DOB08/10/2020FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED CRACKED BRICK AND MORTAR JOINTS AROUND THE 4TH FLOOR WINDOWS ON THE FACADE OF EXPOSURE #1. DAMAGED FACADE NON COMPLIANT TO CODE.
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB03/18/1993V-DOB VIOLATION - ACTIVE
ECB06/13/20163 FLUE PIPE NOT SEALEDCOMPLETELY TO CHIMNEY. (B)MANUAL RESET LOW WATE R CUTOFF MISSING. (50A) NO SPILL SWITCH ON BOILER. (50B)CONTROLS & GAUGE MUST BE PIPE INDEPENDENT FROM LOW WATER CUTOFF.Nothing owed — awaiting certificate of correction
Office with commercial, 1-6 stories · 1,835 sf lot · 3.67 FAR built · Flood zone X