945 EAST 9TH STREET
BROOKLYN · BIN 3170983
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R2XZoning
2,364 sfGross Floor Area
1Units
1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 945 E 9 St LLC C/O Mark Adjmi · 4,000 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSolar array installation1p · 2 filings · 20 docs
AtticUnder Construction24p · 2 filings · 20 docs
Floor 317p · 1 filing · 20 docs
Floor 2Under Construction44p · 3 filings · 20 docs
Floor 1Under Construction42p · 3 filings · 20 docs
CellarUnder Construction42p · 3 filings · 20 docs
Site & exteriorProposed wood construction fence for residenceUnder Construction25p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Adjmi Construction307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HY PE Structural Engineering307/09/2025
Cornerstone Designs506/09/2025
Tom Petersen Architect103/13/2025
Levin Engineering102/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Yona Love Consulting Services403/21/2026
Levin Engineering203/21/2026
Cornerstone Designs103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
F.S. SitePlumbing609/19/2026
MJM Associates ConstructionGeneral Contractor403/21/2026
Yafe MeodGeneral Contractor307/08/2026
F.S. SiteFire Protection309/19/2026
MJM Associates ConstructionScaffold104/09/2026
NYS Essential PowerGeneral Contractor107/08/2026
Yafe MeodScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Regional Testing394707/09/2025
Thomas Petersen Architect7854103/13/2025
Levin Engineering1267102/08/2023
Building Lifecycle
All (118)Filed (10)Permit Issued (17)Signed Off (2)Violation (7)Inspection (4)Objection (50)Special Inspection (28)
09/18/2026
Permit issued — Plumbing
B00822083-I1-EW-SP
09/18/2026
Permit issued — Plumbing
B00811874-S1-PL
09/18/2026
Permit issued — Plumbing
B00822083-I1-PL
08/27/2026
Signed off — Alteration
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
B01194996-I1
06/11/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
06/08/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/02/2026
Permit issued — General Construction
B00811874-I1-GC
12/03/2025
Signed off — Alteration
B00808492-I1
08/15/2025
Permit issued — Sprinklers
B00822083-I1-EW-SP
07/25/2025
Permit issued — Plumbing
B00811874-S1-PL
07/25/2025
Permit issued — Plumbing
B00822083-I1-PL
07/23/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Paul Raymond
07/23/2025
Special inspection requirement — Subgrade Inspections
Paul Raymond
07/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Paul Raymond
07/23/2025
Special inspection requirement — Footing and Foundation
Paul Raymond
07/23/2025
Special inspection requirement — Underpinning
Paul Raymond
07/09/2025
Filed — Alteration
Support of excavation
B00910275-P1
07/09/2025
Special inspection requirement — Underpinning
Paul Raymond
07/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Paul Raymond
07/09/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Paul Raymond
07/09/2025
Special inspection requirement — Footing and Foundation
Paul Raymond
07/09/2025
Special inspection requirement — Subgrade Inspections
Paul Raymond
06/25/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
06/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
06/25/2025
Special inspection requirement — Permanent certificate
Paul Raymond
06/09/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Alter and enlarge existing one family residence
B00811874-P3
05/20/2025
Permit issued — Structural
B00910275-I1-GC
05/20/2025
Permit issued — Construction Fence
B00808492-I1-FN
05/20/2025
Permit issued — General Construction
B00811874-I1-GC
05/13/2025
Violation issued (ECB, closed)
Unknown
05/08/2025
Violation issued (ECB, closed)
Site Safety
05/08/2025
Violation issued (ECB, closed)
Construction
05/08/2025
Violation issued (ECB, closed)
Unknown
05/07/2025
Violation issued (ECB, closed)
Unknown
05/07/2025
Violation issued (ECB, closed)
Unknown
04/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/19/2025
Permit issued — Solar
B01194996-I1-SL
03/13/2025
Filed — Alteration
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
B01194996-I1
02/21/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/24/2024
Permit issued — Plumbing
B00811874-S1-PL
07/24/2024
Permit issued — Plumbing
B00822083-I1-PL
07/24/2024
Permit issued — Sprinklers
B00822083-I1-EW-SP
04/24/2024
Violation issued (ECB, open)
Unknown
02/14/2024
Objection resolved — Addressed
02/14/2024
Objection resolved — Addressed
01/31/2024
Objection raised — Other
01/31/2024
Objection raised — Other
01/16/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Alter and enlarge existing one family residence
B00811874-P1
01/05/2024
Permit issued — Foundation
B00910275-I1-GC
01/04/2024
Permit issued — Support of Excavation
B00910275-S1-SE
12/19/2023
Permit issued — Construction Fence
B00808492-I1-FN
12/19/2023
Objection resolved — Addressed
10/18/2023
Objection raised — Other
10/16/2023
Filed — Alteration
Support of excavation
B00910275-S1
09/26/2023
Objection resolved — Addressed
09/26/2023
Objection resolved — Addressed
09/26/2023
Objection resolved — Addressed
09/26/2023
Objection resolved — Addressed
09/26/2023
Objection resolved — Addressed
08/23/2023
Objection raised — Structural
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedF.S. Site09/18/2026
DOB NOWPlumbingPermit IssuedF.S. Site09/18/2026
DOB NOWPlumbingPermit IssuedF.S. Site09/18/2026
DOB NOWGeneral ConstructionPermit IssuedYafe Meod06/02/2026
DOB NOWSprinklersPermit IssuedAlan J. Brutosky Plumbing Con08/15/2025
DOB NOWPlumbingPermit IssuedAlan J Brutosky PLBR Cont07/25/2025
DOB NOWPlumbingPermit IssuedAlan J Brutosky PLBR Cont07/25/2025
DOB NOWStructuralPermit IssuedYafe Meod05/20/2025
DOB NOWConstruction FenceSigned-offYafe Meod05/20/2025
DOB NOWGeneral ConstructionPermit IssuedYafe Meod05/20/2025
DOB NOWSolarSigned-offNYS Essential Power03/19/2025
DOB NOWPlumbingPermit IssuedAlan J Brutosky PLBR Cont07/24/2024
DOB NOWPlumbingPermit IssuedAlan J Brutosky PLBR Cont07/24/2024
DOB NOWSprinklersPermit IssuedAlan J. Brutosky Plumbing Con07/24/2024
DOB NOWFoundationPermit IssuedMJM Associates Construction01/05/2024
DOB NOWSupport of ExcavationPermit IssuedMJM Associates Construction01/04/2024
DOB NOWConstruction FenceSigned-offMJM Associates Construction12/19/2023
1 project · most recent 02/08/2023
FiledStatusContractorScope
02/08/2023Permit IssuedF.S. Site62 heads
2 projects · most recent 06/09/2025
Water/Sanitary Gas Storm
FiledStatusContractorScope
06/09/2025Permit IssuedF.S. SiteGas, Storm, Water/Sanitary
02/08/2023Permit IssuedF.S. SiteWater/Sanitary
2 projects · most recent 04/27/2026
General Wiring
FiledStatusContractorScope
04/27/2026CompleteAmber Electl Contng—
02/04/2025Permit IssuedNapstar ElectricGeneral Wiring
1 project · most recent 07/09/2025
Steel Concrete
FiledStatusContractorScope
07/09/2025Permit IssuedYafe MeodSteel, Concrete
1 project · most recent 03/13/2025
FiledStatusContractorScope
03/13/2025Signed-offNYS Essential Power10 panels, 4.25 kw, 2,000 roof_area_sqft
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/11/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
06/08/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/21/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
07/23/2025Excavations - Sheeting, Shoring, and BracingPaul Raymondspecial
07/23/2025Subgrade InspectionsPaul Raymondspecial
07/23/2025Structural Stability – Alterations of existing buildingsPaul Raymondspecial
07/23/2025Footing and FoundationPaul Raymondprogress
07/23/2025UnderpinningPaul Raymondspecial
07/09/2025UnderpinningPaul Raymondspecial
07/09/2025Structural Stability – Alterations of existing buildingsPaul Raymondspecial
07/09/2025Excavations - Sheeting, Shoring, and BracingPaul Raymondspecial
07/09/2025Footing and FoundationPaul Raymondprogress
07/09/2025Subgrade InspectionsPaul Raymondspecial
06/25/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
06/25/2025Fire-Resistant Penetrations and JointsPaul Raymondspecial
06/25/2025Permanent certificatePaul Raymondenergy_progress
05/18/2023Insulation placement and R valuesPaul Raymondenergy_progress
05/18/2023Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
05/18/2023Interior lighting powerPaul Raymondenergy_progress
05/18/2023Maintenance informationPaul Raymondenergy_progress
05/18/2023Fenestration areasPaul Raymondenergy_progress
05/18/2023Electric vehicle service equipment requirementsPaul Raymondenergy_progress
05/18/2023Air barrier — testing Paul Raymondenergy_progress
05/18/2023Air barrier - visual inspectionPaul Raymondenergy_progress
05/18/2023Protection of exposed foundation insulationPaul Raymondenergy_progress
05/18/2023Fenestration air leakagePaul Raymondenergy_progress
05/18/2023Permanent certificatePaul Raymondenergy_progress
05/18/2023MeteringPaul Raymondenergy_progress
Latest 25 of 28.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/28/2026B00808492-I1Request digital key ↗
08/27/2026B00811874-P3Request digital key ↗
08/26/2026B00910275-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
08/17/2023340879856Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00811874-I1Open ↗
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature17
09/01/2026B00910275-P1Open ↗
09/01/2026B00910275-S1Open ↗
08/25/2026B00811874-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026B00910275-P1Open ↗
09/01/2026B00910275-P1Open ↗
09/01/2026B00910275-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026B00808492-I1Open ↗
08/26/2026B00910275-P1Open ↗
08/26/2026B00910275-S1Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/16/2023340879856Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B00811874-I1Open ↗
▸Safety & Tenant Protection2
▸BISBPP: STREET TREES SITE PLAN1
08/16/2023340879856Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00811874-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026B00910275-I1Open ↗
08/22/2026B01194996-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/22/2026B01194996-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
08/17/2023340879856Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/16/2023340879856Open ↗
▸Other Documents11
▸BISBPP - SUPPORTING DOCUMENTATION3
08/16/2023340879856Open ↗
08/16/2023340879856Open ↗
08/16/2023340879856Open ↗
▸DOB NOWPlot Diagram2
08/13/2026B00910275-S1Open ↗
08/13/2026B00910275-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00811874-I1Open ↗
08/13/2026B00910275-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00910275-I1Open ↗
08/13/2026B00910275-S1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B00811874-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B00811874-I1Open ↗