← Back
Predominantly retail with other uses
942 FLATBUSH AVENUE
BROOKLYN · BIN 3117168
💬 Discuss this project
1931Year Built
3Stories
K4Building Class
C4-4AZoning
4,856 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: MICHAEL MOSHE REALTY LLC · 1,942 sf lot · 2.5 FAR built · Flood zone X
Locations of Work
Architecture
Floor 213p · 1 filing · 20 docs
Floor 114p · 2 filings · 20 docs
Cellar16p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KFC503/21/2026
COLANDRA PROPERTIES203/21/2026
KFC Y059-067103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/14/2023$1.4M—942 FLATBUSH AVENUE, LP → MICHAEL MOSHE REALTY LLC$288/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN ENGINEERING CONSULTANT PLLC1705/26/2026
GEE2000 ARCHITECT P.C.204/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BARRAN DESIGNS1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC CONSTRUCTION INCGeneral Contractor1107/08/2026
DYNAMIC PLBG & SPRKLR CORPlumbing207/08/2026
THREE90 INCGeneral Contractor107/08/2026
AMM GEN'L CONTRACTING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FLUSHING ENGINEERING SERV43731705/26/2026
GEE2000 ARCHITECT P.C.691104/01/2024
Building Lifecycle
All (94)Filed (19)Permit Issued (10)Signed Off (7)Violation (1)Inspection (15)Objection (12)Special Inspection (30)
06/01/2026
Special inspection requirement — Metering
KY FU
06/01/2026
Special inspection requirement — Energy Code Compliance Inspections
KY FU
06/01/2026
Special inspection requirement — Maintenance information
KY FU
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
06/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
KY FU
06/01/2026
Special inspection requirement — Fenestration air leakage
KY FU
06/01/2026
Special inspection requirement — Interior lighting power
KY FU
06/01/2026
Special inspection requirement — Air barrier - visual inspection
KY FU
06/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
KY FU
06/01/2026
Special inspection requirement — Fenestration areas
KY FU
06/01/2026
Special inspection requirement — Insulation placement and R values
KY FU
05/26/2026
Filed — Alteration CO
SUBSEQUENT APPLICATION FILED HEREWITH FOR MECHANICAL WORK TYPE, IN CONJUNCTION TO ALT B00926155-I1
B00926155-P9
05/10/2026
Special inspection requirement — Insulation placement and R values
KY FU
05/10/2026
Special inspection requirement — Air barrier - visual inspection
KY FU
05/10/2026
Special inspection requirement — Maintenance information
KY FU
05/10/2026
Special inspection requirement — Metering
KY FU
05/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
05/10/2026
Special inspection requirement — Energy Code Compliance Inspections
KY FU
05/10/2026
Special inspection requirement — Interior lighting power
KY FU
05/10/2026
Special inspection requirement — Fenestration areas
KY FU
05/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
KY FU
05/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
KY FU
05/10/2026
Special inspection requirement — Fenestration air leakage
KY FU
12/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/09/2025
Filed — Alteration CO
SUBSEQUENT APPLICATION FILED HEREWITH FOR MECHANICAL WORK TYPE, IN CONJUNCTION TO ALT B00926155-I1
B00926155-P8
03/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
KY FU
03/03/2025
Special inspection requirement — Energy Code Compliance Inspections
KY FU
03/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
03/03/2025
Special inspection requirement — Maintenance information
KY FU
03/03/2025
Special inspection requirement — Insulation placement and R values
KY FU
03/03/2025
Special inspection requirement — Fenestration air leakage
KY FU
03/03/2025
Special inspection requirement — Air barrier - visual inspection
KY FU
03/03/2025
Special inspection requirement — Fenestration areas
KY FU
11/21/2024
Signed off — Alteration
PL work is filed.
B01023171-S1
11/21/2024
Signed off — Alteration
PL work is filed.
B01023171-I1
08/21/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/18/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/19/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/10/2024
Filed — Alteration CO
SUBSEQUENT APPLICATION FILED HEREWITH FOR MECHANICAL WORK TYPE, IN CONJUNCTION TO ALT B00926155-I1
B00926155-P7
04/22/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/18/2024
Filed — Alteration CO
SUBSEQUENT APPLICATION FILED HEREWITH FOR MECHANICAL WORK TYPE, IN CONJUNCTION TO ALT B00926155-I1
B00926155-P5
04/15/2024
Permit issued — General Construction
B01023171-I1-GC
04/15/2024
Permit issued — Plumbing
B01023171-S1-PL
04/08/2024
Filed — Alteration
PL work is filed.
B01023171-S1
04/01/2024
Filed — Alteration
PL work is filed.
B01023171-I1
03/18/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/14/2024
Signed off — Alteration CO
SUBSEQUENT APPLICATION FILED HEREWITH FOR MECHANICAL WORK TYPE, IN CONJUNCTION TO ALT B00926155-I1
B00926155-S1
03/14/2024
Signed off — Alteration CO
SUBSEQUENT APPLICATION FILED HEREWITH FOR MECHANICAL WORK TYPE, IN CONJUNCTION TO ALT B00926155-I1
B00926155-S2
03/12/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/04/2024
Filed — Alteration CO
SUBSEQUENT APPLICATION FILED HEREWITH FOR MECHANICAL WORK TYPE, IN CONJUNCTION TO ALT B00926155-I1
B00926155-P3
03/04/2024
Filed — Alteration CO
SUBSEQUENT APPLICATION FILED HEREWITH FOR MECHANICAL WORK TYPE, IN CONJUNCTION TO ALT B00926155-I1
B00926155-P1
02/20/2024
Signed off — Alteration
SUBSEQUENT APPLICATION FILED HEREWITH FOR MECHANICAL WORK TYPE, IN CONJUNCTION TO ALT JOB B00910408
B00910408-S2
02/20/2024
Signed off — Alteration
SUBSEQUENT APPLICATION FILED HEREWITH FOR MECHANICAL WORK TYPE, IN CONJUNCTION TO ALT JOB B00910408
B00910408-S1
02/19/2024
Filed — Alteration CO
SUBSEQUENT APPLICATION FILED HEREWITH FOR MECHANICAL WORK TYPE, IN CONJUNCTION TO ALT B00926155-I1
B00926155-P4
02/16/2024
Signed off — Alteration
SUBSEQUENT APPLICATION FILED HEREWITH FOR MECHANICAL WORK TYPE, IN CONJUNCTION TO ALT JOB B00910408
B00910408-I1
02/12/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTHREE90 INC04/15/2024
DOB NOWPlumbingSigned-offAMM GEN'L CONTRACTING INC04/15/2024
DOB NOWMechanical SystemsSigned-offNYC CONSTRUCTION INC12/01/2023
DOB NOWGeneral ConstructionPermit IssuedNYC CONSTRUCTION INC12/01/2023
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS10/17/2023
DOB NOWGeneral ConstructionSigned-offNYC CONSTRUCTION INC09/21/2023
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS09/21/2023
DOB NOWMechanical SystemsSigned-offNYC CONSTRUCTION INC09/20/2023
DOB NOWMechanical SystemsSigned-offNYC CONSTRUCTION INC08/28/2023
DOB NOWGeneral ConstructionSigned-offNYC CONSTRUCTION INC08/15/2023
BISOTISSUEDNEW YORK SIGN CONT10/19/2006
BISMHISSUEDABCO MAINTENANCE INC02/08/2005
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO04/24/2003
BISEQISSUEDKELTECH CONST INC01/28/2003
BISOTISSUEDKELTECH CONST INC01/28/2003
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO02/25/2002
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO02/25/2002
BISOTISSUEDULTIMATE SIGNS&DESIGNS CO02/25/2002
BISFPISSUEDCHIEF FIRE PREVENTION & MECH08/29/2001
BISMHISSUEDVASSALOTTI ASSOCIATES ARCHITECTS06/26/1995
BISFPISSUEDMASTER FIRE PREVENTION SYSTEMS09/08/1993
BISFPISSUEDLUND FIRE PRODUCTS CO. INC.10/21/1991
1 project · most recent 05/26/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/26/2026Permit IssuedNYC CONSTRUCTION INCAir Conditioning Systems, Ventilation Systems
Cooling
Cooper & Hunter CH-HPR36M-230VO 36,000 BTU · Heat Pump Outdoor ×4
Ventilation
Greenheck AE-10-420-A8 250 CFM · Exhaust Fan ×4
1 project · most recent 05/26/2026
Water/Sanitary
FiledStatusContractorScope
05/26/2026Signed-offDYNAMIC PLBG & SPRKLR CORWater/Sanitary
1 project · most recent 02/12/2024
General Wiring
FiledStatusContractorScope
02/12/2024CompleteLENS ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
12/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/18/2024Fail-Final CND-Occupancy InspectionFailView ↗
06/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/22/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/22/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/12/2024Fail-Final CND-Occupancy InspectionFailView ↗
01/31/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/13/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 112
DateRequirementInspectorRole
06/01/2026Fire-Resistant Penetrations and JointsKY FUspecial
06/01/2026Fenestration air leakageKY FUenergy_progress
06/01/2026Maintenance informationKY FUenergy_progress
06/01/2026Fenestration areasKY FUenergy_progress
06/01/2026Air barrier - visual inspectionKY FUenergy_progress
06/01/2026Insulation placement and R valuesKY FUenergy_progress
06/01/2026Fenestration and door U-factor and product ratingsKY FUenergy_progress
06/01/2026Interior lighting powerKY FUenergy_progress
06/01/2026MeteringKY FUenergy_progress
06/01/2026Fire-Resistance Rated ConstructionKY FUprogress
06/01/2026Energy Code Compliance InspectionsKY FUprogress
05/10/2026Fire-Resistant Penetrations and JointsKY FUspecial
05/10/2026Air barrier - visual inspectionKY FUenergy_progress
05/10/2026Insulation placement and R valuesKY FUenergy_progress
05/10/2026MeteringKY FUenergy_progress
05/10/2026Fenestration areasKY FUenergy_progress
05/10/2026Fenestration and door U-factor and product ratingsKY FUenergy_progress
05/10/2026Fenestration air leakageKY FUenergy_progress
05/10/2026Interior lighting powerKY FUenergy_progress
05/10/2026Energy Code Compliance InspectionsKY FUprogress
05/10/2026Fire-Resistance Rated ConstructionKY FUprogress
05/10/2026Maintenance informationKY FUenergy_progress
03/03/2025Fire-Resistance Rated ConstructionKY FUprogress
03/03/2025Fenestration and door U-factor and product ratingsKY FUenergy_progress
03/03/2025MeteringKY FUenergy_progress
Latest 25 of 112.
▾Documents — 139 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
08/27/2026B00910408-S2Request digital key ↗
08/27/2026B00910408-S1Request digital key ↗
08/27/2026B00910408-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION20
06/26/2025301299486Open ↗
06/26/2025301299495Open ↗
06/26/2025301300054Open ↗
Showing 3 of 20 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00926155-I1Open ↗
▸Seals & Professional Certifications58
▸DOB NOWProgress Inspector Seal & Signature26
09/01/2026B00910408-P2Open ↗
09/01/2026B00910408-P2Open ↗
09/01/2026B00910408-P3Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/27/2026B00910408-S1Open ↗
08/27/2026B00910408-I1Open ↗
08/27/2026B00910408-S2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026B00910408-P2Open ↗
09/01/2026B00910408-P3Open ↗
08/29/2026B00926155-P1Open ↗
Showing 3 of 12 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist8
08/26/2026B00926155-A1Open ↗
08/26/2026B00926155-P9Open ↗
08/13/2026B00926155-P8Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00926155-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00926155-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00926155-I1Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report20
08/27/2026B00910408-I1Open ↗
08/27/2026B00910408-S1Open ↗
08/27/2026B00910408-S2Open ↗
Showing 3 of 20 on file for this type
▸Other Documents9
▸DOB NOWProperty Ownership Certification8
08/26/2026B00926155-P4Open ↗
08/26/2026B00926155-I1Open ↗
08/26/2026B00926155-P5Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B00926155-I1Open ↗