Predominantly retail with other uses
940 NEW YORK AVENUE
BROOKLYN · BIN 3109335
💬 Discuss this project
1931Year Built
3Stories
K4Building Class
R6Zoning
3,915 sfGross Floor Area
5Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: 3202 CHURCH LLC. · 2,666 sf lot · 1.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof3p · 1 filing · 20 docs
Floor 43p · 1 filing · 20 docs
Floor 34p · 1 filing · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Mezzanine6p · 1 filing · 20 docs
Cellar9p · 1 filing · 20 docs
1 job · most recent 11/24/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/24/2025Permit IssuedPURCISIVE INCHeating and Air Conditioning Systems
Heat / Cool
Fujitsu AOUH24KWAS3 24,000 BTU · Condensing Unit ×21
AOUH12LMAS1 14,500 BTU · Condensing Unit ×18
1 job · most recent 11/24/2025
Sprinkler System
FiledStatusContractorScope
11/24/2025Signed-offTARGET PIPING NY LLCSprinkler System
1 job · most recent 11/24/2025
Storm Water/Sanitary
FiledStatusContractorScope
11/24/2025Signed-offTARGET PIPING NY LLCStorm, Water/Sanitary
2 jobs · most recent 12/03/2025
General Wiring
FiledStatusContractorScope
12/03/2025CompleteFIRST QUALITY ELECL LLCGeneral Wiring
05/28/2025CompleteHIGH QUALITY ELEC.OF NYC—
1 job · most recent 11/24/2025
Steel Masonry
FiledStatusContractorScope
11/24/2025Permit IssuedPURCISIVE INCSteel, Masonry
1 job · most recent 11/24/2025
Fence Scaffold
FiledStatusContractorScope
11/24/2025Permit IssuedPURCISIVE INCFence, Scaffold
Building Lifecycle
All (163)Filed (16)Permit Issued (11)Signed Off (9)Violation (5)Inspection (12)Objection (80)Special Inspection (30)
03/27/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/20/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/20/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/25/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120733-I1
B01120733-S2
12/24/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120733-I1
B01120733-S3
12/15/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
12/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/12/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
12/11/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120733-I1
B01120733-S1
12/09/2025
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. No change in use, egress and/or occupancy with this application.
B01227491-I1
12/09/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120733-I1
B01120733-Z2
12/05/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/05/2025
Special inspection requirement — Heating Systems
FAHAD FATEH
12/05/2025
Special inspection requirement — Shutoff dampers
FAHAD FATEH
12/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
12/05/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
12/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
12/05/2025
Special inspection requirement — Final
FAHAD FATEH
12/05/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
12/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
12/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/05/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/04/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
12/04/2025
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
12/02/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120733-I1
B01120733-S9
12/01/2025
Objection raised — Scope
12/01/2025
Objection resolved — Addressed
11/24/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120733-I1
B01120733-P6
11/24/2025
Special inspection requirement — Heating Systems
FAHAD FATEH
11/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
11/24/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
11/24/2025
Special inspection requirement — Shutoff dampers
FAHAD FATEH
11/24/2025
Special inspection requirement — Final
FAHAD FATEH
11/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
11/24/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
11/24/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
11/20/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120733-I1
B01120733-P5
11/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/18/2025
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
11/18/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
11/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/13/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120733-I1
B01120733-S4
11/12/2025
Inspection — Fail-Final SP - Up to 9 Requested Floors
Fail
View inspection ↗
10/30/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120733-I1
B01120733-P4
10/30/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/29/2025
Permit issued — General Construction
B01120733-I1-GC
10/17/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120733-I1
B01120733-S8
09/17/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120733-I1
B01120733-P3
09/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/15/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
09/15/2025
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
08/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
08/07/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01120733-I1
B01120733-Z1
08/06/2025
Objection resolved — Addressed
07/31/2025
Objection raised — Scope
07/29/2025
Violation issued (ECB, closed)
Construction
07/25/2025
Permit issued — Supported Scaffold
B01120733-Z2-SF
Latest 60 of 163 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PURCISIVE503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHOSEN MEP, CORP.811/24/2025
KNF SERVICES CROP107/09/2025
BRIAN GOLDMAN, ARCHITECT105/16/2025
NIKOLAI KATZ ARCHITECT303/17/2025
KCE CONSULTING ENGINEERING PLLC312/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC3003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PURCISIVE INCGeneral Contractor1107/08/2026
TARGET PIPING NY LLCFire Protection107/08/2026
APEX GROUP NY CORPGeneral Contractor104/09/2026
N TECH DESIGN OF AMERICAGeneral Contractor107/08/2026
B&B MECH PLBG & HTG LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161311/24/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPURCISIVE INC10/29/2025
DOB NOWSupported ScaffoldSigned-offPURCISIVE INC07/25/2025
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC06/23/2025
DOB NOWSidewalk ShedSigned-offAPEX GROUP NY CORP05/20/2025
DOB NOWStructuralSigned-offPURCISIVE INC05/02/2025
DOB NOWEarth WorkSigned-offPURCISIVE INC04/30/2025
DOB NOWSupport of ExcavationSigned-offPURCISIVE INC04/22/2025
DOB NOWGeneral ConstructionPermit IssuedPURCISIVE INC04/22/2025
DOB NOWMechanical SystemsSigned-offPURCISIVE INC04/22/2025
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC04/11/2025
DOB NOWConstruction FenceSigned-offN TECH DESIGN OF AMERICA03/11/2025
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
03/27/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/20/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/20/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/15/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
12/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/12/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
12/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/12/2025Fail-Final SP - Up to 9 Requested FloorsFailView ↗
10/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/15/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/10/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
12/05/2025Heating SystemsFAHAD FATEHspecial
12/05/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
12/05/2025FinalFAHAD FATEHprogress
12/05/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
12/05/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
12/05/2025Shutoff dampersFAHAD FATEHenergy_progress
12/05/2025Mechanical SystemsFAHAD FATEHspecial
12/05/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/05/2025Maintenance informationFAHAD FATEHenergy_progress
12/05/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
12/04/2025Post-installed AnchorsFAHAD FATEHspecial
12/04/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/04/2025Sprinkler SystemsFAHAD FATEHspecial
11/24/2025Heating SystemsFAHAD FATEHspecial
11/24/2025Maintenance informationFAHAD FATEHenergy_progress
11/24/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
11/24/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
11/24/2025Shutoff dampersFAHAD FATEHenergy_progress
11/24/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
11/24/2025Mechanical SystemsFAHAD FATEHspecial
11/24/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/24/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
11/24/2025FinalFAHAD FATEHprogress
11/18/2025Sprinkler SystemsFAHAD FATEHspecial
11/18/2025Post-installed AnchorsFAHAD FATEHspecial
Latest 25 of 62.
▾Documents — 76 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/21/2026B01227491-I1Request digital key ↗
08/19/2026B01120733-P4Request digital key ↗
08/19/2026B01120733-P3Request digital key ↗
Showing 3 of 16 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026B01120733-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026B01120733-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/15/2026B01120733-I1Open ↗
▸Seals & Professional Certifications34
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/21/2026B01227491-I1Open ↗
08/19/2026B01120733-P5Open ↗
08/19/2026B01120733-P4Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026B01120733-S3Open ↗
08/29/2026B01120733-P3Open ↗
08/29/2026B01120733-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026B01120733-S3Open ↗
08/28/2026B01120733-I1Open ↗
08/28/2026B01120733-I1Open ↗
Showing 3 of 9 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/15/2026B01120733-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Trees Site Plan1
08/15/2026B01120733-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026B01120733-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/15/2026B01120733-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/19/2026B01120733-S8Open ↗
08/19/2026B01120733-P4Open ↗
08/19/2026B01120733-P3Open ↗
Showing 3 of 12 on file for this type
▸Inspections & Test Reports1
▸DOB NOWConcrete Testing Exception Report1
08/13/2026B01120733-S9Open ↗
▸Other Documents6
▸DOB NOWAdjoining Owners Notification2
08/13/2026B01120733-S9Open ↗
08/13/2026B01120733-S8Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026B01120733-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026B01120733-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/15/2026B01120733-I1Open ↗
▸DOB NOWFinal Survey1
08/15/2026B01120733-I1Open ↗