← Back
BuildNYC
Elevator apt, artists in residence
94 READE STREET
MANHATTAN · BIN 1001595
💬 Discuss this project
1861Year Built
5Stories
D2Building Class
C6-2AZoning
7,006 sfGross Floor Area
5Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Elevator apt, artists in residence · Owner of record: Manhattan Realty Company 1 · 1,525 sf lot · 4.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 5Marob Management CORP9p · 2 filings · 20 docs
Floor 4Marob Management CORP10p · 3 filings · 20 docs
Floor 3Marob Management CORP10p · 3 filings · 20 docs
Floor 2Marob Management CORP10p · 3 filings · 20 docs
Floor 1Marob Management CORP40p · 3 filings · 20 docs
CellarMarob Management CORP38p · 3 filings · 20 docs
Sub-CellarMarob Management CORP6p · 2 filings · 20 docs
Site & exteriorMarob Management CORP3p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Manhattan Realty Company 13103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Dxa Studio212/02/2024
Jack Green Associates605/13/2024
Rodney D. Gibble Consulting Engineering101/19/2024
Peter F. Farinella Architect305/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JP EXPEDITING+DRAFTING Services1203/21/2026
Stacie Scorcia Company803/21/2026
Peter F Farinella Architect P403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
First Standard ConstructionGeneral Contractor1407/08/2026
Demar PlumbingPlumbing407/08/2026
Demar Plumbingspecialty_contractor307/08/2026
All Tech Mechanicalspecialty_contractor203/21/2026
Demar MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Chen Engineering Services1826412/02/2024
Munyc Architecture5224412/02/2024
Jack Green Associates422505/13/2024
Kadan5956101/19/2024
Peter F. Farinella Architects2635205/21/2021
Building Lifecycle
10/16/2026
Signed off — Alteration CO
Structural Modifications of floor to create new floor opening for new egress stairway from cellar to 1st floor.
M00895883-S1
07/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/11/2025
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
M00895883-I1-GC
09/17/2025
VC9: failed to maintain required egress
FDNY_NOV violation · closed
12/11/2024
Permit issued — General Construction
M00895883-I1-GC
93 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedFirst Standard Construction12/11/2024
DOB NOWStructuralSigned-offFirst Standard Construction11/01/2024
DOB NOWMechanical SystemsSigned-offAll Tech Mechanical01/31/2023
DOB NOWGeneral ConstructionSigned-offFirst Standard Construction06/23/2022
DOB NOWGeneral ConstructionSigned-offFirst Standard Construction05/09/2022
DOB NOWPlumbingSigned-offDemar Mechanical03/31/2022
DOB NOWGeneral ConstructionSigned-offFirst Standard Construction07/21/2021
DOB NOWPlumbingSigned-offDemar Plumbing05/26/2021
DOB NOWGeneral ConstructionSigned-offFirst Standard Construction05/13/2021
DOB NOWPlumbingSigned-offDemar Plumbing08/04/2020
DOB NOWPlumbingSigned-offDemar Plumbing12/05/2019
DOB NOWMechanical SystemsSigned-offDemar Plumbing12/03/2019
DOB NOWMechanical SystemsSigned-offDemar Plumbing10/23/2019
DOB NOWPlumbingSigned-offDemar Plumbing08/21/2019
BISOTISSUEDFirst Standard Construction03/17/2023
BISOTISSUEDFirst Standard Construction03/17/2023
BISPLISSUEDDemar Mechanical06/17/2022
BISOTISSUEDFirst Standard Construction03/14/2022
BISOTISSUEDFirst Standard Construction03/14/2022
BISOTISSUEDFirst Standard Construction03/03/2022
BISOTISSUEDFirst Standard Construction01/19/2022
BISOTISSUEDKM Construction Management12/24/2019
BISBLISSUEDDemar Plumbing12/03/2019
BISPLISSUEDCK Plumbing & Mechanical03/27/2019
BISOTISSUEDKM Construction Management02/25/2019
BISOTISSUEDKM Construction Management02/25/2019
BISOTISSUEDMarob Management07/19/2011
BISOTISSUEDMarob Management08/11/2009
BISOTISSUEDAshton Remodeling & Construction09/28/2006
BISMHISSUEDAshton Remodeling & Construction09/28/2006
BISOTISSUEDMarob Management05/23/2006
1 project · most recent 12/02/2024
Sprinkler System
FiledStatusContractorScope
12/02/2024——Sprinkler System
1 project · most recent 12/02/2024
FiledStatusContractorScope
12/02/2024———
2 projects · most recent 04/28/2025
General Wiring
FiledStatusContractorScope
04/28/2025CompleteYork Electrical Contractors—
09/09/2019Permit IssuedR-2 ElectricGeneral Wiring
1 project · most recent 12/02/2024
Steel Concrete Wood
FiledStatusContractorScope
12/02/2024Permit IssuedFirst Standard ConstructionSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
12/11/2024Fire-Resistant Penetrations and JointsHENLIA CHENspecial
12/11/2024Fire-Resistance Rated ConstructionHENLIA CHENprogress
12/11/2024Tenant Protection Plan ComplianceMatthias Muellerspecial
11/06/2024Fire-Resistance Rated ConstructionHENLIA CHENprogress
11/06/2024Tenant Protection Plan ComplianceMatthias Muellerspecial
11/06/2024Fire-Resistant Penetrations and JointsHENLIA CHENspecial
01/16/2024Tenant Protection Plan ComplianceMatthias Muellerspecial
01/09/2024Tenant Protection Plan ComplianceMatthias Muellerspecial
01/08/2024Fire-Resistant Penetrations and JointsHENLIA CHENspecial
01/08/2024Sprinkler SystemsJACK GREENspecial
01/03/2024Structural Steel - DetailsGEORGE OZAETAspecial
01/03/2024Structural Steel - WeldingGEORGE OZAETAspecial
01/03/2024Subgrade InspectionsGEORGE OZAETAspecial
01/03/2024Concrete - Cast-In-PlaceGEORGE OZAETAspecial
01/03/2024Sprayed fire-resistant materialsHENLIA CHENspecial
01/03/2024Structural Steel - High Strength BoltingGEORGE OZAETAspecial
01/03/2024Structural Stability – Alterations of existing buildingsGEORGE OZAETAspecial
01/02/2024FinalGEORGE OZAETAprogress
02/25/2022Mechanical SystemsJACK GREENspecial
02/25/2022FinalJACK GREENprogress
04/15/2021Fire-Resistance Rated ConstructionPeter Farinellaprogress
04/15/2021FinalPeter Farinellaprogress
04/15/2021Fire-Resistant Penetrations and JointsPeter Farinellaspecial
03/03/2020Fire-Resistant Penetrations and JointsJACK GREENspecial
03/03/2020FinalJACK GREENprogress
Latest 25 of 29.
212 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account