← Back
One family attached or semi-detached
940 BROOKLYN AVENUE
BROOKLYN · East Flatbush-Erasmus · BIN 3109474
💬 Discuss this project
1910Year Built
2Stories
A5Building Class
R5Zoning
1,534 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,125 sf lot · 0.72 FAR built · Flood zone X
Locations of Work
Electrical
Roof2p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES A CLANCY104/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC DESIGN AND CONSULTING LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RIVERTOWN SOLAR LLCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAMES A CLANCY9176104/14/2025
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Violation (2)Special Inspection (5)
04/25/2025
Permit issued — Solar
B01207407-I1-SL
04/14/2025
Filed — Alteration
INSTALLATION OF NEW PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
B01207407-I1
04/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Clancy
04/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Clancy
04/08/2025
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
04/08/2025
Special inspection requirement — Final
James Clancy
04/08/2025
Special inspection requirement — Air barrier - visual inspection
James Clancy
09/01/1993
Violation issued (ECB, closed)
Construction
03/20/1991
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedRIVERTOWN SOLAR LLC04/25/2025
1 project · most recent 03/10/2025
FiledStatusContractorScope
03/10/2025CompleteAMBER ELECTL CONTNG INC—
1 project · most recent 04/14/2025
FiledStatusContractorScope
04/14/2025Permit IssuedRIVERTOWN SOLAR LLC22 panels, 9.02 kw, 462.5 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/08/2025Fire-Resistant Penetrations and JointsJames Clancyspecial
04/08/2025Structural Stability – Alterations of existing buildingsJames Clancyspecial
04/08/2025Energy Code Compliance InspectionsJames Clancyprogress
04/08/2025FinalJames Clancyprogress
04/08/2025Air barrier - visual inspectionJames Clancyenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026B01207407-I1Request digital key ↗
08/21/2026B01207407-P1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B01207407-P1Open ↗
08/13/2026B01207407-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B01207407-I1Open ↗
08/23/2026B01207407-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B01207407-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B01207407-P1Open ↗
08/13/2026B01207407-I1Open ↗