DOB04/25/2024AT TIME OF INSPECTION OBSERVED, BUILDING AT THE MIDDLE DISPLACED AND HAVE SPACE APPROX. 1FEET,ROOF COLLAPSE, EXP# 4 WALL BULGING AND PARTIALLY COLLAPSE, BUILDING REAR SIDE PARTIALLY COLLAPSE INTO THE WATER. VACATE ENTIRE BUILDING.
Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)