← Back
BuildNYC
QUEENS
94- 18 46 AVENUE
QUEENS Ā· BIN 4594920
šŸ’¬ Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
10 Active Violations 9 unresolved Ā· 1 paperwork only 5 likely answered ā–øFDNY Report ↗
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
ā–¾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Amanda R203/21/2026
Building Lifecycle
10/20/2026
Boiler inspection report filed
Initial Ā· no defects Ā· Accepted
11/14/2025
Failure to file 2024 external low pressure inspection
DOB violation Ā· open
10/20/2025
Boiler inspection report filed
Initial Ā· no defects Ā· Accepted
09/23/2024
Failure to file 2023 external low pressure inspection
DOB violation Ā· open
04/17/2024
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation Ā· closed
31 history events on file for this building. Sign in free to see the full history. Sign in Ā· Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—Octavio Raposo—
BIS—J.G. Plumbing & Heating—
BIS—Octavio Raposo—
BIS—Octavio Raposo—
BIS—Octavio Raposo—
BIS—J.G. Plumbing & Heating—
BIS—Octavio Raposo—
BIS—Octavio Raposo—
BIS—Octavio Raposo—
BIS—Raposo Construction—
BIS—Raposo Construction—
BIS—Vera Construction—
BIS—Vera Construction—
BIS—Vera Construction—
BIS—Vera Construction—
BIS—Multicraft Home Remodeling—
Nothing on file for this building.
Nothing on file for this building.
49 filed documents on file for this building. Sign in free to see the full history. Sign in Ā· Create account