💬 Discuss this project
0Year Built
—Stories
V0Building Class
R7-1Zoning
0 sfGross Floor Area
0Units
2 Active Violations ▸
Zoned residential, not Manhattan · Owner of record: Woodycrest 1 · 5,685 sf lot · 0 FAR built · Flood zone X
Locations of Work
StructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsNew 13-story Concrete Residential BuildingUnder Construction3 filings
RoofTemporary roof protection installationUnder Construction1 filing
Site & exteriorTemporary overhead protection installationUnder Construction3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZLB3610/04/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Nikolai Katz Architect409/16/2026
Vasilios Artemiou PE609/02/2026
Soni Engineering Consulting806/25/2026
Elevated Engineering NYC606/10/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Express Filing2303/21/2026
AE Design Solution803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Lead It BuildersGeneral Contractor1708/07/2026
Core Scaffold SystemsScaffold407/08/2026
Prime Piping & HeatingFire Protection308/08/2026
Power Direct ElectricElectrical203/22/2026
A. M. Plumbing CompanyPlumbing208/14/2026
Solas ElectricalElectrical103/22/2026
Mes ConstructionPlumbing108/25/2026
Lead It BuildersScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161409/16/2026
Building Lifecycle
All (111)Filed (24)Permit Issued (22)Violation (4)Inspection (7)Objection (21)Special Inspection (30)Tax Incentive (3)
09/29/2026
Objection raised — Other
09/25/2026
Objection resolved — Resolved
09/24/2026
Objection raised — Other
09/22/2026
Violation issued (ECB, open)
Construction
09/16/2026
Filed — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01255584-I1
X01255584-A4
09/08/2026
Special inspection requirement — Protection of exposed foundation insulation
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Air barrier — testing
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Electrical motors and elevators
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Exterior lighting power
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Lighting in dwelling units
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Air barrier continuity plan testing
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
09/02/2026
Filed — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01255584-I1
X01255584-A1
09/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
09/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
09/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
09/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
09/01/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
09/01/2026
485-x construction completed
08/24/2026
Permit issued — Plumbing
X48008297-S7-PL
08/21/2026
Violation issued (ECB, closed)
Unknown
08/07/2026
Permit issued — Standpipe
X01255584-S5-EW-SD
08/07/2026
Permit issued — Sprinklers
X01255584-S5-EW-SP
08/06/2026
Permit issued — Plumbing
X01255584-S7-PL
08/06/2026
Permit issued — Curb Cut
X01255584-S9-CC
08/01/2026
Violation issued (ECB, open)
Unknown
07/17/2026
Filed — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01255584-I1
X01255584-P7
07/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
07/15/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
07/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
07/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
07/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
07/07/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/01/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)
Certified
View inspection ↗
06/25/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01371972-P2
06/15/2026
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
06/15/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
06/12/2026
Permit issued — Standpipe
X01255584-S6-EW-SD
06/12/2026
Special inspection requirement — Structural Steel - Welding
06/12/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
SHAHRIAR QUAYYUM
06/11/2026
Permit issued — Mechanical Systems
X01255584-S4-MS
06/10/2026
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01345803-P1
06/10/2026
Filed — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01255584-I1
X01255584-P4
06/08/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01371972-P1
06/02/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01342255-P1
05/26/2026
Permit issued — Structural
X01255584-S1-ST
05/18/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/18/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/27/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMes Construction08/24/2026
DOB NOWStandpipePermit IssuedPrime Piping & Heating08/07/2026
DOB NOWSprinklersPermit IssuedPrime Piping & Heating08/07/2026
DOB NOWPlumbingPermit IssuedA. M. Plumbing Company08/06/2026
DOB NOWCurb CutPermit IssuedLead It Builders08/06/2026
DOB NOWStandpipePermit IssuedPrime Piping & Heating06/12/2026
DOB NOWMechanical SystemsPermit IssuedLead It Builders06/11/2026
DOB NOWStructuralPermit IssuedLead It Builders05/26/2026
DOB NOWSupport of ExcavationPermit IssuedLead It Builders04/23/2026
DOB NOWGeneral ConstructionPermit IssuedLead It Builders04/22/2026
DOB NOWGeneral ConstructionPermit IssuedLead It Builders03/23/2026
DOB NOWSupported ScaffoldPermit IssuedCore Scaffold Systems03/16/2026
DOB NOWGeneral ConstructionPermit IssuedLead It Builders02/18/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCore Scaffold Systems01/22/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCore Scaffold Systems01/20/2026
DOB NOWSupport of ExcavationPermit IssuedLead It Builders01/08/2026
DOB NOWSidewalk ShedPermit IssuedCore Scaffold Systems01/07/2026
DOB NOWStructuralPermit IssuedLead It Builders12/31/2025
DOB NOWPlumbingPermit IssuedA. M. Plumbing Company12/22/2025
DOB NOWEarth WorkPermit IssuedLead It Builders12/17/2025
DOB NOWSupport of ExcavationPermit IssuedLead It Builders12/16/2025
DOB NOWConstruction FencePermit IssuedLead It Builders11/12/2025
1 project · most recent 09/16/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/16/2026Permit IssuedLead It BuildersHeating and Air Conditioning Systems
Heat / Cool
Amana PTH073J30 7,000 BTU · Heat Pump Outdoor ×129
PTH123J30 11,600 BTU · Heat Pump Outdoor ×64
PTH153J30 14,400 BTU · Heat Pump Outdoor ×37
PTH093J30 9,000 BTU · Heat Pump Outdoor ×24
1 project · most recent 09/16/2026
Sprinkler System
FiledStatusContractorScope
09/16/2026Permit IssuedPrime Piping & HeatingSprinkler System
1 project · most recent 09/16/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/16/2026Permit IssuedA. M. Plumbing CompanyGas, Storm, Water/Sanitary
5 projects · most recent 04/27/2026
General Wiring
FiledStatusContractorScope
04/27/2026Permit IssuedPower Direct Electric—
01/13/2026Permit IssuedSolas Electrical—
11/24/2025Permit IssuedPower Direct ElectricGeneral Wiring
11/24/2025Permit IssuedPower Direct Electric101 meters, 101 new_meters
11/24/2025Permit IssuedPower Direct Electric—
1 project · most recent 09/16/2026
Concrete
FiledStatusContractorScope
09/16/2026Permit IssuedPrime Piping & HeatingConcrete
3 projects · most recent 09/16/2026
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
09/16/2026Permit IssuedPrime Piping & HeatingFence
06/25/2026Permit IssuedCore Scaffold SystemsScaffold
06/02/2026Permit IssuedCore Scaffold SystemsSidewalk Shed
1 project · most recent 09/16/2026
Earthwork
FiledStatusContractorScope
09/16/2026Permit IssuedPrime Piping & HeatingEarthwork
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/07/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/01/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
06/15/2026Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
06/15/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
05/18/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/18/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/27/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 93
DateRequirementInspectorRole
09/08/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
09/08/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
09/08/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
09/08/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
09/08/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
09/08/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
09/08/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
09/08/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
09/08/2026Air barrier continuity plan testingSHAHRIAR QUAYYUMenergy_progress
09/08/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
09/08/2026Electrical motors and elevatorsSHAHRIAR QUAYYUMenergy_progress
09/08/2026MeteringSHAHRIAR QUAYYUMenergy_progress
09/08/2026Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
09/08/2026Air barrier — testing SHAHRIAR QUAYYUMenergy_progress
09/08/2026Lighting in dwelling unitsSHAHRIAR QUAYYUMenergy_progress
09/08/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
09/08/2026Exterior lighting powerSHAHRIAR QUAYYUMenergy_progress
09/08/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
09/01/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
09/01/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
09/01/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
09/01/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
09/01/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
07/15/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
07/15/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
Latest 25 of 93.
▾Documents — 166 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch23
08/17/2026X01345815-I1Request digital key ↗
08/16/2026X01342255-I1Request digital key ↗
08/16/2026X01342255-P1Request digital key ↗
Showing 3 of 23 on file for this type
▸Zoning, Tax Lot & Property Records59
▸DOB NOWRestrictive Declaration/Easement 118
09/22/2026X01255584-A4Open ↗
09/22/2026X01255584-A2Open ↗
09/22/2026X01255584-A1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWRestrictive Declaration/Easement 218
09/22/2026X01255584-A4Open ↗
09/22/2026X01255584-A2Open ↗
09/22/2026X01255584-A1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWRestrictive Declaration/Easement 318
09/22/2026X01255584-A2Open ↗
09/22/2026X01255584-A4Open ↗
09/22/2026X01255584-A1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram2
09/22/2026X01255584-A4Open ↗
08/16/2026X01255584-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
09/22/2026X01255584-A4Open ↗
08/16/2026X01255584-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026X01255584-I1Open ↗
▸Seals & Professional Certifications60
▸DOB NOWDPL-1: Design Professional Seal & Signature26
09/22/2026X01255584-A1Open ↗
09/22/2026X01255584-A4Open ↗
09/22/2026X01255584-A2Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/23/2026X01255584-A2Open ↗
09/23/2026X01255584-A1Open ↗
09/23/2026X01255584-A4Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026X01255584-A2Open ↗
09/23/2026X01255584-A1Open ↗
09/23/2026X01255584-A4Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/01/2025240363815Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/16/2026X01255584-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/16/2026X01255584-I1—
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
09/22/2026X01255584-A4Open ↗
08/16/2026X01255584-I1Open ↗
▸BISSTREET TREES SITE PLAN1
02/20/2026240363815Open ↗
▸BISBPP: STREET TREES SITE PLAN1
02/25/2026240363815Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/16/2026X01255584-I1Open ↗
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT6
08/16/2026X01255584-S2Open ↗
08/16/2026X01255584-P3Open ↗
08/16/2026X01255584-S3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/16/2026X01255584-S2Open ↗
08/16/2026X01255584-S3Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/01/2025240363815Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
09/22/2026X01255584-A4Open ↗
08/16/2026X01255584-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
09/22/2026X01255584-A4Open ↗
08/16/2026X01255584-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/16/2026X01255584-S3Open ↗
08/16/2026X01255584-S2Open ↗
▸DOB NOWProperty Ownership Certification2
09/22/2026X01255584-A4Open ↗
08/16/2026X01255584-I1Open ↗