← Back
Elevator apt, semi-fireproof with stores
941 57 STREET
BROOKLYN · BIN 3139950
💬 Discuss this project
2022Year Built
6Stories
D7Building Class
—Zoning
13,587 sfGross Floor Area
14Units
0 Open ViolationsFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 941 PROPERTY LLC · 4,000 sf lot · 3.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof6p · 4 filings · 20 docs
Floor 56p · 4 filings · 20 docs
Floor 45p · 3 filings · 20 docs
Floor 33p · 2 filings · 12 docs
Floor 2
Floor 19p · 5 filings · 20 docs
Cellar6p · 4 filings · 20 docs
Basement7p · 3 filings · 20 docs
3 jobs · most recent 05/10/2024
General Wiring
FiledStatusContractorScope
05/10/2024CompleteA.C. MORGAN ELECTRICGeneral Wiring
08/01/2022CompleteKWONG MING ELECTRIC INC—
04/25/2022CompleteTOP SHELF ELECTRIC CORP—
Building Lifecycle
All (118)Filed (15)Permit Issued (15)Signed Off (9)Violation (16)Inspection (9)Objection (24)Special Inspection (30)
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/23/2024
Signed off — Alteration
SUBMIT PLUMBING WORK ON CELLAR, BASEMENT, 1ST THRU 5TH FLOOR, ROOF AND OPEN SPACE, IN CONJUNCTION WITH NB APPLICATION #321457712.
B00344446-I1
01/23/2024
Signed off — Alteration
PROPOSED INSTALL SPRINKLER SYSTEM AT CELLAR, BASEMENT, 1ST THRU 5TH FLOOR, ROOF AND OPEN SPACE, IN CONJUNCTION WITH NB APPLICATION #321457712.
B00344448-I1
01/19/2024
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
01/11/2024
Signed off — Alteration
SUBMIT MECHANICAL WORK ON CELLAR, BASEMENT, 1ST THRU 5TH FLOOR, ROOF AND OPEN SPACE, IN CONJUNCTION WITH NB #321457712.
B00344447-I1
01/11/2024
Signed off — Alteration
SUBMIT BOILER WORK ON 5TH FLOOR BOILER ROOM AND ROOF, IN CONJUNCTION WITH NB APPLICATION #321457712.
B00344456-I1
01/11/2024
Signed off — Alteration
SUBMIT STRUCTURAL WORK ON CELLAR, BASEMENT, 1ST ~ 5TH FLOOR AND ROOF, IN CONJUNCTION WITH NB APPLICATION #321457712.
B00344445-I1
01/11/2024
Permit issued — Structural
B00344445-I1-ST
01/03/2024
Filed — Alteration
SUBMIT MECHANICAL WORK ON CELLAR, BASEMENT, 1ST THRU 5TH FLOOR, ROOF AND OPEN SPACE, IN CONJUNCTION WITH NB #321457712.
B00344447-P1
12/29/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/26/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/27/2023
Filed — Alteration
PROPOSED INSTALL SPRINKLER SYSTEM AT CELLAR, BASEMENT, 1ST THRU 5TH FLOOR, ROOF AND OPEN SPACE, IN CONJUNCTION WITH NB APPLICATION #321457712.
B00344448-P1
11/27/2023
Special inspection requirement — Sprinkler Systems
Fran Huang
11/27/2023
Special inspection requirement — Sprinkler Systems
Fran Huang
11/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
11/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
11/02/2023
Filed — Alteration
SUBMIT PLUMBING WORK ON CELLAR, BASEMENT, 1ST THRU 5TH FLOOR, ROOF AND OPEN SPACE, IN CONJUNCTION WITH NB APPLICATION #321457712.
B00344446-P2
11/02/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Fran Huang
11/02/2023
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
11/02/2023
Special inspection requirement — HVAC and service water heating equipment
Fran Huang
11/02/2023
Special inspection requirement — HVAC and service water heating system controls
Fran Huang
11/02/2023
Special inspection requirement — HVAC insulation and sealing
Fran Huang
11/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
10/25/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/10/2023
Filed — Alteration
SUBMIT PLUMBING WORK ON CELLAR, BASEMENT, 1ST THRU 5TH FLOOR, ROOF AND OPEN SPACE, IN CONJUNCTION WITH NB APPLICATION #321457712.
B00344446-P1
10/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
10/10/2023
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
10/10/2023
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
10/10/2023
Special inspection requirement — Maintenance information
Fran Huang
10/10/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
10/10/2023
Special inspection requirement — Heating Systems
Fran Huang
10/04/2023
Filed — Alteration
SUBMIT BOILER WORK ON 5TH FLOOR BOILER ROOM AND ROOF, IN CONJUNCTION WITH NB APPLICATION #321457712.
B00344456-P1
09/29/2023
Special inspection requirement — HVAC and service water heating equipment
Fran Huang
09/29/2023
Special inspection requirement — HVAC insulation and sealing
Fran Huang
09/29/2023
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
09/29/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Fran Huang
09/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
09/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
09/29/2023
Special inspection requirement — Heating Systems
Fran Huang
09/29/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
09/29/2023
Special inspection requirement — Maintenance information
Fran Huang
09/29/2023
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
09/29/2023
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
09/29/2023
Special inspection requirement — HVAC and service water heating system controls
Fran Huang
08/31/2023
Signed off — Alteration
B00344444-I1
08/31/2023
Permit issued — Mechanical Systems
B00344447-I1-MS
03/29/2023
Permit issued — Sprinklers
B00344448-I1-EW-SP
03/28/2023
Signed off — Alteration
PROPOSED INSTALLATION OF SUPPORT OF SCAFFOLD AS PER PLANS. IN CONJUNCTION WITH DOB NB APPLICATION #: 321457712.REMEDY TO CURE DOB VIOLATIONS #:39505637Y.NO CHANGE IN USE, OCCUPANCY, BULK, OR EGRESS
B07997693-I1
03/28/2023
Signed off — Alteration
B00797949-I1
02/10/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/10/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/10/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/10/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/10/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/02/2023
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
B00725672-I1
01/27/2023
Permit issued — Boiler Equipment
B00344456-I1-BE
12/29/2022
Permit issued — Plumbing
B00344446-I1-PL
12/29/2022
Permit issued — Construction Fence
B00344444-I1-FN
11/21/2022
Violation issued (ECB, closed)
Construction
09/16/2022
Permit issued — Supported Scaffold
B07997693-I1-SF
Latest 60 of 118 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
941 PROPERTY6607/08/2026
UNIVERSAL SYSTEMS407/08/2026
99 CONSTRUCTION1403/22/2026
CONSTRUCTION MANAGEMENT103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/31/2018$3.5M—Private party → 941 PROPERTY LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL ENGINEERING P.C.1301/03/2024
JIMENEZ BUILDING CONSULTING LLC109/02/2022
NAVI STRUCTURAL ENGINEERING, PLLC104/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z BUILDING NY2603/21/2026
EUROCELT EXPEDITING, INC203/21/2026
JRL SKYLINE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
99 CONSTRUCTION INCGeneral Contractor1107/08/2026
A C MORGAN ELECTRIC 002978General Contractor803/22/2026
H&Z BUILDING CONSULTING IGeneral Contractor403/21/2026
AMC PLBG, HTG & CLNG, INCPlumbing307/08/2026
DYKER SOLUTIONS INCGeneral Contractor207/08/2026
HPL ENGINEERING P CGeneral Contractor103/22/2026
NEW YORK STANDARD MECH COFire Protection107/08/2026
A.C. MORGAN ELECTRICElectrical103/22/2026
UNIVERSAL SYSTEMS INCGeneral Contractor107/08/2026
WINWAY DEVELOPMENT LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC56131301/03/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offSONG DONG01/11/2024
DOB NOWMechanical SystemsSigned-offDYKER SOLUTIONS08/31/2023
DOB NOWSprinklersSigned-offNEW YORK STANDARD MECH CO03/29/2023
DOB NOWBoiler EquipmentSigned-offAMC PLBG, HTG & CLNG, INC01/27/2023
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC12/29/2022
DOB NOWConstruction FenceSigned-offDYKER SOLUTIONS12/29/2022
DOB NOWSupported ScaffoldSigned-offSONG DONG09/16/2022
DOB NOWConstruction FenceSigned-offSONG DONG09/09/2022
DOB NOWProtection and Mechanical MethodsSigned-offSONG DONG09/06/2022
DOB NOWConstruction FenceSigned-offWINWAY DEVELOPMENT LLC08/09/2022
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC07/03/2022
DOB NOWConstruction FenceSigned-offH&Z BUILDING CONSULTING I06/29/2022
DOB NOWSidewalk ShedSigned-offUNIVERSAL SYSTEMS INC04/28/2022
DOB NOWStructuralSigned-offSONG DONG12/27/2021
DOB NOWConstruction FenceSigned-offH&Z BUILDING CONSULTING I07/06/2021
BIS—ISSUEDDYKER SOLUTIONS INC08/30/2023
BIS—ISSUEDDYKER SOLUTIONS INC01/10/2023
BIS—ISSUED99 CONSTRUCTION INC08/26/2022
BIS—ISSUED99 CONSTRUCTION INC01/13/2022
BIS—ISSUEDH&Z BUILDING CONSULTING I11/03/2021
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
01/19/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
12/29/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/26/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/25/2023Pass-Final Boiler Equipment InspectionPassView ↗
02/10/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/10/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/10/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/10/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
11/27/2023Sprinkler SystemsFran Huangspecial
11/27/2023Sprinkler SystemsFran Huangspecial
11/27/2023Fire-Resistant Penetrations and JointsFran Huangspecial
11/27/2023Fire-Resistant Penetrations and JointsFran Huangspecial
11/02/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFran Huangspecial
11/02/2023Energy Code Compliance InspectionsFran Huangprogress
11/02/2023HVAC and service water heating equipment Fran Huangenergy_progress
11/02/2023HVAC and service water heating system controls Fran Huangenergy_progress
11/02/2023HVAC insulation and sealing Fran Huangenergy_progress
11/02/2023Fire-Resistant Penetrations and JointsFran Huangspecial
10/10/2023Fire-Resistant Penetrations and JointsFran Huangspecial
10/10/2023HVAC-R and service water heating equipmentFran Huangenergy_progress
10/10/2023HVAC-R and service water heating system controlsFran Huangenergy_progress
10/10/2023Maintenance informationFran Huangenergy_progress
10/10/2023HVAC-R and service water piping design and insulationFran Huangenergy_progress
10/10/2023Heating SystemsFran Huangspecial
09/29/2023HVAC and service water heating equipment Fran Huangenergy_progress
09/29/2023HVAC insulation and sealing Fran Huangenergy_progress
09/29/2023Energy Code Compliance InspectionsFran Huangprogress
09/29/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFran Huangspecial
09/29/2023Fire-Resistant Penetrations and JointsFran Huangspecial
09/29/2023Fire-Resistant Penetrations and JointsFran Huangspecial
09/29/2023Heating SystemsFran Huangspecial
09/29/2023HVAC-R and service water piping design and insulationFran Huangenergy_progress
09/29/2023Maintenance informationFran Huangenergy_progress
Latest 25 of 38.
▾Documents — 223 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00344446-P2Request digital key ↗
09/02/2026B00344446-P1Request digital key ↗
09/02/2026B00344446-I1Request digital key ↗
▸DOB NOWPlans/Sketch3
08/29/2026B00725672-I1Request digital key ↗
08/28/2026B00797949-I1Request digital key ↗
08/15/2026B07997693-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/02/2026B00344456-I1Request digital key ↗
09/02/2026B00344456-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00344447-I1Request digital key ↗
09/02/2026B00344447-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/26/2026B00344448-P1Request digital key ↗
08/26/2026B00344448-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/02/2026B00344445-I1Request digital key ↗
09/02/2026B00344445-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00344444-I1Request digital key ↗
▸Applications & Permits31
▸BISPLAN / WORK APPROVAL APPLICATION24
09/13/2024322114788Open ↗
05/29/2024321457712Open ↗
05/24/2024321457712Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION5
08/31/2023321457712Open ↗
01/11/2023321457712Open ↗
01/05/2023321457712Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
08/07/2020340725237Open ↗
04/30/2020340725237Open ↗
▸Zoning, Tax Lot & Property Records14
▸BISZONING EXHIBIT I: CERTIFICATION3
09/16/2024322114788Open ↗
02/02/2024322115153Open ↗
05/18/2020321457712Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
09/16/2024322114788Open ↗
02/02/2024322115153Open ↗
▸BISZONING DIAGRAM2
01/21/2022321457712Open ↗
01/07/2022321457712Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
03/18/2020321457712Open ↗
03/18/2020321457712Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
09/16/2024322114788Open ↗
02/02/2024322115153Open ↗
▸BISVERIFY TAX LOT1
01/11/2024321457712Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
05/18/2020321457712Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/11/2024321457712Open ↗
▸Seals & Professional Certifications37
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/28/2026B00797949-I1Open ↗
08/13/2026B00344448-P1Open ↗
08/13/2026B00344456-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/23/2026B07997693-I1Open ↗
09/21/2026B00344456-P1Open ↗
08/29/2026B00344446-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/21/2026B00344456-P1Open ↗
08/29/2026B00344446-P1Open ↗
08/29/2026B00344446-P1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
01/07/2022321457712Open ↗
03/13/2020321457712Open ↗
02/21/2020321457712Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
04/30/2020340725237Open ↗
▸Trade Schedules & Equipment4
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
01/11/2024321457712Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
05/24/2024321457712Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
05/24/2024321457712Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
01/11/2024321457712Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST3
05/18/2020321457712Open ↗
04/30/2020340725237Open ↗
02/21/2020321457712Open ↗
▸BISSTREET TREE SIGNOFF2
02/07/2024340725237Open ↗
01/11/2024321457712Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
04/30/2020340725237Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/07/2020340725237Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
05/18/2020321457712Open ↗
▸Environmental & Asbestos1
▸BISRODENT CONTROL1
11/04/2021322087843Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
01/07/2022321457712Open ↗
01/07/2022321457712Open ↗
02/21/2020321457712Open ↗
▸BISINTERIOR LIGHTING POWER1
01/11/2024321457712Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/11/2024321457712Open ↗
▸BISFENESTRATION AREAS1
01/11/2024321457712Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/11/2024321457712Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/11/2024321457712Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/11/2024321457712Open ↗
▸BISLIGHTING CONTROLS1
01/11/2024321457712Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/11/2024321457712Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00344456-I1Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY5
07/19/2020321457712Open ↗
07/19/2020321457712Open ↗
05/18/2020321457712Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
03/12/2024321457712Open ↗
01/07/2022321457712Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/11/2024321457712Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/11/2024321457712Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
01/11/2024321457712Open ↗
▸BISMASONRY1
01/11/2024321457712Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
01/11/2024321457712Open ↗
▸BISSOIL REPORT1
05/18/2020321457712Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
05/18/2020321457712Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
01/07/2022321457712Open ↗
▸Approvals, Objections & Sign-offs26
▸BISLETTERS - SUPPORTING DOCUMENTATION19
09/19/2024322114788Open ↗
09/16/2024322114788Open ↗
09/16/2024322114788Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
05/29/2024321457712Open ↗
05/24/2024321457712Open ↗
05/23/2024321457712Open ↗
Showing 3 of 6 on file for this type
▸BISHOUSE CONNECTION SIGNOFF1
01/11/2024321457712Open ↗
▸Cost, Insurance & Ownership7
▸BISPROJECT-SPECIFIC GL INSURANCE4
08/31/2023321457712Open ↗
01/11/2023321457712Open ↗
01/05/2023321457712Open ↗
Showing 3 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
08/31/2023321457712Open ↗
01/05/2023321457712Open ↗
01/07/2022321457712Open ↗
▸Filing & Intake Forms25
▸BISADDITIONAL INFORMATION13
05/30/2024321457712Open ↗
05/28/2024321457712Open ↗
04/24/2024321457712Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING COVER SHEET6
09/16/2024322114788Open ↗
09/13/2024322114788Open ↗
02/06/2024322115153Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM5
01/05/2023321457712Open ↗
01/15/2022321457712Open ↗
01/07/2022321457712Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
04/30/2020340725237Open ↗
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
02/06/2024322115153Open ↗
08/31/2023321457712Open ↗
08/31/2023321457712Open ↗
▸BISPLOT DIAGRAM3
09/16/2024322114788Open ↗
02/02/2024322115153Open ↗
02/21/2020321457712Open ↗
▸BISSHUTOFF DAMPERS1
01/11/2024321457712Open ↗
▸BISLOCAL LAW - SUPPPORTING DOCUMENTATION1
03/18/2020321457712Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
05/29/2020321457712Open ↗
▸BISLOWEST FLOOR ELEVATION1
01/11/2024321457712Open ↗
▸BISUNDERPINNING (2014)1
01/11/2024321457712Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
01/11/2024321457712Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
04/30/2020340725237Open ↗