← Back
Two family converted from one family
94-28 121 STREET
QUEENS · BIN 4581964
💬 Discuss this project
1910Year Built
2.5Stories
B3Building Class
R5Zoning
1,854 sfGross Floor Area
2Units
Two family converted from one family · 4,603 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 2 filings · 20 docs
Floor 11p · 1 filing · 5 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NASIR J, KHANZADA LLC607/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NASIR J. KHANZADA LLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DAVE RESTORATION INCGeneral Contractor207/22/2026
BUILD TECH CONSTRUCTION CORP.General Contractor107/08/2026
M & M PIPING AND HEATINGPlumbing107/30/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NASIR J. KHANZADA LLC1527307/21/2026
Building Lifecycle
All (30)Filed (6)Permit Issued (4)Inspection (3)Objection (3)Special Inspection (14)
08/19/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/18/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/29/2026
Permit issued — Plumbing
Q01303650-S1-PL
07/24/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Nasir Khanzada
07/24/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Nasir Khanzada
07/22/2026
Filed — New Building
PLUMBING FILING IN CONJUNCTION WITH THE PROPOSED NEW GARAGE
Q01303650-P1
07/21/2026
Filed — New Building
PLUMBING FILING IN CONJUNCTION WITH THE PROPOSED NEW GARAGE
Q01303650-S1
07/20/2026
Permit issued — Earth Work
Q01303650-I1-ST
07/20/2026
Permit issued — General Construction
Q01303650-I1-GC
06/09/2026
Permit issued — Foundation
Q01303650-I1-FO-EA
03/27/2026
Objection raised — Admin
03/23/2026
Filed — Full Demolition
Q01366898-I1
01/07/2026
Objection resolved — Addressed
11/03/2025
Objection raised — Other
10/30/2025
Filed — New Building
PLUMBING FILING IN CONJUNCTION WITH THE PROPOSED NEW GARAGE
Q01303650-I1
10/10/2025
Filed — Full Demolition
full demolition of the car garage
Q01299720-I1
10/08/2025
Special inspection requirement — Demolition
Nasir Khanzada
10/08/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
Nasir Khanzada
07/29/2025
Filed — Alteration CO
Q01247675-I1
06/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
06/26/2025
Special inspection requirement — Structural Wood Frame
06/26/2025
Special inspection requirement — Final
06/26/2025
Special inspection requirement — Footing and Foundation
06/26/2025
Special inspection requirement — Interior lighting power
06/26/2025
Special inspection requirement — Electric vehicle service equipment requirements
06/26/2025
Special inspection requirement — Concrete - Cast-In-Place
06/26/2025
Special inspection requirement — Masonry
06/26/2025
Special inspection requirement — Subgrade Inspections
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedM & M PIPING AND HEATING07/29/2026
DOB NOWEarth WorkPermit IssuedDAVE RESTORATION INC07/20/2026
DOB NOWGeneral ConstructionPermit IssuedDAVE RESTORATION INC07/20/2026
DOB NOWFoundationPermit IssuedBUILD TECH CONSTRUCTION CORP.06/09/2026
1 project · most recent 07/22/2026
Storm
FiledStatusContractorScope
07/22/2026Permit IssuedM & M PIPING AND HEATINGStorm
1 project · most recent 06/25/2026
General Wiring
FiledStatusContractorScope
06/25/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/19/2026Pass-Final PL - UndergroundPassView ↗
08/18/2026Pass-Final PL - UndergroundPassView ↗
08/03/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
07/24/2026Subsurface Investigations (Borings/Test Pits)Nasir Khanzadaspecial
07/24/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesNasir Khanzadaspecial
10/08/2025DemolitionNasir Khanzadaspecial
10/08/2025Structural Stability – Alterations of existing BuildingsNasir Khanzadaspecial
06/26/2025Structural Stability – Alterations of existing buildings—special
06/26/2025Fire-Resistance Rated Construction—progress
06/26/2025Structural Wood Frame—progress
06/26/2025Final—progress
06/26/2025Footing and Foundation—progress
06/26/2025Interior lighting power—energy_progress
06/26/2025Electric vehicle service equipment requirements—energy_progress
06/26/2025Concrete - Cast-In-Place—special
06/26/2025Masonry—special
06/26/2025Subgrade Inspections—special
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/19/2026Q01247675-I1Request digital key ↗
08/18/2026Q01299720-I1Request digital key ↗
08/18/2026Q01303650-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01303650-I1Open ↗
08/13/2026Q01247675-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01303650-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/18/2026Q01303650-S1Open ↗
08/18/2026Q01303650-P1Open ↗
08/17/2026Q01366898-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q01299720-I1Open ↗
09/01/2026Q01299720-I1Open ↗
08/29/2026Q01303650-S1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q01247675-I1Open ↗
08/13/2026Q01303650-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWRodent Control1
08/17/2026Q01366898-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/18/2026Q01303650-P1Open ↗
08/18/2026Q01303650-S1Open ↗
▸DOB NOWLegalization Inspection Report1
08/17/2026Q01366898-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/18/2026Q01303650-S1Open ↗
▸Other Documents13
▸DOB NOWProperty Ownership Certification4
08/17/2026Q01366898-I1Open ↗
08/13/2026Q01247675-I1Open ↗
08/13/2026Q01303650-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCommunity Board Notification2
08/17/2026Q01366898-I1Open ↗
08/13/2026Q01299720-I1Open ↗
▸DOB NOWStructure Photographs2
08/17/2026Q01366898-I1Open ↗
08/13/2026Q01299720-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice2
08/17/2026Q01366898-I1Open ↗
08/13/2026Q01299720-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01303650-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01303650-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01303650-I1Open ↗