← Back
Elevator cooperative
9430 RIDGE BOULEVARD
BROOKLYN · BIN 3155407
💬 Discuss this project
1953Year Built
6Stories
D4Building Class
R6AZoning
45,000 sfGross Floor Area
49Units
LL97 CoveredRent Stabilized3 Open Violations ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: 9430 RIDGE OWNERS CORP · 10,000 sf lot · 4.5 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BAY RIDGE MGMT. CORP.903/22/2026
9430 RIDGE OWNERS2503/22/2026
INTERSYSTEMS403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KZ ENGINEERING, P.C109/01/2023
CATALDO ENGINEERING, P.C.106/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RPO203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARSENAL SCAFFOLD INCGeneral Contractor203/21/2026
RCD RESTORATIONS INCGeneral Contractor203/21/2026
SUNBIRD ELECTRICAL CONTRElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CATALDO ENGINEERING, P.C.2174106/13/2023
Building Lifecycle
All (80)Filed (2)Permit Issued (2)Signed Off (2)Facade (FISP) (12)Violation (60)Special Inspection (2)
12/14/2023
Signed off — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00923306-I1
12/12/2023
Signed off — Alteration
Facade repair includes pointing, brick replacement, caulking, replacement of window lintel & installation of waterproofing & replacement of window sills and lintels.
B00855381-I1
09/01/2023
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00923306-I1
09/01/2023
Permit issued — Sidewalk Shed
B00923306-I1-SH
08/30/2023
Permit issued — General Construction
B00855381-I1-GC
06/13/2023
Filed — Alteration
Facade repair includes pointing, brick replacement, caulking, replacement of window lintel & installation of waterproofing & replacement of window sills and lintels.
B00855381-I1
04/05/2023
Special inspection requirement — Tenant Protection Plan Compliance
Thomas Cataldo
04/05/2023
Special inspection requirement — Final
Thomas Cataldo
03/24/2023
Violation issued (HPD, closed)
A
10/21/2022
Cycle 9 facade report submitted
10/21/2022
Cycle 9 facade report signed — SWARMP
10/20/2022
Cycle 9 facade inspection completed
03/01/2022
Violation issued (HPD, closed)
A
03/01/2022
Violation issued (HPD, closed)
I
01/21/2021
Violation issued (ECB, closed)
Elevators
05/27/2020
Violation issued (ECB, closed)
Elevators
05/08/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/16/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/04/2019
Cycle 8 facade inspection completed
04/01/2019
Cycle 8 facade report signed — SAFE
02/13/2019
Cycle 8 facade report submitted
03/27/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/28/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/16/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/13/2015
Violation issued (HPD, closed)
I
09/16/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/07/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/14/2013
Cycle 7 facade report submitted
01/14/2013
Cycle 7 facade report signed — SWARMP
01/08/2013
Cycle 7 facade inspection completed
12/21/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/14/2011
Violation issued (ECB, closed)
Elevators
01/27/2010
Violation issued (FDNY_ORDER, closed)
09/16/2008
Violation issued (HPD, closed)
B
09/16/2008
Violation issued (HPD, closed)
B
09/16/2008
Violation issued (HPD, closed)
B
05/14/2008
Violation issued (ECB, closed)
Boilers
03/25/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/04/2007
Violation issued (FDNY_NOV, closed)
10/16/2006
Violation issued (FDNY_NOV, closed)
04/19/2006
Violation issued (ECB, closed)
Elevators
10/01/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/17/2005
Cycle 6 facade report submitted
08/02/2005
Cycle 6 facade report signed — SWARMP
07/27/2005
Cycle 6 facade inspection completed
04/18/2005
Violation issued (ECB, closed)
Local Law
01/17/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/21/2004
Violation issued (FDNY_NOV, closed)
08/27/2004
Violation issued (ECB, closed)
Local Law
07/25/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/01/2003
Violation issued (ECB, closed)
Local Law
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/05/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/08/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/16/1999
Violation issued (HPD, closed)
A
06/16/1999
Violation issued (HPD, closed)
B
06/16/1999
Violation issued (HPD, closed)
B
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC09/01/2023
DOB NOWGeneral ConstructionSigned-offRCD RESTORATIONS INC08/30/2023
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING05/03/2018
BISOTISSUEDGA INDUSTRIES INC03/27/2018
BISOTISSUEDGA INDUSTRIES INC06/05/2017
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING05/08/2017
BISPLISSUEDSERVICE TECH MECH&PLBG IN07/05/2016
BISFSISSUEDGEECEE MECH SERVICE INC07/05/2016
BISOTISSUEDADVANCED CHIMNEY INC04/04/2016
BISMHISSUEDADVANCED CHIMNEY INC12/30/2015
BISOTISSUEDADVANCED CHIMNEY INC04/14/2014
BISPLISSUEDSERVICE TECH MECH&PLBG IN03/31/2014
BISOTISSUEDGEECEE MECHANICAL SERVICE03/31/2014
BISEQISSUEDINTERSYSTEMS CORPORATION12/01/2011
BISEQISSUEDINTERSYSTEMS CORPORATION12/01/2011
BISOTISSUEDFUTURA BUILDERS GROUP INC.10/02/2007
BISPLISSUEDPHILCO PLBG & HTG CORP02/05/2002
BISOTISSUEDZENON CONSTRUCTION01/22/2002
BISPLISSUEDRIO GRANDE PLUMBING & HEATING IN08/06/2001
BISOTISSUEDKNOCKOUT CONSTRUCTION & RENOVATI06/19/2001
BISSPISSUEDAPEC CORP08/11/1992
BISOTISSUEDPHOENIX COMBUSTION CORP12/23/1991
BISFSISSUEDEDWARD T. MINOR CO. INC.06/25/1991
2 projects · most recent 04/28/2025
General Wiring
FiledStatusContractorScope
04/28/2025CompleteSUNBIRD ELECTRICAL CONTRGeneral Wiring
08/23/2023CompleteNASH ELECTRIC SERVICES IN—
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
04/05/2023Tenant Protection Plan ComplianceThomas Cataldospecial
04/05/2023FinalThomas Cataldoprogress
▾Documents — 119 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026B00855381-I1Request digital key ↗
08/26/2026B00923306-I1Request digital key ↗
▸Applications & Permits28
▸BISWORK PERMIT APPLICATION19
05/04/2018340499222Open ↗
03/27/2018321587813Open ↗
06/07/2017321587813Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
03/01/2019321587813Open ↗
06/07/2017321587813Open ↗
05/06/2017340499222Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/26/2019321587813Open ↗
▸Seals & Professional Certifications36
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
03/18/2019321587813Open ↗
06/07/2017321587813Open ↗
05/03/2017340131342Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
06/07/2017321587813Open ↗
06/30/2014320942334Open ↗
12/01/2011320403826Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
12/01/2011320403826Open ↗
12/01/2011320403817Open ↗
11/28/2007310055891Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
05/06/2017340499222Open ↗
12/29/2015340340376Open ↗
06/30/2014320942334Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
05/06/2017340499222Open ↗
12/29/2015340340376Open ↗
03/31/2014340131342Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
05/06/2017340499222Open ↗
12/29/2015340340376Open ↗
03/31/2014340131342Open ↗
▸BISPC FULL REPORT2
11/28/2007310055891Open ↗
10/02/2007310035690Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00855381-I1Open ↗
08/13/2026B00923306-I1Open ↗
▸BISProfessional and Owner Certification (POC3)1
06/07/2017321587813Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026B00855381-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026B00855381-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
03/31/2014340131342Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/31/2014340131342Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
06/07/2017321587813Open ↗
05/06/2017340499222Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
12/01/2011320403817Open ↗
▸Environmental & Asbestos9
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
06/07/2017321587813Open ↗
12/29/2015340340376Open ↗
06/30/2014320942334Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
12/01/2011320403826Open ↗
10/02/2007310035690Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
12/01/2011320403817Open ↗
11/28/2007310055891Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00855381-I1Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
06/07/2017321587813Open ↗
05/03/2017340131342Open ↗
06/30/2014320942334Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/29/2015340340376Open ↗
03/31/2014340131342Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/29/2015340340376Open ↗
03/31/2014340131342Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
03/18/2019321587813Open ↗
05/03/2017340131342Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
05/06/2017340499222Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/06/2017340499222Open ↗
12/29/2015340340376Open ↗
03/31/2014340131342Open ↗
▸Approvals, Objections & Sign-offs9
▸BISADMINISTRATIVE OBJECTIONS5
06/30/2014320942334Open ↗
12/01/2011320403826Open ↗
12/01/2011320403817Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/18/2019321587813Open ↗
05/03/2017340131342Open ↗
07/17/2008310035690Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/03/2017340131342Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
06/07/2017321587813Open ↗
05/03/2017340131342Open ↗
12/29/2015340340376Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET3
06/09/2017321587813Open ↗
12/01/2011320403826Open ↗
12/01/2011320403817Open ↗
▸BISADDITIONAL INFORMATION3
11/03/2017321587813Open ↗
02/22/2016340340376Open ↗
02/22/2016320942334Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
05/06/2017340499222Open ↗
12/29/2015340340376Open ↗
03/31/2014340131342Open ↗
▸BISBOROUGH INTAKE FORM1
03/18/2019321587813Open ↗