← Back
Two family brick
94 6 AVENUE
BROOKLYN · BIN 3018739
💬 Discuss this project
1869Year Built
3Stories
B1Building Class
R6BZoning
4,036 sfGross Floor Area
2Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Two family brick · Owner of record: 94 6TH AVE LLC · 2,108 sf lot · 1.91 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Floor 324p · 2 filings · 20 docs
Floor 223p · 2 filings · 20 docs
Floor 123p · 2 filings · 20 docs
Cellar24p · 3 filings · 20 docs
Basement16p · 1 filing · 20 docs
Sub-Basement8p · 1 filing · 18 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOHN PATRICK CUNNINGHAM709/25/2025
TSS ENGINEERS104/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JENNY FLORES EXPEDITING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZONE PLUMBING & HEATING CPlumbing207/08/2026
VILLAGE P & H NY INCFire Protection107/08/2026
VESTA CONSTRUCTION, INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AGE ENGINEERING PLLC7746609/25/2025
TSS ENGINEERS4492104/24/2023
Building Lifecycle
All (64)Filed (8)Permit Issued (4)Violation (10)Inspection (13)Objection (16)Special Inspection (13)
04/30/2026
Violation issued (HPD, closed)
A
12/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/01/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/19/2025
Violation issued (HPD, closed)
I
11/06/2025
Objection resolved — Addressed
10/08/2025
Objection raised — Scope
09/25/2025
Filed — Alteration CO
HEREBY FILING FOR THE RENOVATION/CONVERSION OF SRO TO 4 DWELLING BUILDING.
B00820958-P2
09/25/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/19/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/17/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
09/16/2025
Special inspection requirement — Energy Code Compliance Inspections
John Cunningham
09/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
John Cunningham
09/16/2025
Special inspection requirement — Insulation placement and R values
John Cunningham
09/16/2025
Special inspection requirement — Lighting in dwelling units
John Cunningham
09/09/2025
Filed — Alteration
HEREBY FILING FOR THE RENOVATION/CONVERSION OF 2 DWELLING TO 4 DWELLING BUILDING (INSTALLATION OF PLUMBING FIXTURES). FILED IN CONJUNCTION WITH ALTERATION CO APPLICATION# B00820958-I1.
B00835807-P2
09/02/2025
Permit issued — Sprinklers
B00863612-I1-EW-SP
08/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
07/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/30/2025
Permit issued — Plumbing
B00835807-I1-PL
07/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/17/2024
Objection resolved — Addressed
04/16/2024
Objection raised — Other
04/12/2024
Objection resolved — Addressed
04/03/2024
Violation issued (HPD, closed)
A
04/02/2024
Objection resolved — Addressed
04/02/2024
Objection resolved — Addressed
03/06/2024
Objection raised — Zoning
03/06/2024
Objection raised — Scope
02/27/2024
Filed — Alteration CO
HEREBY FILING FOR THE RENOVATION/CONVERSION OF SRO TO 4 DWELLING BUILDING.
B00820958-P1
02/25/2024
Special inspection requirement — Fire-Resistance Rated Construction
John Cunningham
02/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
02/25/2024
Special inspection requirement — Energy Code Compliance Inspections
John Cunningham
02/25/2024
Special inspection requirement — Insulation placement and R values
John Cunningham
02/25/2024
Special inspection requirement — Lighting in dwelling units
John Cunningham
02/12/2024
Objection raised — Scope
02/06/2024
Filed — Alteration
HEREBY FILING FOR THE RENOVATION/CONVERSION OF 2 DWELLING TO 4 DWELLING BUILDING (INSTALLATION OF PLUMBING FIXTURES). FILED IN CONJUNCTION WITH ALTERATION CO APPLICATION# B00820958-I1.
B00835807-P1
01/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
01/11/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/11/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/06/2023
Filed — Alteration CO
HEREBY FILING FOR THE RENOVATION/CONVERSION OF SRO TO 4 DWELLING BUILDING.
B00820958-S1
11/20/2023
Violation issued (HPD, closed)
I
10/17/2023
Permit issued — Plumbing
B00835807-I1-PL
08/21/2023
Permit issued — General Construction
B00820958-I1-GC
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/24/2023
Filed — Alteration
INSTALLATION OF WET PIPE SPRINKLER SYSTEM (INTERIOR ONLY). FILED IN CONJUNCTION WITH ALTERATION CO B00820958-I1.
B00863612-I1
04/21/2023
Special inspection requirement — Sprinkler Systems
bassam (sam) rimawi
03/20/2023
Violation issued (HPD, closed)
A
02/28/2023
Objection raised — Scope
02/28/2023
Objection resolved — Addressed
02/28/2023
Objection raised — Scope
02/28/2023
Objection resolved — Addressed
02/28/2023
Objection raised — Energy
02/28/2023
Objection resolved — Addressed
02/27/2023
Filed — Alteration
HEREBY FILING FOR THE RENOVATION/CONVERSION OF 2 DWELLING TO 4 DWELLING BUILDING (INSTALLATION OF PLUMBING FIXTURES). FILED IN CONJUNCTION WITH ALTERATION CO APPLICATION# B00820958-I1.
B00835807-I1
02/03/2023
Filed — Alteration CO
HEREBY FILING FOR THE RENOVATION/CONVERSION OF SRO TO 4 DWELLING BUILDING.
B00820958-I1
09/15/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/02/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offVILLAGE P & H NY INC09/02/2025
DOB NOWPlumbingPermit IssuedZONE PLUMBING & HEATING C06/30/2025
DOB NOWPlumbingPermit IssuedZONE PLUMBING & HEATING C10/17/2023
DOB NOWGeneral ConstructionPermit IssuedVESTA CONSTRUCTION, INC08/21/2023
1 project · most recent 09/25/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/25/2025Permit IssuedVESTA CONSTRUCTION, INCAir Conditioning Systems
Cooling
1 project · most recent 04/24/2023
FiledStatusContractorScope
04/24/2023Signed-offPARAMOUNT SERVICES, LLC—
1 project · most recent 09/09/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/09/2025Permit IssuedZONE PLUMBING & HEATING CGas, Water/Sanitary
1 project · most recent 08/31/2023
General Wiring
FiledStatusContractorScope
08/31/2023CompleteRABBIT ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
12/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/01/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/25/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/25/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/19/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/11/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/15/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
09/16/2025Fire-Resistant Penetrations and JointsStephen Shishkospecial
09/16/2025Energy Code Compliance InspectionsJohn Cunninghamprogress
09/16/2025Fire-Resistance Rated ConstructionJohn Cunninghamprogress
09/16/2025Insulation placement and R valuesJohn Cunninghamenergy_progress
09/16/2025Lighting in dwelling unitsJohn Cunninghamenergy_progress
08/15/2025Fire-Resistant Penetrations and JointsStephen Shishkospecial
02/25/2024Fire-Resistance Rated ConstructionJohn Cunninghamprogress
02/25/2024Fire-Resistant Penetrations and JointsStephen Shishkospecial
02/25/2024Energy Code Compliance InspectionsJohn Cunninghamprogress
02/25/2024Insulation placement and R valuesJohn Cunninghamenergy_progress
02/25/2024Lighting in dwelling unitsJohn Cunninghamenergy_progress
01/31/2024Fire-Resistant Penetrations and JointsStephen Shishkospecial
04/21/2023Sprinkler Systemsbassam (sam) rimawispecial
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026B00863612-I1Request digital key ↗
08/26/2026B00820958-I1Request digital key ↗
08/26/2026B00820958-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits7
▸DOB NOWLPC Approval/Permit7
08/14/2026B00835807-I1Open ↗
08/14/2026B00835807-P1Open ↗
08/13/2026B00820958-P2Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/20/2026B00835807-I1Open ↗
08/20/2026B00835807-P1Open ↗
08/13/2026B00820958-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026B00820958-P1Open ↗
08/26/2026B00863612-I1Open ↗
08/26/2026B00835807-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026B00820958-P1Open ↗
08/26/2026B00820958-P1Open ↗
08/22/2026B00820958-P2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/13/2026B00820958-I1Open ↗
08/13/2026B00820958-P2Open ↗
08/13/2026B00820958-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00820958-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/13/2026B00820958-I1Open ↗
08/13/2026B00835807-I1Open ↗
08/13/2026B00863612-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents14
▸DOB NOWDHCR Document8
08/14/2026B00835807-I1Open ↗
08/14/2026B00835807-P1Open ↗
08/13/2026B00835807-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProperty Ownership Certification3
08/13/2026B00820958-P1Open ↗
08/13/2026B00820958-P2Open ↗
08/13/2026B00820958-I1Open ↗
▸DOB NOWProof of Historic Building3
08/14/2026B00835807-I1Open ↗
08/14/2026B00835807-P1Open ↗
08/13/2026B00835807-P2Open ↗