/05/2026Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
01/05/2026Post-installed AnchorsKarol Zdancewiczspecial
07/26/2023FinalSASHA SCARLATprogress
07/26/2023Concrete - Cast-In-Placeasghar Ghodsispecial
07/26/2023Subgrade Inspectionsasghar Ghodsispecial
07/26/2023Post-installed Anchorsasghar Ghodsispecial
07/26/2023Footing and Foundationasghar Ghodsiprogress
07/21/2023Footing and Foundationasghar Ghodsiprogress
07/21/2023Concrete - Cast-In-Placeasghar Ghodsispecial
07/21/2023Post-installed Anchorsasghar Ghodsispecial
07/21/2023Subgrade Inspectionsasghar Ghodsispecial
07/21/2023FinalSASHA SCARLATprogress
11/02/2022Concrete - Cast-In-Place—special
11/02/2022Final—progress
11/02/2022Subgrade Inspections—special
11/02/2022Subsurface Conditions – Fill Placement & In-Place Density—special
11/02/2022Footing and Foundation—progress
11/02/2022Post-installed Anchors—special
▾Tenants in the building
TenantSpaceFloorsRenovation projects
AT&TTelecom siteRoof
Project Q01366694 Alteration · Permit Entire · 03/13/2026
AT&T TeleholdingTelecom site—
Project Q08011567 Alteration · LOC Issued · 09/29/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026Q08011567-P1Request digital key ↗
08/25/2026Q08011567-I1Request digital key ↗
08/25/2026Q08011567-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION4
10/30/2020421598916Open ↗
10/30/2020421598916Open ↗
06/13/2018421598916Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
02/12/2018421598916Open ↗
02/12/2018421598916Open ↗
▸Seals & Professional Certifications27
▸DOB NOWSpecial Inspector Seal & Signature9
08/28/2026Q08011567-I1Open ↗
08/28/2026Q08011567-I1Open ↗
08/28/2026Q08011567-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
06/13/2018421598916Open ↗
05/17/2018421598916Open ↗
05/17/2018421598916Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026Q08011567-I1Open ↗
08/28/2026Q08011567-I1Open ↗
08/28/2026Q08011567-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026Q08011567-I1Open ↗
08/25/2026Q08011567-P1Open ↗
08/17/2026Q01366694-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/12/2018421598916Open ↗
02/12/2018421598916Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01366694-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/12/2018421598916Open ↗
02/12/2018421598916Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSUPERSEDING LETTER1
10/30/2020421598916Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
02/12/2018421598916Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
02/12/2018421598916Open ↗
02/12/2018421598916Open ↗
▸BISADDITIONAL INFORMATION1
05/17/2018421598916Open ↗
▸BISBOROUGH INTAKE FORM1
10/30/2020421598916Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026Q01342251-I1Open ↗
▸DOB NOWCalculations1
08/13/2026Q01342251-I1Open ↗