Elevator apt, fireproof without stores
Roosevelt I (NYCHA)
942 DEKALB AVENUE · Bedford-Stuyvesant (East) · BIN 3043216
💬 Discuss this project
1962Year Built
15Stories
D3Building Class
R6Zoning
148,000 sfGross Floor Area
248Units
LL97 Covered0 Open ViolationsFISP: UNSAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 45,000 sf lot · 3.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Permit Issued — active, not yet Signed-off
CellarUnder Construction67p · 4 filings · 20 docs
Site & exteriorUnder Construction11p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA4209/01/2026
NYC Housing Authority1603/22/2026
AMERICAN VENTILATION SERVICES407/08/2026
NEW YORK CITY HOUSING AUTHORITY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAKHANI & JORDAN704/10/2026
OSPINO ENGINEERING PLLC105/13/2024
YSRAEL A. SEINUK, P.C.211/10/2023
IKRA CONSULTING LLC110/26/2023
AK CONSULTING SERVICES, INC110/26/2023
STEPHEN B JACOBS GROUP207/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STEPHEN B JACOBS GROUP1803/21/2026
HIERARCH-E203/21/2026
AK CONSULTING SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYNAMIC US, INCGeneral Contractor1507/08/2026
ROMA SCAFFOLDING INCGeneral Contractor1407/08/2026
DYNAMIC CONTRACTING CORPPlumbing607/08/2026
DYNAMIC ELEC. SYSTEM INCElectrical103/22/2026
HYLTON, EElectrical103/21/2026
JONATHAN LANDAUElectrical103/21/2026
ORTEGA-CEDENO, DAVIDElectrical103/21/2026
ANZELM KRYSAElectrical103/21/2026
RZYMSKI, MACIEJElectrical103/21/2026
SEGNA, MARIOElectrical103/21/2026
SEZEKCOL ELECTRIC INCElectrical103/22/2026
RUBIN GLICKElectrical103/21/2026
ARROW STEEL INCElectrical103/21/2026
CHRYSSIADIS, NICOLASElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DISTINCT ENGINEERING SOLU2641306/11/2021
Building Lifecycle
All (137)Filed (14)Permit Issued (21)Signed Off (1)Facade (FISP) (18)Violation (35)Inspection (6)Objection (12)Special Inspection (30)
09/16/2026
Signed off — Alteration
INTERIOR RENOVATION IN CELLAR TANK ROOM
B00455897-I1
05/12/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/10/2026
Filed — Alteration
NYCHA BOILER - REMOVAL AND REPLACEMENT OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR INTERIOR RENOVATION OF MECHANICAL EQUIPMENT ROOM.
B00439912-P5
04/09/2026
Special inspection requirement — HVAC insulation and sealing
Ramnarayan Tirumala
04/09/2026
Special inspection requirement — HVAC and service water heating system controls
Ramnarayan Tirumala
04/09/2026
Special inspection requirement — HVAC and service water heating equipment
Ramnarayan Tirumala
04/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Ramnarayan Tirumala
04/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ramnarayan Tirumala
03/31/2026
Filed — Alteration
NYCHA BOILER - REMOVAL AND REPLACEMENT OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR INTERIOR RENOVATION OF MECHANICAL EQUIPMENT ROOM.
B00439912-P4
01/26/2026
Permit issued — Construction Fence
B00952919-I1-FN
01/26/2026
Permit issued — Sidewalk Shed
B00952922-I1-SH
01/22/2026
Permit issued — Plumbing
B00439912-I1-PL
01/22/2026
Permit issued — General Construction
B00455897-I1-GC
01/22/2026
Permit issued — Mechanical Systems
B00438675-I1-MS
12/23/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/26/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/19/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/08/2025
Permit issued — Structural
B00434688-I1-ST
02/18/2025
Permit issued — Mechanical Systems
B00438675-I1-MS
02/18/2025
Permit issued — Plumbing
B00439912-I1-PL
02/18/2025
Permit issued — General Construction
B00455897-I1-GC
01/23/2025
Permit issued — Sidewalk Shed
B00952922-I1-SH
01/23/2025
Permit issued — Construction Fence
B00952919-I1-FN
11/07/2024
Permit issued — Structural
B00434688-I1-ST
10/10/2024
Special inspection requirement — Electrical motors
YAZAN YANES
10/10/2024
Special inspection requirement — Duct leakage testing
YAZAN YANES
10/10/2024
Special inspection requirement — Shutoff dampers
YAZAN YANES
10/10/2024
Special inspection requirement — Maintenance information
YAZAN YANES
10/10/2024
Special inspection requirement — HVAC and service water heating equipment
YAZAN YANES
10/10/2024
Special inspection requirement — HVAC and service water heating system controls
YAZAN YANES
10/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAZAN YANES
10/10/2024
Special inspection requirement — Heating Systems
YAZAN YANES
10/10/2024
Special inspection requirement — Mechanical Systems
YAZAN YANES
10/10/2024
Special inspection requirement — Chimneys and vents
YAZAN YANES
10/10/2024
Special inspection requirement — Final
Ramnarayan Tirumala
10/10/2024
Special inspection requirement — Energy Code Compliance Inspections
Ramnarayan Tirumala
10/10/2024
Special inspection requirement — HVAC insulation and sealing
YAZAN YANES
10/07/2024
Filed — Alteration
NYCHA BOILER - REMOVAL AND REPLACEMENT OF VACUUM PUMP UNIT, CONDENSATE RETURN UNIT WITH MECHANICAL PIPING AND DUCT-WORK FOR INTERIOR RENOVATION OF MECHANICAL EQUIPMENTROOM.
B00438675-P1
10/04/2024
Filed — Alteration
NYCHA BOILER - REMOVAL AND REPLACEMENT OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR INTERIOR RENOVATION OF MECHANICAL EQUIPMENT ROOM.
B00439912-P3
10/03/2024
Permit issued — Sidewalk Shed
B00952922-I1-SH
10/03/2024
Permit issued — Construction Fence
B00952919-I1-FN
10/01/2024
Special inspection requirement — Electrical motors
Ramnarayan Tirumala
10/01/2024
Special inspection requirement — Chimneys and vents
Ramnarayan Tirumala
10/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ramnarayan Tirumala
10/01/2024
Special inspection requirement — Heating Systems
Ramnarayan Tirumala
10/01/2024
Special inspection requirement — Mechanical Systems
Ramnarayan Tirumala
10/01/2024
Special inspection requirement — Energy Code Compliance Inspections
Ramnarayan Tirumala
10/01/2024
Special inspection requirement — Final
Ramnarayan Tirumala
10/01/2024
Special inspection requirement — Duct leakage testing
Ramnarayan Tirumala
10/01/2024
Special inspection requirement — HVAC and service water heating equipment
Ramnarayan Tirumala
10/01/2024
Special inspection requirement — HVAC and service water heating system controls
Ramnarayan Tirumala
10/01/2024
Special inspection requirement — HVAC insulation and sealing
Ramnarayan Tirumala
10/01/2024
Special inspection requirement — Maintenance information
Ramnarayan Tirumala
08/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/11/2024
Filed — Alteration
NYCHA BOILER - REMOVAL AND REPLACEMENT OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR INTERIOR RENOVATION OF MECHANICAL EQUIPMENT ROOM.
B00439912-P1
05/14/2024
Permit issued — Suspended Scaffold
B01050608-I1-SC
05/13/2024
Filed — Alteration
Suspended scaffold installation and use and bucket hoist as per plans filed herewith.
B01050608-I1
02/29/2024
Permit issued — Plumbing
B00439912-I1-PL
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedROMA SCAFFOLDING INC01/26/2026
DOB NOWSidewalk ShedPermit IssuedROMA SCAFFOLDING INC01/26/2026
DOB NOWPlumbingSigned-offDYNAMIC CONTRACTING CORP01/22/2026
DOB NOWGeneral ConstructionSigned-offDYNAMIC US, INC01/22/2026
DOB NOWMechanical SystemsPermit IssuedDYNAMIC US, INC01/22/2026
DOB NOWStructuralSigned-offDYNAMIC US, INC10/08/2025
DOB NOWMechanical SystemsPermit IssuedDYNAMIC US, INC02/18/2025
DOB NOWPlumbingSigned-offDYNAMIC CONTRACTING CORP02/18/2025
DOB NOWGeneral ConstructionSigned-offDYNAMIC US, INC02/18/2025
DOB NOWSidewalk ShedPermit IssuedROMA SCAFFOLDING INC01/23/2025
DOB NOWConstruction FencePermit IssuedROMA SCAFFOLDING INC01/23/2025
DOB NOWStructuralSigned-offDYNAMIC US, INC11/07/2024
DOB NOWSidewalk ShedPermit IssuedROMA SCAFFOLDING INC10/03/2024
DOB NOWConstruction FencePermit IssuedROMA SCAFFOLDING INC10/03/2024
DOB NOWSuspended ScaffoldPermit IssuedAMERICAN VENTILATION SERV05/14/2024
DOB NOWPlumbingSigned-offDYNAMIC CONTRACTING CORP02/29/2024
DOB NOWMechanical SystemsPermit IssuedDYNAMIC US, INC02/28/2024
DOB NOWGeneral ConstructionSigned-offDYNAMIC US, INC02/28/2024
DOB NOWStructuralSigned-offDYNAMIC US, INC11/14/2023
DOB NOWConstruction FencePermit IssuedROMA SCAFFOLDING INC10/27/2023
DOB NOWSidewalk ShedPermit IssuedROMA SCAFFOLDING INC10/27/2023
BISEQISSUEDUNIVERSAL CONSTRUCTION RE09/06/2016
BISOTISSUEDUNIVERSAL CONSTRUCTION RE06/07/2016
BISOTISSUEDUNIVERSAL CONSTRUCTION RE06/07/2016
BISEQISSUEDUNIVERSAL CONSTRUCTION RE05/10/2016
BISOTISSUEDUNIVERSAL CONSTRUCTION RE02/03/2016
BISOTISSUEDUNIVERSAL CONSTRUCTION RE02/03/2016
BISOTISSUEDUNIVERSAL CONSTRUCTION RE01/28/2016
BISOTISSUEDUNIVERSAL CONSTRUCTION RE01/28/2016
BISEQISSUEDUNIVERSAL CONSTRUCTION RE01/21/2016
BISEQISSUEDUNIVERSAL CONSTRUCTION RE09/12/2015
BISOTISSUEDUNIVERSAL CONSTRUCTION RE06/16/2015
BISOTISSUEDUNIVERSAL CONSTRUCTION RE06/16/2015
BISEQISSUEDUNIVERSAL CONSTRUCTION RE05/13/2015
BISEQISSUEDUNIVERSAL CONSTRUCTION RE01/21/2015
BISEQISSUEDUNIVERSAL CONSTRUCTION RE10/27/2014
BISEQISSUEDVIKRANT CONTRACTING & BUILDER05/21/2014
BISEQISSUEDTECHNICO CONSTRUCTION02/27/2014
BISEQISSUEDTECHNICO CONSTRUCTION03/01/2013
BISEQISSUEDTECHNICO CONSTRUCTION03/06/2012
+ 8 more permits on file
1 project · most recent 04/10/2026
Gas Storm
FiledStatusContractorScope
04/10/2026Signed-offDYNAMIC CONTRACTING CORPGas, Storm
6 projects · most recent 02/17/2025
General Wiring
FiledStatusContractorScope
02/17/2025Permit IssuedPOLARIS ELEC'L CONST CORPGeneral Wiring
01/02/2025CancelledDYNAMIC ELEC. SYSTEM INCGeneral Wiring
10/23/2023Permit IssuedHYLAN DATACOM & ELECL LLC—
02/22/2023CompleteTRU-VAL ELECTRIC CORP.General Wiring
10/09/2020CompleteJEMCO ELECT. CONTRS INC—
02/07/2020CompleteSEZEKCOL ELECTRIC INCGeneral Wiring
1 project · most recent 11/10/2023
Concrete
FiledStatusContractorScope
11/10/2023Signed-offDYNAMIC US, INCConcrete
1 project · most recent 10/26/2023
Fence
FiledStatusContractorScope
10/26/2023Permit IssuedROMA SCAFFOLDING INCFence
1 project · most recent 05/13/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
05/13/2024Permit IssuedAMERICAN VENTILATION SERVSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/12/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/23/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/13/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
04/09/2026HVAC insulation and sealing Ramnarayan Tirumalaenergy_progress
04/09/2026HVAC and service water heating system controls Ramnarayan Tirumalaenergy_progress
04/09/2026HVAC and service water heating equipment Ramnarayan Tirumalaenergy_progress
04/09/2026Energy Code Compliance InspectionsRamnarayan Tirumalaprogress
04/09/2026Fire-Resistant Penetrations and JointsRamnarayan Tirumalaspecial
10/10/2024Electrical motorsYAZAN YANESenergy_progress
10/10/2024Duct leakage testing YAZAN YANESenergy_progress
10/10/2024Shutoff dampersYAZAN YANESenergy_progress
10/10/2024Maintenance informationYAZAN YANESenergy_progress
10/10/2024HVAC and service water heating equipment YAZAN YANESenergy_progress
10/10/2024HVAC and service water heating system controls YAZAN YANESenergy_progress
10/10/2024Fire-Resistant Penetrations and JointsYAZAN YANESspecial
10/10/2024Heating SystemsYAZAN YANESspecial
10/10/2024Mechanical SystemsYAZAN YANESspecial
10/10/2024Chimneys and ventsYAZAN YANESspecial
10/10/2024FinalRamnarayan Tirumalaprogress
10/10/2024Energy Code Compliance InspectionsRamnarayan Tirumalaprogress
10/10/2024HVAC insulation and sealing YAZAN YANESenergy_progress
10/01/2024Electrical motorsRamnarayan Tirumalaenergy_progress
10/01/2024Chimneys and ventsRamnarayan Tirumalaspecial
10/01/2024Fire-Resistant Penetrations and JointsRamnarayan Tirumalaspecial
10/01/2024Heating SystemsRamnarayan Tirumalaspecial
10/01/2024Mechanical SystemsRamnarayan Tirumalaspecial
10/01/2024Energy Code Compliance InspectionsRamnarayan Tirumalaprogress
10/01/2024FinalRamnarayan Tirumalaprogress
Latest 25 of 51.
▾Documents — 205 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch - Plumbing5
08/17/2026B00439912-P1Request digital key ↗
08/17/2026B00439912-I1Request digital key ↗
08/17/2026B00439912-P5Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/23/2026B00438675-P1Request digital key ↗
08/23/2026B00438675-I1Request digital key ↗
08/15/2026B00438675-P1Request digital key ↗
▸DOB NOWPlans/Sketch3
08/26/2026B00952922-I1Request digital key ↗
08/26/2026B00952919-I1Request digital key ↗
08/25/2026B01050608-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/01/2026B00455897-I1Request digital key ↗
09/01/2026B00455897-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/26/2026B00434688-I1Request digital key ↗
08/15/2026B00434688-P1Request digital key ↗
▸Applications & Permits27
▸BISWORK PERMIT APPLICATION16
02/05/2016320958647Open ↗
02/05/2016320958647Open ↗
02/03/2016320958647Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
05/12/2015340241376Open ↗
01/18/2015340221735Open ↗
10/24/2014340179513Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications74
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION26
03/17/2017340221735Open ↗
03/17/2017340221735Open ↗
02/13/2017320958647Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/01/2026B00455897-I1Open ↗
09/01/2026B00455897-P1Open ↗
08/26/2026B00952922-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026B00455897-I1Open ↗
09/01/2026B00439912-P1Open ↗
09/01/2026B00439912-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B00455897-I1Open ↗
09/01/2026B00439912-P1Open ↗
08/31/2026B00439912-P3Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
05/12/2015340241376Open ↗
01/18/2015340221735Open ↗
10/24/2014340179513Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/12/2015340241376Open ↗
01/18/2015340221735Open ↗
10/24/2014340179513Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
05/12/2015340241376Open ↗
01/18/2015340221735Open ↗
10/24/2014340179513Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/14/2010320187123Open ↗
03/26/2010320142172Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
07/14/2010320187123Open ↗
03/26/2010320142172Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE3
06/21/2012320142172Open ↗
06/09/2012320142172Open ↗
12/10/2011320142172Open ↗
▸BISSCHEDULE B - PLUMBING1
03/26/2010320142172Open ↗
▸Safety & Tenant Protection9
▸DOB NOWTenant Protection Plan9
08/17/2026B00439912-P5Open ↗
08/17/2026B00439912-P4Open ↗
08/13/2026B00439912-P1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/01/2026B00455897-I1Open ↗
08/26/2026B00434688-I1Open ↗
08/23/2026B00438675-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/26/2010320142172Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
01/31/2017320958647Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/14/2010320187123Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
02/13/2017320958647Open ↗
02/07/2017320958647Open ↗
01/20/2017320958647Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections1
02/23/2015320958647Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/20/2017320958647Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
01/18/2015340221735Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/12/2015340241376Open ↗
01/18/2015340221735Open ↗
10/24/2014340179513Open ↗
▸Approvals, Objections & Sign-offs42
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
09/01/2026B00455897-I1Open ↗
09/01/2026B00455897-P1Open ↗
08/26/2026B00952922-I1Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
03/17/2017340221735Open ↗
02/13/2017320958647Open ↗
02/07/2017320958647Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)7
08/17/2026B00439912-P5Open ↗
08/17/2026B00439912-P4Open ↗
08/13/2026B00439912-P3Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
06/11/2014320924309Open ↗
03/03/2014320187123Open ↗
07/25/2012320142172Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/13/2026B00455897-I1Open ↗
08/13/2026B00439912-I1Open ↗
08/13/2026B00434688-I1Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
06/11/2014320924309Open ↗
07/14/2010320187123Open ↗
03/26/2010320142172Open ↗
▸BISSHED LETTER1
01/28/2016340221735Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
03/07/2013320187123Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
01/31/2017320958647Open ↗
01/31/2017320958647Open ↗
01/20/2017320958647Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET3
06/11/2014320924309Open ↗
07/14/2010320187123Open ↗
03/26/2010320142172Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
05/12/2015340241376Open ↗
01/18/2015340221735Open ↗
10/24/2014340179513Open ↗
▸BISADDITIONAL INFORMATION1
02/03/2016320958647Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/31/2017320958647Open ↗
▸DOB NOWCalculations1
08/13/2026B01050608-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01050608-I1Open ↗