← Back
BuildNYC
Two family frame
943 EAST 22ND STREET
BROOKLYN · BIN 3206263
💬 Discuss this project
1920Year Built
2.5Stories
B2Building Class
R4Zoning
2,712 sfGross Floor Area
2Units
Two family frame · Owner of record: Menora 943 · 4,000 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 20 docs
Floor 1Under Construction1p · 1 filing · 20 docs
CellarUnder Construction5p · 1 filing · 20 docs
Site & exteriorUnder Construction17p · 1 filing · 20 docs
Filed — no permit issued25p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Menora Properties910/16/2026
943LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sion Consulting Engineering709/24/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sion Consulting Engineering P203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Yafe MeodGeneral Contractor110/16/2026
Yafe MeodScaffold110/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sion Consulting Engineering1108107/30/2026
Building Lifecycle
All (68)Filed (7)Permit Issued (2)Objection (29)Special Inspection (30)
10/15/2026
Permit issued — Full Demolition
B01438555-I1-FD
10/06/2026
Objection raised — Other
10/02/2026
Permit issued — Construction Fence
B01296819-S3-FN
09/25/2026
Objection raised — Admin
09/24/2026
Filed — New Building
THIS APPLICATION IS FILED FOR NEW 2 STORY AND ATTIC 1 FAMILY BUILDING
B01441547-S2
09/15/2026
Objection resolved — Resolved
09/15/2026
Objection resolved — Resolved
09/15/2026
Objection resolved — Resolved
09/15/2026
Objection resolved — Resolved
09/15/2026
Objection resolved — Resolved
09/15/2026
Objection resolved — Resolved
09/15/2026
Objection resolved — Resolved
09/15/2026
Objection resolved — Resolved
09/15/2026
Objection resolved — Resolved
09/15/2026
Objection resolved — Resolved
09/15/2026
Objection resolved — Resolved
09/08/2026
Objection resolved — Resolved
09/08/2026
Objection resolved — Resolved
09/03/2026
Objection raised — Other
09/03/2026
Objection raised — Other
09/03/2026
Objection raised — Other
09/03/2026
Objection raised — Other
09/03/2026
Objection raised — Other
09/03/2026
Objection raised — Other
09/03/2026
Objection raised — Other
09/03/2026
Objection raised — Other
09/03/2026
Objection raised — Other
09/03/2026
Objection raised — Other
09/03/2026
Objection raised — Other
09/03/2026
Objection raised — Other
09/03/2026
Objection raised — Other
09/02/2026
Filed — Full Demolition
This is a full demolition, exempt from plan
B01438555-P1
09/01/2026
Special inspection requirement — Demolition
09/01/2026
Special inspection requirement — Structural Stability – Alterations of existing Buildings
08/10/2026
Filed — New Building
THIS APPLICATION IS FILED FOR NEW 2 STORY AND ATTIC 1 FAMILY BUILDING
B01441547-I1
08/06/2026
Special inspection requirement — Air barrier — testing
08/06/2026
Special inspection requirement — Ventilation and air distribution system
08/05/2026
Special inspection requirement — Exterior lighting power
08/05/2026
Special inspection requirement — Metering
08/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/05/2026
Special inspection requirement — Electric vehicle service equipment requirements
08/05/2026
Special inspection requirement — Fenestration areas
08/05/2026
Special inspection requirement — Maintenance information
08/05/2026
Special inspection requirement — Insulation placement and R values
08/05/2026
Special inspection requirement — Protection of exposed foundation insulation
08/05/2026
Special inspection requirement — Air barrier - visual inspection
08/05/2026
Special inspection requirement — Permanent certificate
08/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/05/2026
Special inspection requirement — Subgrade Inspections
08/05/2026
Special inspection requirement — Interior lighting power
08/05/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
08/05/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
08/05/2026
Special inspection requirement — Heating Systems
08/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/05/2026
Special inspection requirement — Energy Code Compliance Inspections
08/05/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/05/2026
Special inspection requirement — Mechanical Systems
08/05/2026
Special inspection requirement — Structural Cold-Formed Steel
08/05/2026
Special inspection requirement — Final
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionPermit IssuedYafe Meod10/15/2026
DOB NOWConstruction FencePermit IssuedYafe Meod10/02/2026
1 project · most recent 09/24/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/24/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Trane TUHMD120ACV5VB 60,000 BTU · Furnace ×2
Ventilation
Delta Breeze FV-1315RQ1 150 CFM · Exhaust Fan ×1
2 projects · most recent 09/24/2026
Storm Water/Sanitary
FiledStatusContractorScope
09/24/2026——Storm, Water/Sanitary
12/01/2025——Storm, Water/Sanitary
1 project · most recent 09/24/2026
Wood
FiledStatusContractorScope
09/24/2026——Wood
1 project · most recent 09/24/2026
Fence
FiledStatusContractorScope
09/24/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
09/01/2026Demolition—special
09/01/2026Structural Stability – Alterations of existing Buildings—special
08/06/2026Ventilation and air distribution system—energy_progress
08/06/2026Air barrier — testing —energy_progress
08/05/2026Fire-Resistant Penetrations and Joints—special
08/05/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
08/05/2026Subgrade Inspections—special
08/05/2026Permanent certificate—energy_progress
08/05/2026Footing and Foundation—progress
08/05/2026Final—progress
08/05/2026Fire-Resistance Rated Construction—progress
08/05/2026Energy Code Compliance Inspections—progress
08/05/2026Mechanical Systems—special
08/05/2026Structural Cold-Formed Steel—special
08/05/2026Subsurface Investigations (Borings/Test Pits)—special
08/05/2026Concrete - Cast-In-Place—special
08/05/2026Excavations - Sheeting, Shoring, and Bracing—special
08/05/2026Heating Systems—special
08/05/2026Fenestration air leakage—energy_progress
08/05/2026Shutoff dampers—energy_progress
08/05/2026HVAC-R and service water piping design and insulation—energy_progress
08/05/2026Metering—energy_progress
08/05/2026Exterior lighting power—energy_progress
08/05/2026HVAC-R and service water heating system controls—energy_progress
08/05/2026Fenestration areas—energy_progress
Latest 25 of 74.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/19/2026B01296819-I1Request digital key ↗
08/19/2026B01296819-S3Request digital key ↗
08/16/2026B01438555-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/16/2026B01441547-I1Open ↗
08/13/2026B01296819-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/16/2026B01441547-I1Open ↗
08/13/2026B01296819-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/16/2026B01441547-I1Open ↗
08/13/2026B01296819-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature7
10/05/2026B01438555-P1Open ↗
10/05/2026B01441547-S2Open ↗
08/19/2026B01296819-S3Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
09/28/2026B01441547-I1Open ↗
08/19/2026B01296819-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Trees Site Plan3
08/19/2026B01296819-I1Open ↗
08/16/2026B01441547-I1Open ↗
08/13/2026B01296819-I1Open ↗
▸DOB NOWStreet Tree Checklist1
09/28/2026B01441547-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/19/2026B01296819-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
10/05/2026B01438555-P1Open ↗
08/19/2026B01296819-S3Open ↗
08/19/2026B01296819-I1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports4
▸DOB NOWTR4 Test Report and Plot Diagram2
08/16/2026B01441547-I1Open ↗
08/13/2026B01296819-I1Open ↗
▸DOB NOWSOIL REPORT2
08/16/2026B01441547-I1Open ↗
08/13/2026B01296819-I1Open ↗
▸Other Documents12
▸DOB NOWProperty Ownership Certification4
10/05/2026B01438555-P1Open ↗
09/28/2026B01441547-I1Open ↗
08/19/2026B01296819-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
09/28/2026B01441547-I1Open ↗
08/19/2026B01296819-I1Open ↗
08/16/2026B01441547-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/16/2026B01441547-I1Open ↗
08/13/2026B01296819-I1Open ↗
▸DOB NOWStructure Photographs2
10/05/2026B01438555-P1Open ↗
08/16/2026B01438555-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01296819-I1Open ↗