← Back
Predominantly retail with other uses
94-05 ASTORIA BOULEVARD
QUEENS · BIN 4032608
💬 Discuss this project
1925Year Built
2Stories
K4Building Class
R6BZoning
1,530 sfGross Floor Area
2Units
Rent Stabilized11 Open Violations 9 unresolved · 2 paperwork only ▸
Predominantly retail with other uses · Owner of record: POPLE 1F LLC · 827 sf lot · 1.85 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
H&B CONSTRUCTION SERVICES, INC707/08/2026
POPLE 1F LLC303/22/2026
POPLE 1 F LLC203/21/2026
FROILAN203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEI ARCHITECT PLLC408/14/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALPHA HOME DESIGN LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIMROSE SERVICE INCGeneral Contractor107/08/2026
VILLAGE P & H NY INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEI ARCHITECT PLLC8095205/26/2023
Building Lifecycle
All (42)Filed (4)Permit Issued (2)Signed Off (2)Violation (18)Inspection (4)Objection (8)Special Inspection (4)
08/14/2026
Filed — Alteration
RESTORE THE USE IN EXISTING COMMERCIAL SPACE ON 1ST FLOOR AND CELLAR AS PER THE PLAN FILED HEREWITH TO REMOVE ECB VIOLATIONS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01443445-I1
08/14/2026
Filed — Alteration
RESTORE THE USE IN EXISTING COMMERCIAL SPACE ON 1ST FLOOR AND CELLAR AS PER THE PLAN FILED HEREWITH TO REMOVE ECB VIOLATIONS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01443445-S1
08/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/26/2026
Violation issued (ECB, open)
Construction
06/26/2026
Violation issued (ECB, open)
Zoning
06/26/2026
Violation issued (ECB, open)
Construction
06/26/2026
Violation issued (ECB, open)
Construction
06/26/2026
Violation issued (ECB, open)
Construction
06/26/2026
Violation issued (ECB, open)
Construction
06/26/2026
Violation issued (ECB, open)
Construction
06/26/2026
Violation issued (ECB, open)
Construction
06/26/2026
Violation issued (ECB, open)
Construction
06/26/2026
Violation issued (ECB, open)
Construction
11/25/2025
Violation issued (HPD, open)
I
11/29/2023
Violation issued (HPD, closed)
I
09/13/2023
Signed off — Alteration
LEGALIZE THE PLUMBING WORK IN THE EXISTING COMMERCIAL SPACE ON 1ST FLOOR AND CELLAR AS PER THE PLAN FILED HEREWITH TO REMOVE ECB VIOLATIONS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00879058-S1
09/11/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/08/2023
Signed off — Alteration
LEGALIZE THE PLUMBING WORK IN THE EXISTING COMMERCIAL SPACE ON 1ST FLOOR AND CELLAR AS PER THE PLAN FILED HEREWITH TO REMOVE ECB VIOLATIONS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00879058-I1
09/07/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/26/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/24/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/21/2023
Permit issued — Plumbing
Q00879058-S1-PL
06/19/2023
Permit issued — General Construction
Q00879058-I1-GC
06/13/2023
Objection resolved — Addressed
06/08/2023
Objection resolved — Addressed
06/08/2023
Objection resolved — Addressed
06/08/2023
Objection resolved — Addressed
06/01/2023
Objection raised — Scope
06/01/2023
Objection raised — Admin
06/01/2023
Objection raised — Structural
06/01/2023
Objection raised — Scope
05/26/2023
Filed — Alteration
LEGALIZE THE PLUMBING WORK IN THE EXISTING COMMERCIAL SPACE ON 1ST FLOOR AND CELLAR AS PER THE PLAN FILED HEREWITH TO REMOVE ECB VIOLATIONS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00879058-S1
05/24/2023
Filed — Alteration
LEGALIZE THE PLUMBING WORK IN THE EXISTING COMMERCIAL SPACE ON 1ST FLOOR AND CELLAR AS PER THE PLAN FILED HEREWITH TO REMOVE ECB VIOLATIONS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00879058-I1
05/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SIMING MEI
05/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SIMING MEI
04/27/2023
Violation issued (ECB, closed)
Zoning
04/27/2023
Violation issued (ECB, closed)
Construction
04/27/2023
Violation issued (ECB, closed)
Construction
11/18/2022
Violation issued (HPD, closed)
I
08/18/2010
Violation issued (ECB, closed)
Construction
12/30/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC06/21/2023
DOB NOWGeneral ConstructionSigned-offPRIMROSE SERVICE INC06/19/2023
BISOTISSUEDJIAN LI INC08/12/2013
BISOTISSUEDCWC PLUMBING & HTG LLC03/28/2012
BISPLISSUEDC.W.C. FIRE SUPPRESSION03/28/2012
BISFPISSUEDNY BUSINESS FIRE SYSTEM08/13/2008
BISMHISSUEDROBIN SYSTEMS INC05/22/2008
BISOTISSUEDYASHA & YAKOV04/14/2008
1 job · most recent 08/14/2026
Water/Sanitary
FiledStatusContractorScope
08/14/2026——Water/Sanitary
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/07/2023Pass-Final General Construction Non-Directive 14PassView ↗
07/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/10/2026Fire-Resistant Penetrations and Joints—special
08/10/2026Fire-Resistant Penetrations and Joints—special
05/24/2023Fire-Resistant Penetrations and JointsSIMING MEIspecial
05/22/2023Fire-Resistant Penetrations and JointsSIMING MEIspecial
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026Q00879058-I1Request digital key ↗
08/24/2026Q00879058-S1Request digital key ↗
08/16/2026Q01443445-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION11
08/10/2013420863168Open ↗
01/09/2012420519406Open ↗
01/26/2009410133626Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION7
08/17/2013420863168Open ↗
03/29/2012420519406Open ↗
03/29/2012420519406Open ↗
Showing 3 of 7 on file for this type
▸BISIntent to Revoke Approval/Permit3
02/12/2014410093697Open ↗
02/11/2014410102687Open ↗
02/11/2014410102687Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
10/11/2013420863168Open ↗
▸Seals & Professional Certifications21
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
09/26/2012420519406Open ↗
01/09/2012420519406Open ↗
08/05/2008410147835Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
08/10/2013420863168Open ↗
01/09/2012420519406Open ↗
04/25/2008410102687Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
08/10/2013420863168Open ↗
01/09/2012420519406Open ↗
04/25/2008410102687Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/16/2026Q01443445-I1Open ↗
08/16/2026Q01443445-S1Open ↗
08/13/2026Q00879058-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026Q00879058-S1Open ↗
08/23/2026Q00879058-I1Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING4
01/09/2012420519406Open ↗
10/22/2008410093697Open ↗
09/11/2008410093697Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
04/17/2012420519406Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/16/2026Q01443445-S1Open ↗
08/16/2026Q01443445-I1Open ↗
08/13/2026Q00879058-S1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
08/05/2008410147835Open ↗
07/29/2008410133626Open ↗
04/25/2008410102687Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
08/10/2013420863168Open ↗
08/10/2013420863168Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
01/09/2012420519406Open ↗
04/03/2008410093697Open ↗
▸Energy Compliance5
▸BISAS-BUILT ENERGY ANALYSIS2
10/11/2013420863168Open ↗
09/26/2012420519406Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/29/2012420519406Open ↗
▸BISTR8: Energy Code Progress Inspections1
08/10/2013420863168Open ↗
▸BISTECHNICAL REPORT: ENERGY1
01/09/2012420519406Open ↗
▸Approvals, Objections & Sign-offs9
▸BISADMINISTRATIVE OBJECTIONS6
08/10/2013420863168Open ↗
01/13/2012420519406Open ↗
08/05/2008410147835Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/11/2013420863168Open ↗
09/29/2012420519406Open ↗
▸BISResponse to Intent to Rescind Letter1
02/11/2014410093697Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
10/11/2013420863168Open ↗
08/10/2013420863168Open ↗
09/26/2012420519406Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET6
08/10/2013420863168Open ↗
01/09/2012420519406Open ↗
08/05/2008410147835Open ↗
Showing 3 of 6 on file for this type