3 Open Violations 0 unresolved · 3 paperwork only▸
ECB06/18/2026OBSERVED A NEW HOT WATER BOILER BEING INSTALLED AT THE FIRST FLOOR MECHANICAL ROOM. ALSO BATHS AT FLOORS 1 AND 2 WITH NEW TUBS AND SHOWER BODIES INSTALLED. RANGES AT KITCHENS FLOORS 1 AND 2 HAVE NEW YELLOW FLEXNothing owed — awaiting certificate of correction
ECB06/18/2026OBSERVED YEALLOW ROMEX WIRING AT 2ND FL KITCHEN, AND BATH CEILING. AT OTHER BATH LOCATION BX CABLE PROTRUDING FROM CEILING. SEVERAL LOCATIONS WITH NEW METAL "OCTAGON" BOXES IN CEILINGS WITH OPEN ENDED WIRES. OBNothing owed — awaiting certificate of correction
ECB01/13/2010FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER. FAILURE TO COMPLY WITH LAW FOR DRAINAGE SYSTEM. NOTED: A PVC PIPE ABOUT 1 1/2" DIA OF WHITE COLOR COMING FROM BLDG ROOTED TO ROOF LADDER & A GI PIPE ABOUT 1" ONothing owed — awaiting certificate of correction
Two family frame · 4,725 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.