Public elementary, junior or senior high
Ebbets Field Middle School
945 FRANKLIN AVENUE · BIN 3034356
💬 Discuss this project
1968Year Built
4Stories
W1Building Class
R6Zoning
143,352 sfGross Floor Area
4Units
LL97 Covered6 Open Violations 0 unresolved · 6 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 138,574 sf lot · 1.03 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction34p · 1 filing · 20 docs
Floor 4Under Construction19p · 1 filing · 20 docs
Floor 3Under Construction13p · 1 filing · 20 docs
Floor 2Under Construction14p · 1 filing · 20 docs
Floor 1Under Construction15p · 2 filings · 20 docs
CellarUnder Construction21p · 1 filing · 20 docs
Sub-BasementUnder Construction13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY3607/08/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION603/22/2026
DEPT OF EDUCATION I.S.320203/22/2026
DEPT OF EDUCATION P.S.375603/22/2026
PS 375 DOE603/22/2026
DOE PS 375503/22/2026
D.O.E. P.S.375 0103/22/2026
DOE PS 375 040403/22/2026
DOE 040103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY303/21/2026
AK CONSULTING SERVICES1003/21/2026
MUNICIPAL BUILDING CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AKAL BUILDERS OF NY INCGeneral Contractor1807/08/2026
THERMO TECH MECHANICAL I*General Contractor307/08/2026
FRANCIS RICHARDSElectrical203/21/2026
CORDOVA, MARIAElectrical103/21/2026
GIOVANNI DITURIElectrical103/21/2026
HALLERMAN, DElectrical103/21/2026
JEFFERSON NECKLESElectrical103/21/2026
JOSHUA ANDERSONElectrical103/21/2026
ACE ELEC'L CONSTRUCTIONElectrical103/22/2026
FRANCO BELLI PLMG&HTG SONPlumbing106/28/2026
AUJLA ELECTRIC CORPElectrical103/22/2026
CHARAN ELEC'L ENTERP'S INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC LOGISTICS DBA JPCL EN351111/07/2025
TWIN PEAKS INC.317502/17/2025
Building Lifecycle
All (132)Filed (12)Permit Issued (18)Violation (60)Inspection (3)Objection (9)Special Inspection (30)
06/23/2026
Violation issued (ECB, open)
Construction
03/31/2026
Permit issued — Mechanical Systems
B00955407-S2-MS
02/13/2026
Violation issued (ECB, open)
Construction
01/12/2026
Permit issued — Plumbing
B00955407-S1-PL
01/08/2026
Permit issued — Mechanical Systems
B00955407-S2-MS
12/22/2025
Permit issued — Supported Scaffold
B01163237-I1-SF
12/22/2025
Permit issued — General Construction
B00955407-I1-GC
12/22/2025
Permit issued — Protection and Mechanical Methods
B01181600-I1-PMM
12/22/2025
Permit issued — Sidewalk Shed
B01163233-I1-SH
12/22/2025
Permit issued — Construction Fence
B01163223-I1-FN
12/22/2025
Permit issued — Support of Excavation
B01179446-I1-SE
12/22/2025
Permit issued — General Construction
B00955407-I1-ST
12/15/2025
Objection resolved — Resolved
12/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
12/15/2025
Special inspection requirement — Maintenance information
Asma Hashmi
12/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
12/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
12/11/2025
Objection resolved — Resolved
11/14/2025
Objection raised — Scope
11/14/2025
Objection raised — Zoning
11/14/2025
Objection raised — Scope
11/07/2025
Filed — Alteration
INSTALLATION OF NEW SUPPLEMENTAL AC SYSTEM IN FIRST FLOOR KITCHEN
B01297108-I1
10/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
10/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
10/30/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
10/02/2025
Special inspection requirement — Final
Asma Hashmi
10/02/2025
Special inspection requirement — Mechanical Systems
Asma Hashmi
07/07/2025
Violation issued (FDNY_ORDER, closed)
05/07/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/14/2025
Violation issued (FDNY_NOV, closed)
03/24/2025
Permit issued — Protection and Mechanical Methods
B01181600-I1-PMM
03/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/17/2025
Filed — Alteration
INSTALLATION OF DEBRIS CHUTE FOR PS 375K AT 46 MACKEEVER PLACE, BROOKLYN AS PER INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01181600-I1
03/17/2025
Permit issued — Mechanical Systems
B00955407-S2-MS
03/17/2025
Permit issued — General Construction
B00955407-I1-ST
03/17/2025
Permit issued — Structural
B00955407-I1-GC
03/07/2025
Permit issued — Support of Excavation
B01179446-I1-SE
02/28/2025
Objection resolved — Addressed
02/26/2025
Permit issued — Supported Scaffold
B01163237-I1-SF
02/24/2025
Objection raised — Other
02/21/2025
Permit issued — Construction Fence
B01163223-I1-FN
02/17/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION SHORING FOR EXCAVATION AS INDICATED ON PLANS.THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01179446-I1
02/12/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 375K AT 46 MACKEEVER PLACE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01163223-I1
02/11/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MIKHAIL ZEYGMAN
02/07/2025
Permit issued — Sidewalk Shed
B01163233-I1-SH
02/05/2025
Objection resolved — Addressed
01/24/2025
Objection raised — Other
01/17/2025
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED FOR PS 375K AT 46 MACKEEVER PLACE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01163233-I1
01/17/2025
Filed — Alteration
B01163237-I1
01/14/2025
Filed — Alteration
B01127905-S2
11/12/2024
Filed — Alteration
B01127905-S1
11/01/2024
Filed — Alteration
B01127905-I1
10/16/2024
Special inspection requirement — Final
08/29/2024
Violation issued (FDNY_NOV, closed)
08/29/2024
Violation issued (FDNY_NOV, closed)
06/13/2024
Violation issued (ECB, closed)
Construction
06/13/2024
Violation issued (ECB, open)
Construction
06/13/2024
Violation issued (ECB, closed)
Construction
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedTHERMO TECH MECHANICAL I*03/31/2026
DOB NOWPlumbingPermit IssuedFRANCO BELLI PLMG&HTG SON01/12/2026
DOB NOWMechanical SystemsPermit IssuedTHERMO TECH MECHANICAL I*01/08/2026
DOB NOWSupported ScaffoldPermit IssuedAKAL BUILDERS OF NY INC12/22/2025
DOB NOWGeneral ConstructionPermit IssuedAKAL BUILDERS OF NY INC12/22/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedAKAL BUILDERS OF NY INC12/22/2025
DOB NOWSidewalk ShedPermit IssuedAKAL BUILDERS OF NY INC12/22/2025
DOB NOWConstruction FencePermit IssuedAKAL BUILDERS OF NY INC12/22/2025
DOB NOWSupport of ExcavationPermit IssuedAKAL BUILDERS OF NY INC12/22/2025
DOB NOWGeneral ConstructionPermit IssuedAKAL BUILDERS OF NY INC12/22/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedAKAL BUILDERS OF NY INC03/24/2025
DOB NOWMechanical SystemsPermit IssuedTHERMO TECH MECHANICAL I*03/17/2025
DOB NOWGeneral ConstructionPermit IssuedAKAL BUILDERS OF NY INC03/17/2025
DOB NOWStructuralPermit IssuedAKAL BUILDERS OF NY INC03/17/2025
DOB NOWSupport of ExcavationPermit IssuedAKAL BUILDERS OF NY INC03/07/2025
DOB NOWSupported ScaffoldPermit IssuedAKAL BUILDERS OF NY INC02/26/2025
DOB NOWConstruction FencePermit IssuedAKAL BUILDERS OF NY INC02/21/2025
DOB NOWSidewalk ShedPermit IssuedAKAL BUILDERS OF NY INC02/07/2025
BISOTISSUEDINDEPENDENT TEMPERATURE03/20/2025
BISOTISSUEDINDEPENDENT TEMPERATURE03/20/2025
BISOTISSUEDINDEPENDENT TEMPERATURE03/20/2025
BISMHISSUEDINDEPENDENT TEMPERATURE03/20/2025
BISOTISSUEDINDEPENDENT TEMPERATURE03/27/2024
BISOTISSUEDINDEPENDENT TEMPERATURE03/27/2024
BISMHISSUEDINDEPENDENT TEMPERATURE03/27/2024
BISOTISSUEDINDEPENDENT TEMPERATURE03/27/2024
BISPLISSUEDVITAL PLUMBING, INC08/02/2023
BISOTISSUEDINDEPENDENT TEMPERATURE03/28/2023
BISMHISSUEDINDEPENDENT TEMPERATURE03/24/2023
BISOTISSUEDINDEPENDENT TEMPERATURE03/24/2023
BISOTISSUEDINDEPENDENT TEMPERATURE03/24/2023
BISPLISSUEDVITAL PLUMBING, INC08/04/2022
BISOTISSUEDINDEPENDENT TEMPERATURE03/28/2022
BISOTISSUEDINDEPENDENT TEMPERATURE03/28/2022
BISMHISSUEDINDEPENDENT TEMPERATURE03/28/2022
BISOTISSUEDINDEPENDENT TEMPERATURE03/28/2022
BISPLISSUEDVITAL PLUMBING, INC08/03/2021
BISOTISSUEDINDEPENDENT TEMPERATURE03/25/2021
BISOTISSUEDINDEPENDENT TEMPERATURE03/25/2021
BISMHISSUEDINDEPENDENT TEMPERATURE03/25/2021
+ 28 more permits on file
1 project · most recent 11/07/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/07/2025——Air Conditioning Systems
Cooling
Lg ZRNU363SRAA 35,000 BTU · Vrf Indoor ×2
ZRNU123SRAA 12,300 BTU · Vrf Indoor ×1
ZRNU243SRAA 24,200 BTU · Vrf Indoor ×1
ZRUM048GSS0 48,000 BTU · Vrf Outdoor ×1
ZRUM060GSS0 60,000 BTU · Vrf Outdoor ×1
14 projects · most recent 01/30/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
01/30/2026Permit IssuedSTANCO SYSTEM ELEC'L CONTGeneral Wiring
12/12/2025Permit IssuedACE ELEC'L CONSTRUCTIONGeneral Wiring
01/17/2025Permit IssuedAUJLA ELECTRIC CORP—
09/06/2024Permit IssuedLABCO ELETRT CONTNG CORPGeneral Wiring
03/06/2023CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
09/09/2022CompleteCHARAN ELEC'L ENTERP'S IN—
08/17/2022CompleteCHARAN ELEC'L ENTERP'S IN—
05/04/2021Permit IssuedGEMINI ELECTRIC CO., INC.General Wiring
04/29/2021Permit IssuedA & S ELECTRIC INC.General Wiring
12/04/2020CompleteMAINSTREAM ELECTRIC, INC.General Wiring
03/19/2019CompleteCHARAN ELEC'L ENTERP'S IN—
08/14/2018Permit IssuedR.M.F. ELECTRIC INC.HVAC Wiring
05/18/2018CompleteCHARAN ELEC'L ENTERP'S IN—
05/09/2018CompleteCHARAN ELEC'L ENTERP'S IN—
1 project · most recent 02/17/2025
FiledStatusContractorScope
02/17/2025Permit IssuedAKAL BUILDERS OF NY INC1 scope_items
2 projects · most recent 02/12/2025
Fence Sidewalk Shed
FiledStatusContractorScope
02/12/2025Permit IssuedAKAL BUILDERS OF NY INCFence
01/17/2025Permit IssuedAKAL BUILDERS OF NY INCSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/07/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/30/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
12/15/2025HVAC-R and service water heating system controlsAsma Hashmienergy_progress
12/15/2025Maintenance informationAsma Hashmienergy_progress
12/15/2025HVAC-R and service water heating equipmentAsma Hashmienergy_progress
12/15/2025HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
10/30/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
10/30/2025Energy Code Compliance InspectionsAsma Hashmiprogress
10/30/2025Post-installed AnchorsAsma Hashmispecial
10/02/2025FinalAsma Hashmiprogress
10/02/2025Mechanical SystemsAsma Hashmispecial
03/18/2025Fire-Resistant Penetrations and Joints—special
02/11/2025Excavations - Sheeting, Shoring, and BracingMIKHAIL ZEYGMANspecial
10/16/2024Final—progress
04/10/2024HVAC-R and service water piping design and insulationMIKHAIL ZEYGMANenergy_progress
04/10/2024HVAC-R and service water heating equipmentMIKHAIL ZEYGMANenergy_progress
04/10/2024Maintenance informationMIKHAIL ZEYGMANenergy_progress
04/10/2024HVAC-R and service water heating system controlsMIKHAIL ZEYGMANenergy_progress
04/10/2024Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
04/10/2024Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
04/03/2024Protection of exposed foundation insulationMIKHAIL ZEYGMANenergy_progress
03/04/2024Post-installed AnchorsMIKHAIL ZEYGMANspecial
03/04/2024Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
03/01/2024Air barrier - visual inspectionMIKHAIL ZEYGMANenergy_progress
03/01/2024Insulation placement and R valuesMIKHAIL ZEYGMANenergy_progress
03/01/2024Fenestration and door U-factor and product ratingsMIKHAIL ZEYGMANenergy_progress
03/01/2024Concrete - Cast-In-PlaceMIKHAIL ZEYGMANspecial
Latest 25 of 38.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 375Education—
Project B01181600 Alteration · Permit Entire · 03/17/2025
Project B01179446 Alteration · Permit Entire · 02/17/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 137 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/25/2026B00955407-S2Request digital key ↗
08/25/2026B00955407-S3Request digital key ↗
08/25/2026B00955407-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION3
09/10/2019321976965Open ↗
07/11/2019321976965Open ↗
06/30/2017340519576Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
08/22/2019321976965Open ↗
08/22/2019321976965Open ↗
08/22/2019321976965Open ↗
▸BISWORK PERMIT APPLICATION2
03/28/2018340519576Open ↗
06/30/2017340519576Open ↗
▸Seals & Professional Certifications48
▸DOB NOWProgress Inspector Seal & Signature14
08/26/2026B00955407-S2Open ↗
08/26/2026B00955407-S2Open ↗
08/26/2026B00955407-S2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/23/2026B01127905-S2Open ↗
08/23/2026B01127905-S1Open ↗
08/23/2026B01127905-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
08/26/2026B00955407-S2Open ↗
08/26/2026B00955407-S2Open ↗
08/26/2026B00955407-S2Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/11/2019321976965Open ↗
06/30/2017340519576Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/10/2019321976965Open ↗
07/11/2019321976965Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
11/14/2019321976965Open ↗
07/11/2019321976965Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/30/2017340519576Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/30/2017340519576Open ↗
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/13/2026B01163237-I1Open ↗
08/13/2026B01163223-I1Open ↗
08/13/2026B01163233-I1Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/11/2019321976965Open ↗
06/30/2017340519576Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B00955407-S1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01179446-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/14/2019321976965Open ↗
07/11/2019321976965Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/30/2017340519576Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/30/2017340519576Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/19/2019321976965Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/30/2017340519576Open ↗
▸Approvals, Objections & Sign-offs34
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/23/2026B01163237-I1Open ↗
08/13/2026B01127905-I1Open ↗
08/13/2026B01127905-S1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)12
08/13/2026B01127905-S2Open ↗
08/13/2026B01163223-I1Open ↗
08/13/2026B01163237-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/13/2026B00955407-S3Open ↗
08/13/2026B00955407-S2Open ↗
08/13/2026B00955407-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/13/2026B00955407-S2Open ↗
08/13/2026B00955407-S1Open ↗
08/13/2026B00955407-I1Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
06/30/2017340519576Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/14/2019321976965Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
11/14/2019321976965Open ↗
07/11/2019321976965Open ↗
06/30/2017340519576Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET1
07/11/2019321976965Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/30/2017340519576Open ↗
▸BISBOROUGH INTAKE FORM1
11/14/2019321976965Open ↗
▸Other Documents15
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal12
08/13/2026B00955407-I1Open ↗
08/13/2026B01127905-I1Open ↗
08/13/2026B00955407-S1Open ↗
Showing 3 of 12 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/11/2019321976965Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
07/11/2019321976965Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01179446-I1Open ↗