1950Year Built
1Stories
B2Building Class
R3AZoning
2,682 sfGross Floor Area
2Units
1 Open Violation ▸
Two family frame · 4,500 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/08/2014$560K—Private party → Private party$209/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PONDOSA DESIGN INC301/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PONDOSA DESIGN INC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DHC CONTRACTING INCGeneral Contractor303/21/2026
ANTENUCCI MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PONDOSA DESIGN INC.5126301/23/2024
Building Lifecycle
All (42)Filed (3)Permit Issued (2)Signed Off (2)Violation (1)Inspection (7)Objection (22)Special Inspection (5)
10/24/2024
Signed off — Alteration
Install new 3-piece bathroom in the basement. Relocate existing water heater, furnace and boiler
X00653974-I1
10/24/2024
Signed off — Alteration
Interior renovation; Remove partition walls; Install new fire rated partitions and doors; remove stairs from 001 to basement; Install wood joist to sealed the opening. No change in use, egress and occupancy.
X00653980-I1
02/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MANG WONG
02/12/2024
Objection resolved — Addressed
02/12/2024
Objection resolved — Addressed
01/26/2024
Objection raised — Other
01/26/2024
Objection raised — Other
01/23/2024
Filed — Alteration
Install new 3-piece bathroom in the basement. Relocate existing water heater, furnace and boiler
X00653974-P1
11/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MANG WONG
07/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/05/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/29/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/22/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/16/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/15/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/15/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/09/2023
Permit issued — Plumbing
X00653974-I1-PL
06/09/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/15/2022
Filed — Alteration
Install new 3-piece bathroom in the basement. Relocate existing water heater, furnace and boiler
X00653974-I1
08/10/2022
Permit issued — Structural
X00653980-I1-GC-CX
06/06/2022
Objection raised — Other
06/06/2022
Objection resolved — Addressed
01/24/2022
Objection raised — Other
01/24/2022
Objection resolved — Addressed
01/24/2022
Objection raised — Zoning
01/24/2022
Objection resolved — Addressed
01/24/2022
Objection raised — Other
01/24/2022
Objection resolved — Addressed
01/24/2022
Objection raised — Zoning
01/24/2022
Objection resolved — Addressed
01/24/2022
Objection raised — Other
01/24/2022
Objection resolved — Addressed
01/24/2022
Objection raised — Mechanical
01/24/2022
Objection resolved — Addressed
01/24/2022
Objection raised — Fire_Protection
01/24/2022
Objection resolved — Addressed
01/24/2022
Objection raised — Scope
01/24/2022
Objection resolved — Addressed
01/07/2022
Filed — Alteration
Interior renovation; Remove partition walls; Install new fire rated partitions and doors; remove stairs from 001 to basement; Install wood joist to sealed the opening. No change in use, egress and occupancy.
X00653980-I1
12/27/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
MANG WONG
12/27/2021
Special inspection requirement — Mechanical Systems
MANG WONG
12/27/2021
Special inspection requirement — Final
IHAB SHAFEI
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offANTENUCCI MECHANICAL INC06/09/2023
DOB NOWStructuralSigned-offALEXANDER CHAN08/10/2022
BIS—ISSUEDEXECUTOR/PART OWNER05/08/1996
1 project · most recent 08/11/2022
General Wiring
FiledStatusContractorScope
08/11/2022CompleteAPPROVED ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/05/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/29/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/22/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/16/2023Fail-Final General Construction Non-Directive 14FailView ↗
06/15/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/13/2024Fire-Resistant Penetrations and JointsMANG WONGspecial
11/15/2023Fire-Resistant Penetrations and JointsMANG WONGspecial
12/27/2021Structural Stability – Alterations of existing buildingsMANG WONGspecial
12/27/2021Mechanical SystemsMANG WONGspecial
12/27/2021FinalIHAB SHAFEIprogress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/23/2026X00653974-I1Request digital key ↗
08/15/2026X00653974-P1Request digital key ↗
08/15/2026X00653980-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/23/2026X00653974-I1Open ↗
08/13/2026X00653974-P1Open ↗
08/13/2026X00653980-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026X00653974-P1Open ↗
08/28/2026X00653980-I1Open ↗
08/24/2026X00653974-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026X00653980-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026X00653974-I1Open ↗
08/13/2026X00653974-P1Open ↗
08/13/2026X00653980-I1Open ↗